Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

CURRICULUM VITAE

PERSONAL PARTICULARS

Name : Ir. Chai Seong Wai


Age : 51
Place of Resident : Cheras, Selangor
Nationality : Malaysian
Gender : Male
Marital Status : Single
Contact No : +6017 878 1819
Email Address : chaiseongwai@yahoo.com

SECONDARY EDUCATION

St. John's Institution, Bukit Nanas, Kuala Lumpur


 Sijil Tinggi Pelajaran Malaysia, 1988
 Sijil Pelajaran Malaysia, 1986

Sekolah Menengah La Salle, Sentul


 Sijil Rendah Pelajaran, 1984

TERTIARY EDUCATION

Universiti Putra Malaysia, Serdang


 Master of Structural Engineering and Constructions, 2014

Universiti Pertanian Malaysia, Serdang


 Bachelor of Civil Engineering (Hons), 1993

PROFESSIONAL AFFILIATION

Board of Engineers, Malaysia


 No: C111475, Professional Engineer with Practising Certificate, 2003

The Institution of Engineers, Malaysia


 No: M 26918, Member, 2006

Suruhanjaya Perkhidmatan Air Negara


 No: QP 2535, Qualified Person, 2011

CV of Ir. Chai Seong Wai (Jobstreet 2020)


Page 1 of 6

From JobStreet.com
LANGUAGE & SOFTWARE SKILLS

Bahasa Malaysia & English


 Very Good
Mandarin & Cantonese
 Basic Conversation

Microsoft Office Software


 Good
Engineering Design and Management Software
 Intermediate

EMPLOYMENT RECORD

FREELANCE
 Mac 2019 – Present : Freelance C&S Engineer

GJ RUNDING SDN. BHD.


 Oct 2011 - Feb 2019 : Associate Director
 Mac 2009 - Sep 2011 : Chief Resident Engineer
 May 2007 - Mac 2009 : Civil & Structural Resident Engineer
 Jan 2007 - Apr 2007 : Associate Director
 Nov 2006 - Dec 2007 : Senior Civil & Structural Engineer
 Sep 2005 - Oct 2006 : Civil & Structural Resident Engineer
 Aug 1997 - Aug 2005 : Senior Civil & Structural Engineer

GABUNGAN JURUBINA SDN. BHD.


 Mac 1997 - Jul 1997 : Senior Civil & Structural Engineer
 Jul 1993 - Feb 1997 : Civil & Structural Engineer

REMUNERATION

Salary
 Last Drawn : RM 12,000 / mth
 Expected : Negotiable

Other Perks
 Performance : 1 - 2 mths Bonus
 Expected : Negotiable

CV of Ir. Chai Seong Wai (Jobstreet 2020)


Page 2 of 6

From JobStreet.com
PROFESSIONAL EXPERIENCE

A. HOSPITAL & HEALTHCARE FACILITIES

1. Projek Menaiktaraf Kemudahan Bilik Bersih Total Parental Nutrition (TPN) dan
Cytotoxic Drug Reconstitution (CDR), di Jabatan Farmasi for Jabatan Kerja Raya /
Kementerian Kesihatan Malaysia.
(Project Completed in 2018)

a. TPN at Hospital Raja Perempuan Zainab 2, Kota Bahru (Completed in 2016)


b. CDR at Hospital Sultan Ismail, Johor Bahru (Completed in 2016)
c. TPN at Hospital Sultanah Aminah, Johor Bahru (Completed in 2018)

- Lead in the Contractor’s tender bidding design, detailed design, construction


implementation and the overall project management.

2. The Proposed Sarawak General Hospital Upgrading Works, Phase 1, Kuching, Sarawak
for The Ministry of Health.
(Project Completed in 2012)

a. Package 1 – Fire Safety Works (Completed in 1996)


b. Package 2 – Infrastructure Works (Completed in 1998)
c. Package 3 – New Building Works (Completed in 2000)
d. Package 4 – Refurbishment Works (Completed in 2009)
e. Package 5 – Building Extension Works (Completed in 2012)

- Lead in the planning, detailed design, construction implementation, construction


supervision (Package 4) and the overall project management.

3. Cadangan Merekabentuk, Membina, Melengkapkan, Mentauliah dan Menyelenggara


Hospital Baru Kluang, Johor (268 Katil) for Kluang Healthcare Sdn. Bhd.
(Project Completed in 2011)

- Involved in the Contractor’s tender bidding design, detailed design, construction


implementation, construction supervision and the overall project management.

4. The Design, Construction, Equipping and Commissioning of One Block of Labour &
Delivery Suites, Paediatric Wards and Obstetrics Wards, Kota Tinggi Hospital, Kota
Tinggi, Johor for Insani–Shaza–Z&D JV Sdn. Bhd.
(Project Completed in 2004)

- Involved in the planning, preliminary design and the overall design


management.

5. The Proposed Universiti Sains Malaysia Medical School (Phase 2) at Kubang Kerian,
Kelantan for Universiti Sains Malaysia.
(Project Completed in 1995)

- Involved in the design of structural works.

CV of Ir. Chai Seong Wai (Jobstreet 2020)


Page 3 of 6

From JobStreet.com
PROFESSIONAL EXPERIENCE (Cont’d)

B. COMMERCIAL BUILDINGS & INDUSTRIAL PROJECTS

1. The Proposed Bangsar 61 (Phase 1) Mixed Development on Lot 20001, Jalan Maarof,
Kuala Lumpur for Bangsar 61 Sdn. Bhd. (Pelaburan Hartanah Berhad)
(Project Status as of Feb 2019)

a. P1 – Retaining Wall and Piling (Sect 1) (Completed in 2017)


b. P2 – Retaining Wall & Piling (Sect 2) and Basement (Completion 10%)
c. P3 – Tower 1 (Design 50%)
d. P4 – Underpass (Design 50%)

- Lead in the design and overall project management.

2. The Provision of Principal Submitting Principal for Development Petronas Stations for
Petronas Dagangan Berhad.
(Project Status as of Feb 2019, Design Completion 50%)

- Lead in the design and overall project management.

3. The Provision of Project Services to Supervise The EPCC, DODO & BAT Works of
Petronas Stations for Sabah & Sarawak for Petronas Dagangan Berhad.
(Project Completed in 2014)

- Lead in the construction supervision management.

4. The Proposed Warehouse at Hulu Kelang, Selangor for Euro-Atlantic Sdn. Bhd.
(Project Completed in 2006)

- Involved in the planning, preliminary design and overall project


implementation.

5. The Proposed Submarine Cable Stations at Labuan, Miri, Kuching, Bintulu and Mersing
for Telekom Malaysia Bhd.
(Project Completed in 1996)

- Involved in the design and construction implementation.

6. Cadangan Pembinaan Kilang Perabut di Perkampungan Perabut Ulu Yam, Hulu


Selangor, Selangor Darul Ehsan for Guthrie Furniture Sdn. Bhd.
(Project Completed in 1995)

- Lead in the design and construction implementation.

7. The Proposed YTL Paka, Terengganu and YTL Pasir Gudang, Johor Meter Stations for
Boccard (M) Sdn. Bhd.
(Project Completed in 1994)

- Involved in the design of gas pipes, valves and scrapper launchers foundations.

CV of Ir. Chai Seong Wai (Jobstreet 2020)


Page 4 of 6

From JobStreet.com
PROFESSIONAL EXPERIENCE (Cont’d)

C. RESIDENTIAL SCHEMES

1. The Proposed Development (Phase 2A3) of 38 Units of 1, 1½ and 2 Storey Semi-


Detached Houses on PT. 1560 and 1930 Bukit Cerakah, Selangor Darul Ehsan for Bukit
Cerakah Development Sdn. Bhd.
(Project Completed in 2003)

- Involved in the structural and foundation design works.

2. Cadangan Membina & Menyiapkan 34 Unit Rumah Berkembar Dua Tingkat dan 4 Unit
Lot Rumah Sesebuah di atas Lot 674 GM 422, Sg. Sekamat, Mukim Cheras, Hulu
Langat, Selangor Darul Ehsan for UDA Holdings Bhd.
(Project Completed in 2000)

- Lead in the overall project management.

D. ROAD AND BRIDGE PROJECTS

1. Projek Penyesuaian Lalulintas di Persimpangan Bertingkat Pandan Indah for Jabatan


Kerja Raya Malaysia (Cawangan Jalan).
(Project Completed in 2012)

- Involved in the planning, initial engineering study, initial design and the initial
project management.

2. The Proposed Road Rehabilitation and Slope Stabilisation Works at Bukit Dabei
Microwave Hill Station, Marudi, Sarawak for Telekom Malaysia Bhd.
(Project Completed in 2004)

- Involved in the planning, preliminary design and the overall project


management.

3. Cadangan Merekabentuk dan Membina (Design & Build) Jambatan ‘R.C’ di Sungai Besi
berdekatan Workshop JKR Menyeberangi Sungai Kerayong, Kuala Lumpur for Utusan
Seni Sdn. Bhd.
(Project Completed in 2001)

- Involved in the overall project management.

E. TELECOMMUNICATION FACILITIES

1. The Proposed TM Touch Infrastructure Works for TM Cellular Sdn. Bhd. 400 sites of
ground & rooftop structures throughout Malaysia.
(Project Completed in 2001)

- Lead in the design audit of the Turnkey Contractors’ proposals, construction


implementation and the overall project management.

CV of Ir. Chai Seong Wai (Jobstreet 2020)


Page 5 of 6

From JobStreet.com
PROFESSIONAL EXPERIENCE (Cont’d)

F. RAILWAY PROJECTS

1. The Construction, Upgrading and Associated Works for Permanent Way & Track
Maintenance Machineries Depot Shah Alam, Selangor for NBCT Rail Sdn. Bhd.
(Project Status as of Feb 2019, Construction Completion 85%)

- Lead in the overall project management.

2. The Proposed New Operation Control Centre Building for Ampang LRT Line Extension
for George Kent Lion Pacific JV.
(Project Completed in 2014)

- Involved in the overall design management.

3. The Design, Construction, Completion, Testing, Commisioning and Maintenance of


The Railway Development at Batu Gajah, Perak IJM Corporation Berhad.
(Project Completed in 2009)

- Involved in the design of road and railway RC box culverts.

4. The Proposed Electrified Double Track Project from Ipoh – Pulau Pinang – Padang
Besar for The Ministry of Transport.
(Pre Award Phase Completed in 2003)

- Assisted in the design audit of the Turnkey Contractor’s Proposal for structural
works.

5. The Proposed Electrified Double Track Project from Sentul to Batu Caves for DRB–
Hicom Bhd.
(Turnkey Contractor has submitted the Bid Proposal to the Government in 2003)

- Assisted in the design audit of the Turnkey Contractor’s Proposal for buildings
structural works.

6. The Preliminary Engineering and Route Alignment Study for Ipoh – Pulau Pinang –
Padang Besar Double Track Railway for The Ministry of Transport.
(Study Completed in 2001)

- Assisted in the preparation of the preliminary study of all associated structural


works.

CV of Ir. Chai Seong Wai (Jobstreet 2020)


Page 6 of 6

From JobStreet.com

You might also like