Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

COMMENT RESOLUTION SHEET

Doc.
Date: XXX
Transmittal No.

Document Title Status Code X Prepared by

Document No. Revision No. 1.Revise and Resubmit 3. Approved Checked By

Date 23-Dec-20 2. Approved with comments 4. For Info. only X Approved By

Reference COMPANY Response Coordinator:


Sl. No. Vednor Response CONTRACTOR Resolution COMPANY Resolution
Page No. Clause No. COMPANY Comments

Align this scope section equipment details inline with the Mechanical design Scope Section Equipment details are inlined with the Mechanical design Basis
1 7 2.3
Basis P03423-03-99-31-1602-1 (Latest) P03423-03-99-31-1602- Rev.B.

Maintain "Model Review Tag Register" with Review comment snap shot and Noted and updated the clause, also we have provided model tag closeout format
2 12 8.2
Review close out snap shot for each comment tag in Appendix B

60% model review shall start after all tags of 30% model review are closed. Any
3 12 9.2 unresolved tag are carried over, same shall be closed in priority along with 60% Noted and updated the clause
model review tags

Add PDS content for Equipment - Chemical Injection Skids (Corrosion Inhibitor,
4 14 10.2 Noted and updated the clause
Biocide)

5 14 10.2 Add PDS Content for Equipment - Static Mixer, Spare SPM Calm Buoy Static mixer added in clause, SPM Calm is not included in this project

Primary Escape Routes shown in trnasperent enevlop showing clear straight


6 15 10.8 Noted and updated the clause
escape route

7 16 11.2 Support shall be physical Model Noted and updated the clause

Name:
Name: Name:
Name:
Date : Date :
Date : Date :

Page 1 of 1

You might also like