Professional Documents
Culture Documents
Mr.R.Ravindran - Deputy General Manager - Mechanical
Mr.R.Ravindran - Deputy General Manager - Mechanical
3. Nationality : Indian
Management Activities:
Project Management exposure for huge capital investment
projects handled successfully by me.
Project cost estimation & cost reduction possibilities and
budgeting for future projects on case to case basis during R&D
progress was done.
Database Management & MIS (Management information
system), Data management system implementation in SAP for
drawing, design documents, manuals etc.
Work Strategy, Time Management & annual budgeting of projects
and Business development,
Motivating Team members to extract best Job output with
minimum available resources.
Good Technical& Commercial Due Diligence exposure due to
having lot of discussions with Investors & IPP customer & retail
turbine customers from India and Abroad. Meeting with due
diligence team and answering about our wind turbine technology
related queries.
Conducting Regular interdepartmental meeting & Training and
development to keep team motivated.
Selection of suitable team members & consultants to execute the
project & maintain the schedule of completion in planned date.
Improved safety of Engineers in the design level for ensuring the
safety of people working at height’s at high winds.
knowledge gained from German Doctorates & Engineers to work
in full 360 degree of Engineering activity of a project from scratch
level from concept of Design, Procurement, Production, Quality
inspection, Erection & commissioning & also Operation
maintenance of wind turbine of larger MW turbine and also
working exposure with accredited Design approval groups like
TUV sud , TUV Nord , DNVGL and Type testing organization like
wind test GmbH.
Preparation of weekly, monthly & quarterly progress report to
management including any critical issues & to take technical
decisions and process for final commercial approval to senior
management.
To expedite execution at Sites, vendor premises and utility
offices.
Technical verification of commercial invoices and other
documents and forward to finance for payment process with
recommendation.
To analysis tenders (Domestic & International), Marketing
Queries, International Projects on techno commercial ground &
A00F006e Seite 3 von 5 Rev.02/03.11
study the feasibility of the project with given technical
requirements.
To evacuation & preparation of pre-qualification documents
including Involvement in preparation of execution strategy,
defining scope of work & raising technical deviations &
clarifications etc.
A realistic delivery commitment based on collective agreement
and development of internal/external pre & post order
communication & documentation.
Building end to end project tracking mechanism for deliverables,
adherence to contract terms, ensuring stage wise documentation
of project and building more transparent internal/external
communication.
Key Skills :
3D modeling with Pro E , Design, Detail drawing , Bill of Material,
Technical Documents preparation , manual calculation and
optimization of mechanical systems with the help of FEM tools.
Detailed knowledge of the mechanical aspects of wind turbines,
theoretical and practical experiences with both geared and
gearless wind turbines.
Good Interpersonal, Business development and Managerial skill
for handling large team and good man management.
Energetic Hard worker and willingness to learn.
Already undergone Advanced German language training, full time
for three months, a Certified course in Max Mueller Bhavan,
Gothic institute Chennai , India.
Undergone Bladed software training at UK for 1 week.
Worked almost for 6 years in wind gear box unit design for 1MW,
1.5MW& 2.1MW model gearbox supplied to Suzlon and Vestas
wind turbines OEM companies.
Handled a complete project in Wind and Industrial Gearbox in
during at Flender. Work Involved Layout Preparation, Shaft
calculation, Pinion & Gear calculations, selection of bearings,
bearing load & life calculations, Part Drawings, Assembly, Piping
plan & Installation drawings and complete part list preparations
for assembly, piping, installation Drawings in gearbox types.
Housing drawing design and development for gearbox in both
Casting and Welded types for manufacturing in Flender AG
Germany.
Selection of suitable size of fasteners, tolerance values, surface
finish etc. for manufacturing the gearbox sub components.
Assembly drawing preparation with selection of bearings,