Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

PT CLISTE REKAYASA INDONESIA

RELIABILITY THROUGH TIME

COMPANY
PROFILE
Safety
Reliability
Availability
Maintainability
Process Design
Risk Based Management
Asset Integrity Management
Software Development

Gandaria 8 Office Tower 8th Floor


Jl Sultan Iskandar Muda, Jakarta Selatan 12240
+62 21 29851728
office@cliste.co.id
www.cliste.co.id
PT Cliste Rekayasa Indonesia © 2021
ABOUT US
PT CRI provides Reliability based asset life
cycle management through the conception,
design, construction, commissioning,
operation and decommissioning phase.

Aiming a world class consultant support


company, CRI provides Consultancy
Services, Training, Software Renting,
Software Development as well as Man
Power Support which well concern in
S a f e t y, R e l i a b i l i t y, A v a i l a b i l i t y,
Maintainability and Asset Integrity with
goal of Maintenance & Reliability
Excellence (MREX).

These main concerns of CRI will deliver


you the best of us!

Software
Training &
Rent & EPC & Consultancy
Labor Supply
Development

PT Cliste Rekayasa Indonesia © 2021


VISION
To become an
internationally recognized firm
which provides effective solutions
and contributes to Safety &
Reliability engineering development

MISSION
Deliver the highest quality
of consultancy services,
products and training
to bring your business to
Maintenance & Reliability Excellence (MREX)

PT Cliste Rekayasa Indonesia © 2021


Safety
Reliability
Availability
Maintainability
Process Design
Risk Based Management
Asset Integrity Management
Software Development

TIME TO OPTIMIZE
YOUR ASSET MANAGEMENT
WITH CRI

PT Cliste Rekayasa Indonesia © 2021


CRI Capabilities

Engineering Operation

Basic Engineering Asset Integrity Management (AIM)

Front End Engineering Design Operation Readiness Strategy


(FEED) Assurance (ORSA)

Detail Engineering Corrosion Management Plan (CMP)

Inspection Process Safety Management (PSM)

Asset Register Reliability Centered Maintenance


(RCM)
Bill of Material (BOM)
Safety Critical Element (SCE)
Material Cataloguing
Equipment Criticality Analysis
Reliability Availability Maintainability (ECA) Quantitatively / Qualitatively
(RAM)
Pre Activity Safety Review (PASR)
Risk Based Inspection (RBI)

PT Cliste Rekayasa Indonesia © 2021


SAFETY

Either regulated in requirement


or as your entity’s necessity,
Safety Target shall fully be
acknowledged by your organization.

Safety Target implementation


comprises far beyond Health Safety
Environment (HSE), it deals with
System Assurance,
Safety Management,
Quality Assurance,
Safety Integrity Level,
Compliance Management,
System Policy, System Safety Plan,
Hazard Analysis, Safety Case.

A crystal clear Safety Target


benefits your system
a zero production fatality.

CRI Services

PT Cliste Rekayasa Indonesia © 2021


AVAILABILITY

Compromises to Reliability
will put Availability as part of your
system performance indicator.

Availability works deals with


Reliability Block Diagram (RBD),
Remaining Life Assessment,
Fault Tree Analysis,
MTBF, MTTF, Throughput Analysis.

Certainty on Availability give


you quantitative point of view
of what and how to improve
your plant and system.

CRI Services

PT Cliste Rekayasa Indonesia © 2021


RELIABILITY

Confidence on Reliability of
your system assure you the
maximum performance you
could achieve.

Reliability provides optimization


strategy to maintenance and
operational through RAM
Analysis, FMECA, RCM,
Reliability Growth Analysis,
Life Cycle Analysis,
Integrated Logistic Support.

Reliability support you most


efficient and most applicable
maintenance and operational
strategy.

CRI Services

PT Cliste Rekayasa Indonesia © 2021


MAINTAINABILITY

System design optimization will


significance your maintenance
term to level of real-time
online monitoring system.

A comprehensive Reliability,
Availability and Maintainability
based work integration
will carry you a full experience
of Maintenance and Reliability
Excellence (MREX).

CRI Services

PT Cliste Rekayasa Indonesia © 2021


ASSET INTEGRITY
MANAGEMENT

Risk based asset integrity


is a vital component to your
asset management system.

Inclusive Maintenance & Reliability


Excellence (MREX) should cover
all strategies for all kind of assets.

Quantitative Risk Assessment (QRA),


Risk Based Inspection (RBI),
Root Cause Failure Analysis (RCFA),
Corrosion Management Plant (CMP),
etc. are substantial to be acquired.

CRI Services

PT Cliste Rekayasa Indonesia © 2021


SOFTWARE
DEVELOPMENT

Industrial 4.0 has become such


a great opportunity for you to
build IoT work environment on
your system.

CRI is more than your assistant


to bring the future in your hand.
CRI is capable to help you build
either online monitoring,
web based application,
hand held based application,
emulator software, or PLC
SCADA logic customization.
We are future industrial maker.

CRI Services

PT Cliste Rekayasa Indonesia © 2021


CRI Valuable
Clients & Partners

PT PERTAMINA PT STAR ENERGY


Pertamina is Indonesia GEOTHERMAL (WAYANG WINDU)
State Owned Enterprise Star Energy Geothermal
that responsible to national Wayang Windu is the largest
oil & gas supply. geothermal power station in Indonesia.
CRI provides services for starenergy CRI provides services & training for
Reliability & customized software Root Cause Failure Analysis &
development since 2014 customized software
development in 2015.

PT PETRONAS PT SPIE OIL & GAS


CARIGALI INDONESIA SERVICES INDONESIA
Petronas is a leading SPIE is a multinational company
multinational oil and gas that offers a large range of
ranked amongst the largest products and services to upstream
corporation in the world. oil & gas operators.
CRI provides services for CRI partnered to provides services
Reliability, Risk Based Management, & training for Reliability, Risk Based
Asset Integrity Management, Man Management & Asset Integrity
Power & customized software Management, and customized
development since 2017. software development since 2019.

PT ADHI KARYA
RELIASOFT
Adhi Karya is Indonesia
State Owned Enterprise
that responsible to infrastructure.
OUR VALUABLE ReliaSoft software from
HBM Prenscia empowers
ReliaSoft
CRI provides services for
Safety, Reliability Availability
Maintainability, Man Power,
CLIENTS & PARTNERS Reliability, Quality and Maintainability
engineers to transform data into decisions.
CRI partnered to provides services using
and Integrated Logistic Support in Reliasoft well credible products since 2017.
railway application since 2017.

PT MEINDO ELANG INDAH


PT MEDCO MEI is one of leading EPCI
contractors in Indonesia, providing
ENERGI INTERNATIONAL fully integrated solutions for
MedcoEnergi is a publicly listed Petrochemical, Energy, and
Indonesian oil and gas company. upstream Oil & Gas Industry.
CRI provides services for CRI partnered to provides services
Reliability Centered & training for Safety, Reliability &
Maintenance in 2016. Asset Integrity Management, and
customized software development
since 2019.

PT CONOCOPHILLIPS PT LAPI ITB


Supported by Bandung Institute of Technology,
INDONESIA PT LAPI ITB is an affiliation body aimed to bridging
ConocoPhillips is an American researches and industries in Indonesia.
multinational energy corporation. CRI partnered to provides services & training
CRI provides Man Power for Reliability for Safety, Reliability & Asset Integrity Management,
Centered Maintenance in 2014. and customized software development since 2014.

PT Cliste Rekayasa Indonesia © 2021


OUR EXPERTS

Ever since CRI is established, our experts has contribute a lot in the
development and improvement of Safety, Reliability, Availability,
Maintainability, Asset Integrity Management, Risk Based Management,
and customized software.

Chandra Salim
Ir., IPM, AER, M.Sc.,
CMRP, RCM Facilitator Lv. 2

PERSATUAN
INSINYUR
INDONESIA

PII

ANSI

Maintenance & Reliability Professional with more than 10 years of vast


exposure in project development, commissioning, operation &
maintenance, and decommissioning in Oil & Gas, Energy as well as
Mass Transport (LRT) industries. Specialized in Reliability Availability
Maintainability (RAM), Failure Mode, Effect & Criticality Analysis
(FMECA), Root Cause Failure Analysis (RCFA), Reliability Centered
Maintenance (RCM), Integrated Logistic Support (ILS), Safety Analysis,
Improving visibility of Maintenance & Reliability Data, Overall
Equipment / Machinery Healthiness program, Maintenance Strategy
and Asset Management.

PT Cliste Rekayasa Indonesia © 2021


Suprayoga Didik Pramuji
CFSP
Maintenance, Reliability & Procurement Certified Functional Safety Professional,
expert over more than 25 years Well experienced in Instrument, Maintenance
exposure in many industries such & Safety Process for more than 10 years
as Aviation, Oil & Gas, Petrochemical, in Oil & Gas and mass transport.
and Mass Transport.

Erni D Sumaryatie Fari Aditya Gatam


M.Sc M.Sc., CMRP
Statistics & Reliability Expert for more Certified Maintenance & Reliability Professional,
than 20 years exposure in many industries Safety & Reliability Expert for more than
such as Aviation, Oil & Gas, Petrochemical, 10 years exposure in Oil & Gas and
and Mass Transport. Petrochemical.

R Nursiwan Dominica Gabriella


High Voltage Electrical Expert over A talented Process Engineer with professional
more than 20 years exposure in many experience through many years in Oil & Gas
industries such as Aviation, Oil & Gas, process simulation, compressor evaluation,
Petrochemical, and Mass Transport. blowdown study, flare evaluation, HAZOP
Review.

PT Cliste Rekayasa Indonesia © 2021


OUR EXPERIENCES

Provision of Reliability & Asset Integrity, Corrosion Management Plan,


Operations Readiness Strategic Assurance, Process Safety Management.

Main Contractor : PT Meindo Elang Indah


End User : Petronas Carigali Ketapang II Ltd.

Provision for Services of Equipment Criticality Analysis (ECA), Inspection


Testing & Preventive Maintenance (ITPM) and Safety Critical Element (SCE)
for Bukit Tua ORF
Main Contractor : PT Meindo Elang Indah
End User : Petronas Carigali Ketapang II Ltd.

Reliability Availability Maintainability (RAM) Study for Power Supply


System of LRT Jabodebek Phase 1
Main Contractor : PT Adhi Karya EPC
End User : Ministry of Transportation of Indonesia

Quantitative Reliability Assessment (QRA) with Detail Reliability Centered


Maintenance (RCM) Aiming Extension of Maintenance Frequency of
Kepodang’s Compressor & Turbine
Main Contractor : PT Singgar Mulia
End User : Petronas Carigali Ketapang II Ltd.

Instrument Protective Function Management & Alarm Rationalization


for Bukit Tua & Kepodang
Main Contractor : PT Singgar Mulia
End User : Petronas Carigali Ketapang II Ltd.

Pipeline Uncertainty & Reliability Analysis


Main Contractor : PT Istana Karang Laut
End User : Petronas Carigali Ketapang II Ltd.

PT Cliste Rekayasa Indonesia © 2021


OUR EXPERIENCES

Provision of Asset Integrity & Plant Reliability Integrated Services


Main Contractor : PT SPIE Oil & Gas Services Indonesia
End User : Petronas Carigali Ketapang II Ltd.

Pekerjaan Pengembangan dan Penambahan Modul Untuk Equipment dan


Plant Reliability Monitoring Management System Kilang RU-VI Balongan
Main Contractor : PT LAPI ITB
End User : Pertamina RU VI Balongan

Jasa Streamlined Reliability Centered Maintenance (SRCM) Balikpapan 1


Main Contractor : PT LAPI ITB
End User : Pertamina RU V Balikpapan

Saety Study for Power Supply System of LRT Jabodebek Phase 1

Main Contractor : PT Adhi Karya (EPC)


End User : Ministry of Transportation of Indonesia

Integrated Logistic Support (Spare Part Management) for Power Supply


System of LRT Jabodebek Phase 1
Main Contractor : PT Adhi Karya (EPC)
End User : Ministry of Transportation of Indonesia

Bukit Tua ORF DCS Cyber Security Assessment for PETRONAS Carigali
Ketapang II Ltd.
Main Contractor : PT Istana Karang Laut
End User : Petronas Carigali Ketapang II Ltd.

Process Safety & Asset Integrity (PSAI) & Safety Environment Critical
Element (SECE) FARSI Implementation
Main Contractor : PT Daun Biru Engineering
End User : Premier Oil Indonesia

PT Cliste Rekayasa Indonesia © 2021


OUR EXPERIENCES

Technical Services Assistance for Reliability Engineer


Main Contractor : PT Singgar Mulia
End User : Petronas Carigali Ketapang II Ltd.

Reliability Performance Monitoring (RPM) System Development


Main Contractor : PT SKF
End User : Petronas Carigali Ketapang II Ltd.

Jasa Pembuatan Database Historical Critical Peralatan Kilang


Main Contractor : PT LAPI ITB
End User : Pertamina (Persero)

Root Cause Analysis (RCA) Training


Main Contractor : PT Rekadia Solusi Teknologi
End User : Star Energy (Geothermal) Wayang Windu

Jasa Pembuatan Dashboard Real Time Display Coresight


Main Contractor : PT Singgar Mulia
End User : Petronas Carigali Ketapang II Ltd.

Work Inspection List - Mobile Application Development


Main Contractor : PT SPIE Oil & Gas Services
End User : Chevron Corporation

Baseline Inspection
Main Contractor : PT SPIE Oil & Gas Services Indonesia
End User : Hyundai Heavy Industries Co., Ltd (FPU Jangkrik)

PT Cliste Rekayasa Indonesia © 2021


PT CLISTE REKAYASA INDONESIA
RELIABILITY THROUGH TIME

Our Dedication is What


YOU CAN TRUST
Akta No. : -11.- February 13th 2014 ; -07.- April 4th 2020
SIUP No. : 10432 - 03 / PM / 1.824.271
NIB No. : 9120000563418

PT Cliste Rekayasa Indonesia © 2021

You might also like