DETAILED MEASUREMENT SHEET

Sl.
Description of Work UOM Nos L B D Qty Total Qty Remarks
No
1 Excavation Upto NGL

F1 Cum 1 7 1.80 1.80 2.10 47.63

This Bill Qty Cum 47.63


2 Backfilling - Inside PinthBeam

Cum 1 1 4.567 3.650 0.150 2.50


Cum 1 1 5.000 6.800 0.150 5.10

This Bill Qty Cum 7.60


3 Soling Works - 200mm tk

Sqm 1 1 4.567 3.650 16.67


Sqm 1 1 5.000 6.800 34.00

This Bill Qty Sqm 50.67


4 ATT - Works

Plinth Area Sqm 1 1 9.340 5.027 46.95 0.23+3.65+0.23+5+0.23


Sqm 1 1 5.460 2.224 12.14 0.23+5+0.23

This Bill Qty Sqm 59.09


P.C.C
5 Footing PCC 1:4:8

F1 Cum 1 7 1.50 1.50 0.10 1.58

This Bill Qty Cum 1.58


6 PCC - Plinth Beam

Main Beam
(A/1 - A/2) & (B/1 - B/2) Cum 1 2 4.127 0.380 0.100 0.31 4.567+0.23+0.23-0.45-0.45
(C/1a - C/2) Cum 1 1 6.360 0.380 0.100 0.24 6.8+0.23+0.23-0.45-0.45
(B/1 - B/1a) Cum 1 1 1.775 0.380 0.100 0.07 2.115-0.115-0.225
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Cum 1 2 3.650 0.380 1.000 2.77
(B/2 - C/2) & (B/1a - C/1a) Cum 1 2 5.000 0.380 1.000 3.80

This Bill Qty Cum 7.19


6 PCC - Floor

Cum 1 1 4.567 3.650 0.100 1.67


Cum 1 1 5.000 6.800 0.100 3.40

This Bill Qty Cum 5.07


Total Qty Cum 13.84
R.C.C
7 RCC - Footing Concrete

F1 Cum 1 7 1.20 1.20 0.45 4.54

This Bill Qty Cum 4.54


8 RCC - Columns upto Plinth
C1 Cum 1 7 0.230 0.450 1.550 1.12

This Bill Qty Cum 1.12


9 RCC - Plinth Beam

Main Beam
(A/1 - A/2) & (B/1 - B/2) Cum 1 2 4.127 0.230 0.450 0.85
(C/1a - C/2) Cum 1 1 6.360 0.230 0.450 0.66
(B/1 - B/1a) Cum 1 1 1.775 0.230 0.450 0.18
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Cum 1 2 3.650 0.230 0.450 0.76
(B/2 - C/2) & (B/1a - C/1a) Cum 1 2 5.000 0.230 0.450 1.04

This Bill Qty Cum 3.49

1/4
Sl.
Description of Work UOM Nos L B D Qty Total Qty Remarks
No
10 RCC - Columns upto Roof Beam
C1 Cum 1 7 0.230 0.450 3.200 2.32

This Bill Qty Cum 2.32


11 RCC - Roof Beam

Main Beam
(A/1 - A/2) & (B/1 - B/2) Cum 1 2 4.127 0.230 0.450 0.85
(C/1a - C/2) Cum 1 1 6.360 0.230 0.450 0.66
(B/1 - B/1a) Cum 1 1 1.775 0.230 0.450 0.18
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Cum 1 2 3.650 0.230 0.450 0.76
(B/2 - C/2) & (B/1a - C/1a) Cum 1 2 5.000 0.230 0.450 1.04

This Bill Qty Cum 3.49


12 RCC - Roof Slab
Cum 1 1 3.650 4.567 0.125 2.08
Cum 1 1 5.000 6.800 0.125 4.25

This Bill Qty Cum 6.33


13 RCC - Columns above Roof
C1 Cum 1 7 0.230 0.450 0.600 0.43

This Bill Qty Cum 0.43


14 RCC - Chajja & Lintel
Chajja - Window - W Cum 1 2 1.500 0.450 0.113 0.15
Chajja - Window - W1 Cum 1 2 1.900 0.450 0.113 0.19
Chajja - Window - W2 Cum 1 1 1.700 0.450 0.113 0.09
Main Beam
(A/1 - B/2) Cum 1 1 4.127 0.230 0.125 0.12 0.23+4.567+0.23-0.45-0.45
(C/1a - C/2) Cum 1 1 6.360 0.230 0.125 0.18 0.23+6.8+0.23-0.45-0.45
(B/2 - B/1a) Cum 1 1 5.910 0.230 0.125 0.17 6.8+0.23+0.23-0.45-0.45-0.45
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Cum 1 2 3.650 0.230 0.125 0.21
(B/2 - C/2) & (B/1a - C/1a) Cum 1 2 5.000 0.230 0.125 0.29

This Bill Qty Cum 1.40


SHUTTERING
15 Shuttering - Footing

F1 Sqm 1 7 4.80 0.45 15.12

This Bill Qty Sqm 15.12


16 Shuttering - Columns upto Plinth
C1 Sqm 1 7 1.360 1.550 14.76

This Bill Qty Sqm 14.76


17 Shuttering - Plinth Beam

Main Beam
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.127 0.900 7.43
(C/1a - C/2) Sqm 1 1 6.360 0.900 5.72
(B/1 - B/1a) Sqm 1 1 1.775 0.900 1.60
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 0.900 6.57
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 0.900 9.00

This Bill Qty Sqm 30.32


18 Shuttering - Columns upto Roof Beam
C1 Sqm 1 7 1.360 3.075 29.27

This Bill Qty Sqm 29.27


19 Shuttering - Roof Beam

Main Beam
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.127 1.130 9.33
(C/1a - C/2) Sqm 1 1 6.360 1.130 7.19
(B/1 - B/1a) Sqm 1 1 1.775 1.130 2.01
Cross Beam
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 1.130 8.25
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 1.130 11.30

2/4
Sl.
Description of Work UOM Nos L B D Qty Total Qty Remarks
No
This Bill Qty Sqm 38.08
20 Shuttering - Roof Slab
Sqm 1 1 3.650 4.567 16.67
Sqm 1 1 5.000 6.800 34.00

This Bill Qty Sqm 50.67


21 Shuttering - Columns above Roof
C1 Sqm 1 7 1.360 0.600 5.71

This Bill Qty Sqm 5.71


22 Shuttering - Chajja & Lintel
Chajja - Window - W Sqm 1 2 1.500 0.450 1.35
Chajja - Window - W1 Sqm 1 2 1.900 0.450 1.71
Chajja - Window - W2 Sqm 1 1 1.700 0.450 0.77

This Bill Qty Sqm 3.83


FINISHING WORKS
23 200MM - Blockwork

Main Wall
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.127 2.750 22.70
(C/1a - C/2) Sqm 1 1 6.360 2.750 17.49
(B/1 - B/1a) Sqm 1 1 1.775 2.750 4.88
Cross Wall
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 2.750 20.08
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 2.750 27.50
Parapet Wall

0.23+3.65+0.23+5+0.23+6.8+0.23+
Sqm 1 1 32.277 0.600 19.37
5+0.23+2+0.23+3.65+0.23+4.567
Deductions
Door - D Sqm -1 2 1.100 2.100 -4.62
Window - W Sqm -1 2 1.200 1.200 -2.88
Window - W1 Sqm -1 2 1.600 1.200 -3.84
Window - W2 Sqm -1 1 1.400 1.200 -1.68

This Bill Qty Sqm 99.00


24 Internal - Plastering

Main Wall
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.567 2.750 25.12
(C/1a - C/2) & (B21 - B/1a) Sqm 1 2 6.800 2.750 37.40
Cross Wall
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 2.750 20.08
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 2.750 27.50

Deductions
Door - D Sqm -0.5 2 1.100 2.100 -2.31
Area of the opening is 0.5
Window - W Sqm -0.5 2 1.200 1.200 -1.44 Sqm = No Deduction, 0.5 to 3
Sqm = Half deduction, Above 3
Window - W1 Sqm -0.5 2 1.600 1.200 -1.92 Sqm = Full deduction with Jam
Quantity
Window - W2 Sqm -0.5 1 1.400 1.200 -0.84

This Bill Qty Sqm 103.59


25 External - Plastering

Main Wall
(A/2 - C/2) Sqm 1 1 9.340 4.250 39.70
(A/2 - C/1a) Sqm 1 1 7.260 4.250 30.86
(B/1a - C/1a) Sqm 1 1 5.246 4.250 22.30
(B/1a - B/1) Sqm 1 1 2.230 4.250 9.48
(A/1 - B/1) Sqm 1 1 3.880 4.250 16.49
(A/1 - A/2) Sqm 1 1 5.027 4.250 21.36
Deductions
Door - D Sqm -0.5 2 1.100 2.100 -2.31
Area of the opening is 0.5
Window - W Sqm -0.5 2 1.200 1.200 -1.44 Sqm = No Deduction, 0.5 to 3
Sqm = Half deduction, Above 3
Sqm = Full deduction with Jam
Quantity

3/4
Sl. Area of the opening is 0.5
Description of Work UOM Nos L B D Qty Total Qty Remarks
Sqm = No Deduction, 0.5 to 3
No
Sqm = Half deduction, Above 3
Window - W1 Sqm -0.5 2 1.600 1.200 -1.92 Sqm = Full deduction with Jam
Quantity
Window - W2 Sqm -0.5 1 1.400 1.200 -0.84

This Bill Qty Sqm 133.68


26 Chajja - Plastering

Chajja - Window - W Sqm 1 2 1.500 0.550 1.65


Chajja - Window - W1 Sqm 1 2 1.900 0.550 2.09
Chajja - Window - W2 Sqm 1 1 1.700 0.550 0.94

This Bill Qty Sqm 4.68


27 Internal - Painting (Emulsion)

Main Wall
(A/1 - A/2) & (B/1 - B/2) Sqm 1 2 4.567 2.750 25.12
(C/1a - C/2) & (B21 - B/1a) Sqm 1 2 6.800 2.750 37.40
Cross Wall
(A/1 - B/1) & (A/2 - B/2) Sqm 1 2 3.650 2.750 20.08
(B/2 - C/2) & (B/1a - C/1a) Sqm 1 2 5.000 2.750 27.50

Deductions
Door - D Sqm -0.5 2 1.100 2.100 -2.31
Window - W Sqm -0.5 2 1.200 1.200 -1.44
Window - W1 Sqm -0.5 2 1.600 1.200 -1.92
Window - W2 Sqm -0.5 1 1.400 1.200 -0.84

This Bill Qty Sqm 103.59


28 External - Painting (Apex)

Main Wall
(A/2 - C/2) Sqm 1 1 9.340 4.250 39.70
(A/2 - C/1a) Sqm 1 1 7.260 4.250 30.86 6.8+0.23+0.23
(B/1a - C/1a) Sqm 1 1 5.246 4.250 22.30 0.23+5+0.23
(B/1a - B/1) Sqm 1 1 2.230 4.250 9.48 2+0.23
(A/1 - B/1) Sqm 1 1 3.880 4.250 16.49 3.65+0.23
(A/1 - A/2) Sqm 1 1 5.027 4.250 21.36 4.567+0.23+0.23
Deductions
Door - D Sqm -0.5 2 1.100 2.100 -2.31
Window - W Sqm -0.5 2 1.200 1.200 -1.44
Window - W1 Sqm -0.5 2 1.600 1.200 -1.92
Window - W2 Sqm -0.5 1 1.400 1.200 -0.84

This Bill Qty Sqm 133.68


29 GRANITE FLOORING

Sqm 1 1 4.567 3.650 16.67


Sqm 1 1 5.000 6.800 34.00

This Bill Qty Sqm 50.67