Professional Documents
Culture Documents
Group C MIDTERM ACTIVITY 1 Case Study Electroplus Incorporated
Group C MIDTERM ACTIVITY 1 Case Study Electroplus Incorporated
Group C MIDTERM ACTIVITY 1 Case Study Electroplus Incorporated
KM30 Old National Highway, Barangay Nueva, San Pedro 4023, Laguna
Case Study:
Electroplus Incorporated
Prepared by:
BEDOYA, Librado III
BERDAN, Angelica
BERTULFO, Shielo Celeste
CABANGON, Lara Mae
DE GANA, Mariden Ann Gabrielle
DELA CRUZ, Shaina
MATIAS, Lorebel Jane
MERCADO, Nathaniel Ian
NESOLA, Sunshine
RIOVEROS, Joyzelle
SANCHEZ, Ramon
TANYAG, Kenneth
Submitted to:
Mr. Recto Luces
November 9, 2020
CASE STUDY: Electroplus Incorporated
low projected earnings for the past months—until the motor company received a project
that might possibly help them bounce back with their loss. To achieve desired year-end
sales, the plant head and plant performer quickly agreed to include January order and
quality checks that may cause serious problems down the line. Because of lack of time,
manpower, and equipment failures, the company is only able to inspect 80% of the
orders.
II. OBJECTIVE
The main objective of this analysis is to determine and propose solutions in order
to attain the company's sales goal to bounce back with the efficiency of the resources
and 100% quality control effective before the end of the year while avoiding the issue of
violation of contract which includes 100% inspection and shipping out of items before
SWOT ANALYSIS
Strengths Weaknesses
Materials – The company’s materials Machinery – Unexpected breakdown
are complete and available, enough to of the machines used for
produce the amount of orders needed manufacturing items.
by the client. Man – Employees may become
Man – The company has enough man overworked due to the amount of
power to work on the process of the tasks they have to do to process the
given project and they also had orders, including having to work
increase in their salaries. overtime
Increase in sales – Bringing back the Method – No manual production is
loss of the company for the past possible in case of machine
month that could thus reach the breakdown.
desired year-end sales.
Opportunities Threats
Regaining lost sales and customer Loss of client in case of failure in
trust with repetitive orders maintaining quality standards
Improving competitiveness – since Arising of legal case due to
they finally have a chance they are violation in contract
now able to get more earnings and Negative feedbacks and poor
work and run as usual customer satisfaction
A. Include the top management and people within the company in planning and
decision making, to allow them to become more knowledgeable about the current
situation in the company and to analyze and propose better plans and solutions
for future issues and scenarios. The top management is the most crucial part of
an organization, and their involvement in decision making and planning is
B. Inspecting beforehand and during production each part and section of the
enable the plant performer to closely monitor the 4 M's of the process and more
C. Rent additional machines for special use cases. This can speed up production
and gives the plant the ability to produce more goods than what is normally
planned. It can also avoid issues down the line in case one of the machines
D. Hire additional seasonal employees inclined with the job to process and perform
can be done if the company's budget allows in order to reach desired order quota
1-year free service and maintenance for minor parts. For major machine defects
Electroplus Incorporated will repair or replace the unit provided that Hammond
V. CONCLUSION
Based on the case, the problem that the company encountered in the process of
product manufacturing that caused the company to violate the contract, and considering
the areas of concern and proposed alternative courses of action, it can therefore be
concluded that the project, and thus the company's biggest challenge in this case is to
ensure 100% inspection and compliance with the client's needs. Thus, this analysis
enables the company to overcome this by providing alternative courses of action that
VI. RECOMMENDATION
Based on the analysis of findings, out of all possible alternative courses of action,
1. Separate inspection for the products will take extra time so it will be beneficial for
the company to inspect and monitor each step of the production while it is still
processing. Providing daily production monitoring sheets will give the plant
performer better access to know and monitor if the production is going smoothly
2. The company must prepare additional equipment for use in larger orders and
only because it is cost-efficient, but also because it can be used only when
3. Include machine warranty in the contract and discuss thoroughly with the client
regarding coverage and benefits that will ensure safety and less cost for the
company.