Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Sadar Bazar Market Street

• 600 M long Stretch from Head post office


towards new railway road until the Masjid on
the old railway road

• The Street varies in width from 9 M to 13 M

• Around 450 shops on this street

Head
Post
Offic
e Govt.
Genera
l
Hospit
al

Kamla
• Land-use in the area is predominantly Commercial Nehru
Park
• Public semi- public is 2nd major activity
• Also includes a few Residential pockets Commercial Area
Public Semi-
Religious
Public
Open
Places
Space
300
Safer Access to Schools, Sadar Bazar Area
School Zone

Cluster of Schools – 04
Vedik High School
Schools
Govt Girls Sr.
Sec. School
Marumal Sr. No of Students in four
Sec. School
schools – 6000 approx.

Types of Schools
Govt – 02
Govt Boys Sr. Private - 01
Sec. School
Private with govt aid - 01

1) Vedik High School


2) Govt Girls Sr. Sec. School
3) Marumal Sr. Sec. School
4) Govt. Boys Sr. Sec. School
Going on project
School Locations Entrance to Schools Routes accessible to Schools (Pedestrianisation of Sadar Bazar)
Walking Audit (18th Dec 2020)

Gurugram Selected Sadar Bazaar Market


Street and a School Zone in the
Neighbourhood as sites for the Streets For
People Challenge

Walking Audit carried out with all the


registered participants of the Design
Competition in presence of experts and
stakeholders

•Participants were engaged with


over official channels like:
Mail
Messaging
Invites over Phone call

•Queries were attended to on a


one-to-one basis
Walking Audit

Participants presented a gist of the site, its


context, existing studies and requirements

Walking Audit carried out with resources shared:


•Observation Checklist
•Base Map
• Route Map

Participants then followed that with


a peer discussion on issues and
challenges observed

A very fruitful discussion was held


with the stakeholders from the site
as well as City Officials
5th Dec 15thth Dec 18th Dec 8th Jan 29th Jan
2020 2020 2020 2021 2021
Evaluation Process

•Jury members were shared the sheets from •Criteria for Evaluation Sheet
entries, evaluation beforehand
Originality of Idea (10%)
• Jury and Presentation by the shortlisted entry Inclusivity of All Users (20%)
was held in the presence of: Ease of Implementation (30%)
City Officials Design Detail (40%)
Experts
Stakeholders
Raahgiri Day

Raahgiri Day was organized to announce the


winners of the competition
• An exhibition showcasing work of all the
shortlisted teams
• Winners were awarded by Honorable Mayor
alaso resident of the area
• A vision for Sadar Bazar and Gurugram’s
pedestrian friendly streets was presented
Steps for Pilot Testing

•A site visit was made to discuss the trial possibilities


by following members:
City Officers Technical Officials
Experts Design Competition Winners
Traffic Police
•Site Conditions were discussed and ideas on the trial
shared for different roles among partners

•Meeting with Market Association, School Teachers,


and other site representatives is in the pipeline
regarding:

Introducing trial components Design ideas


Traffic Management Timelines for the trial

You might also like