Project Name Date: Iit B Hostel 18 Building, Mumbai
Project Name Date: Iit B Hostel 18 Building, Mumbai
Date : 24/04/2015
BEAM 1B97 : STADD NO 3213
INPUT DATA
WIDTH B = 250 MM
DEPTH D = 600 MM
COVER = 50 MM
DESIGEN SHEAR Vu = 32 T
LOADING DIG
BM STEEL DESIGN
M/(bd^2) = 1.06
PROVIDE DIA 25 NO 6
OR
TRY 8 NO OF LEG 2
SPACING = 74.28374 MM
DIG
UILDING, MUMBAI
REV : R0
Pt % = 0.25
490.625 MM^2
113.04 MM^2
BETA = (0.8 XFck)/(6.89 X Pt)
= 16.10042 1
= 16.10042
50.24 MM^2
) X (ROOT(1+5BETA)-1))/(6BETA)
SPAN DIG LOADING DIG
19 T 5T 4T 5T 10 T/M
2 T/M
4.5 M 7.5 M 4.5 M 6M
22.5 M 24 M 9M
LOADING DIG
INPUT DATA
DEPTH D = 750 MM
COVER = 80 MM
DESIGEN SHEAR Vu = 42 T
LOADING DIG
BM STEEL DESIGN
M/(bd^2) = 0.86
PROVIDE DIA 28 NO 8
TRY 12 NO OF LEG 2
SPACING = 192.9453 MM
DIG
CONDITION I CONDITION II
= 266.32125 T-M
Xu max = 321.6
(0.87 Fy Ast) / ( 0.36 X Fck X Bf)
Xu = 73.22158
Mur1 = 266.3213
Pt % = 0.21
615.44 MM^2
BETA = (0.8 XFck)/(6.89 X Pt)
= 14.12467 1
= 14.12467
113.04 MM^2
CONDITION II
14.12467
) X (ROOT(1+5BETA)-1))/(6BETA)
SLAB INT = 1 T/M^2
Ly = 5.95
Lx = 3.3
B = 1.80
Pu = 390 TON Pu
Mu = 180 T-M Mu
DIA = 1000 B AND D
Fck = 30 MPA Fck
CG = AY / A = 4 CM From Top
4 CM From Bottom
WT 7.85 KG/M2
rxx 29.75 CM
Ztop 29.503 CM3
Zbottom 29.503 CM3
Weight of Foam 2.4 KG/M^2
= 160 Ton
= 50 T-M
= 600 600
= 15 MPA
Mu/FckD^3 = 0.15
Pu/FckD^2 = 0.30
Vadalkar & Associates
Conc. M30
Steel 415
cover 25 mm
Base slab
Moment, M = 1.50 Tm
= 212
Reinforcement details :
Ast req. = Bending moment/(0.9 x per. Stress x eff. depth)
= 570 mm2
IS 456:1964