Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

V``CURRICULUM VITAE

1. First name : Ravindran. R

2. Date of birth : 30/10/1972

3. Nationality : Indian

4. Civil status : Married

5. Education : B.E(Mechanical)., M.B.A

Institution Date Degrees / Diplomas:


from (months/year)
to (months/years)
University of Madras, 2003 to 2005 M.B.A (Personnel
Chennai Management)
Bharath Engineering 1990 to 1995 B.E.(Mechanical)
College, Chennai

6. Language Skills: (Mark 1 to 5 for competence, where 5 is the highest)

Language Reading Speaking Writing


Tamil 5 5 5
English 5 5 5
German 5 5 5

7. Membership of Professional Bodies: MMA, SECI.

8. Other Skills (e.g. computer, literacy, etc.):

• Language - Basic, Fortran, C & C++, Java.


• RDBMS - MS SQL 6.5, Visual Basic 6.0, ASP.
• AutoCAD, Certified by AutoCAD Inc. USA.
• CADOVERLAY, Tracker, Cable CAD, Scanner, MEDUSA.
• CATIA, Modularis, Pro-Engineer - Wild fire ,Creo
• Bladed - Aerodynamic Load calculation tool,
• FEA - Finite element analysis Ansys & Fatigue Calculations Software
• Hardware – i7 , Sun Solaris, Unix Workstation
• Software – windographer, Wasp, Winfarmer, MS Office.

9. Present Position: Deputy General Manager

10. Total Experience: 23 + years

A00F006e Seite 1 von 5 Rev.02/03.11


11. Professional Experience Record:
Date: Since November 2017
Company: TUV India Pvt Ltd, Chennai
Position: Deputy General Manager – Technical Head - Renewables
Description: Key Responsibilities:
 Project Manager for India’s largest 3 MW/2.8 MW Proto Turbine
developments worked along with German Engineering team
and completed successfully the design and got Type Certificate
which is presently listed WTG in the RLMM by MNRE for
permitting to sell in Indian Market.
 Technical Due Diligence for Wind & Solar projects.
 Hands on experience in Pre-Feasibility site Assessment and
Study of Green field.
 Hands on experience Wind Certification on IEC 61400,
 Hands on experience Wind Resources Assessment,
 Hands on experience Power Curve Measurements,
 Knowledge on all IEC 61400 & GL2010 standards,
 Knowledge of QA/QC/QMS,
 Hands on experience in Project Management.

Date: June 2008 to November 2017


Company: Regen powertech Pvt.Ltd
Position: Deputy General Manager – Renewables
Description: Key Responsibilities:
 Completion of Manufacturing Evaluation Audits (Assessment ,
Proto Development, Process audits) at various vendors for wind
turbine critical components(example machinery components ,
drives, Generator coils, lamination, Nacelle & Hub assembly) as
per GL 2010 guidelines, IEC 61400 Standards, DNV-GL
Regulations during development.
 Complete know how of designing a wind turbine from scratch to
final proto turbine testing at factory and at site and also
completed erection and commissioning of turbine at field ,
excellent knowledge in DIN standards and wind turbine design
standards like GL2003, GL2010,DNV & IEC 61400-1 edition 3.
 Review and Conduct the Process & System audits with different
vendors in India to gather and analyse data, and report on actual
vendor quality of performance, worked with quality Engineers to
shortlist good vendors & bring them into certified list of supplier
and maintain the approved suppliers list.
 Visit regularly to explain to supplier & improve quality of
production by guiding them in drawing interpretation. Conducted
follow up on corrective action requested during supplier visit and
factory at all stages and finally highlighted the critical
improvement needs to management for taking necessary action.
 Preparation for Internal and External Audit during IPE Inspection
from TUV-Nord , TUV-Sud.
 to release Engineering documents like QAP, GRN , Transmittal
Note, NDA, NCR , Work Instruction, Protocols, Manuals , Training
plan & Performance Test results of Generator.

A00F006e Seite 2 von 5 Rev.02/03.11


 Interface between Tuv sud and supplier in technical evaluation &
Quality Audits at defined intervals to help complete QMS, Product
Certification & Component Certificate for our wind turbines critical
components. All supplier technical review for machinery
component like Gear drives for Yaw and Pitch system, Main
Bearing, Yaw and Pitch bearings, Brakes, Pump & also rotor
locking systems are closely discussed with supplier & selected
based on quality standards at lowest cost of product.

Management Activities:
 Project Management exposure for huge capital investment
projects handled successfully by me.
 Project cost estimation & cost reduction possibilities and
budgeting for future projects on case to case basis during R&D
progress was done.
 Database Management & MIS (Management information
system), Data management system implementation in SAP for
drawing, design documents, manuals etc.
 Work Strategy, Time Management & annual budgeting of projects
and Business development,
 Motivating Team members to extract best Job output with
minimum available resources.
 Good Technical& Commercial Due Diligence exposure due to
having lot of discussions with Investors & IPP customer & retail
turbine customers from India and Abroad. Meeting with due
diligence team and answering about our wind turbine technology
related queries.
 Conducting Regular interdepartmental meeting & Training and
development to keep team motivated.
 Selection of suitable team members & consultants to execute the
project & maintain the schedule of completion in planned date.
 Improved safety of Engineers in the design level for ensuring the
safety of people working at height’s at high winds.
 knowledge gained from German Doctorates & Engineers to work
in full 360 degree of Engineering activity of a project from scratch
level from concept of Design, Procurement, Production, Quality
inspection, Erection & commissioning & also Operation
maintenance of wind turbine of larger MW turbine and also
working exposure with accredited Design approval groups like
TUV sud , TUV Nord , DNVGL and Type testing organization like
wind test GmbH.
 Preparation of weekly, monthly & quarterly progress report to
management including any critical issues & to take technical
decisions and process for final commercial approval to senior
management.
 To expedite execution at Sites, vendor premises and utility
offices.
Technical verification of commercial invoices and other
documents and forward to finance for payment process with
recommendation.
 To analysis tenders (Domestic & International), Marketing
Queries, International Projects on techno commercial ground &
A00F006e Seite 3 von 5 Rev.02/03.11
study the feasibility of the project with given technical
requirements.
 To evacuation & preparation of pre-qualification documents
including Involvement in preparation of execution strategy,
defining scope of work & raising technical deviations &
clarifications etc.
 A realistic delivery commitment based on collective agreement
and development of internal/external pre & post order
communication & documentation. 
 Building end to end project tracking mechanism for deliverables,
adherence to contract terms, ensuring stage wise documentation
of project and building more transparent internal/external
communication.

Key Skills :
 3D modeling with Pro E , Design, Detail drawing , Bill of Material,
Technical Documents preparation , manual calculation and
optimization of mechanical systems with the help of FEM tools.
 Detailed knowledge of the mechanical aspects of wind turbines,
theoretical and practical experiences with both geared and
gearless wind turbines.
 Good Interpersonal, Business development and Managerial skill
for handling large team and good man management.
 Energetic Hard worker and willingness to learn.
 Already undergone Advanced German language training, full time
for three months, a Certified course in Max Mueller Bhavan,
Gothic institute Chennai , India.
 Undergone Bladed software training at UK for 1 week.

Date: March 1997 to June 2008


Company: Siemens Ltd - Flender (Winergy Drives) India & Germany
Position: Team Leader
Description: Key Responsibilities:

 Worked almost for 6 years in wind gear box unit design for 1MW,
1.5MW& 2.1MW model gearbox supplied to Suzlon and Vestas
wind turbines OEM companies.
 Handled a complete project in Wind and Industrial Gearbox in
during at Flender. Work Involved Layout Preparation, Shaft
calculation, Pinion & Gear calculations, selection of bearings,
bearing load & life calculations, Part Drawings, Assembly, Piping
plan & Installation drawings and complete part list preparations
for assembly, piping, installation Drawings in gearbox types.
 Housing drawing design and development for gearbox in both
Casting and Welded types for manufacturing in Flender AG
Germany.
 Selection of suitable size of fasteners, tolerance values, surface
finish etc. for manufacturing the gearbox sub components.
 Assembly drawing preparation with selection of bearings,

A00F006e Seite 4 von 5 Rev.02/03.11


fasteners, circlips etc for gearbox according to the part list. Piping
plan development with selection of geared electric motor pumps,
oil cooler, oil filter, and piping connection for lubrication inside
gearbox. Installation Drawings design & Development for gear
boxes acc. to the customer requirements i.e., position of oil
cooler, filter etc.
 Worked at Flender (Winergy) at back to back test bench for 2.1
MW
 Review of improvements in technology like planetary gear box
drives to increase more Torque in compact design.

Date: Aug 1995 to Feb 1997


Location:
Company: Square D Software Ltd
Position: CAD Engineer
Description: Key Responsibility:

 Production Team member for `BELL CANADA'


 Project for the Cambric Graphics Inc. U.S.A.
 Piping and cooling system layout in Auto Cad
 Job involves Drawing in AutoCAD
 Mechanical component drawing for MAC Tools, USA
 Job involves Drawing development using Auto CAD, Mechanical
 Designer

1. Others (e.g. Publications): NA

I hereby confirm that the above information is correct.

Chennai / 01/02/2019 Ravindran. R


_____________________ ____________________________________
Place / Date Applicant

A00F006e Seite 5 von 5 Rev.02/03.11

You might also like