This supplier PPAP status report provides information on the initial submission for a part from supplier UJET, including the part name and number, submission level, and reason for submission. It lists 18 required items for the PPAP, noting whether each item was accepted or its current status, with some additional comments. Site managers from quality, engineering, logistics, and manufacturing must approve or reject the interim PPAP submission by a given due date.
This supplier PPAP status report provides information on the initial submission for a part from supplier UJET, including the part name and number, submission level, and reason for submission. It lists 18 required items for the PPAP, noting whether each item was accepted or its current status, with some additional comments. Site managers from quality, engineering, logistics, and manufacturing must approve or reject the interim PPAP submission by a given due date.
This supplier PPAP status report provides information on the initial submission for a part from supplier UJET, including the part name and number, submission level, and reason for submission. It lists 18 required items for the PPAP, noting whether each item was accepted or its current status, with some additional comments. Site managers from quality, engineering, logistics, and manufacturing must approve or reject the interim PPAP submission by a given due date.
This supplier PPAP status report provides information on the initial submission for a part from supplier UJET, including the part name and number, submission level, and reason for submission. It lists 18 required items for the PPAP, noting whether each item was accepted or its current status, with some additional comments. Site managers from quality, engineering, logistics, and manufacturing must approve or reject the interim PPAP submission by a given due date.
PART NAME Weight PART NUMBER Part revision level PPAP Submission Level 3 Project Reason for submission Initial submission
Required Accepted Due date
# Item items Comment (dd.mm.yy) Yes No Ballooned UJET drawing 1 Design records ✘ 2 Design FMEA 3 Process Flow Chart ✘ 4 Process FMEA 5 Dimensional results ✘ If applicable 6 Material test results ✘ For all CPSC’s – capability. 7 Initial process studies ✘ For measurement equipment related to CPSC’s 8 MSA studies ✘ External laboratory 9 accreditation certificate Proactive Containment 10 Plan 11 Production Control Plan ✘ 12 PSW ✘ 13 Master sample ✘ Pictures of checking aids. 14 Checking aids ✘ 15 IMDS approval sheet 16 Packaging specification ✘ Picture of vendor tool 17 identification tag 18 Validation report Comments: SQ Manager Date Logistics Manager Date Manufacturing Engineer Date Engineering Manager Date Quality Manager Date Interim approval Approved Rejected STATUS: until