Daily Report 13 Nov 2019

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 21

Project Name : JAWA-1 Combined Cycle Gas Turbine Power Plant (1760MW)

Company : PT. CIGADING HABEAM CENTRE


Work Classification : Erection And Contruction Steel Structure

Today: 13 November 2019 (Wed


Area Ac
CHC Site Office
and Lay Down CHC Prepare material and equipment for erection TB1&TB2
survey check coordinate verticality ,inspection coordinate
Load Unload material TB1&2
Prepare erection
Inspection QC Material unload

Turbin Building #1 LOAD MATERIAL AFTER INSPECTION ,


continue erection
SCAFOLD FLATFORM WORKING , TOUCHUP PAINT , SURVEY CO
check coordinate

Turbin Building #2 continue erection


TIGHTENING BOLT , RAFTER LINE ,CONNECTION COLOUMN AND
BOLTING VB , AND BEAM LINE 4-5 (A-B),
ALIGMENT LINE, centerline coordinate check and mark,
continue erection
VERTICALITY CHECK 4B
Description
Erection TB2 VBR45-34
ILC1-5
SG18-24
SC13-16
SC14-12
VBR45-35
VBR44-31
VBR45-34

Erection TB1 SG18-12


SC13-3
SB13-118
HBR565-91
HBR565-78
HBR565-93
HBR565-81
HBR565-95
HBR565-94
SB13-118
HBR565-117
HBR565-82
SB13-119
HBR565-116
HBR565-92
SB18-17
SB18-5
Materials
Item
SEE packing list, 0411/SCT/CHC-1/XI/2019 rev-1 (15,46 TON)
Daily R
d Cycle Gas Turbine Power Plant (1760MW)
ABEAM CENTRE
ruction Steel Structure

Work Summa
Today: 13 November 2019 (Wednesday)
Activity

ial and equipment for erection TB1&TB2


coordinate verticality ,inspection coordinate
material TB1&2
on
Material unload

L AFTER INSPECTION ,
ion
FORM WORKING , TOUCHUP PAINT , SURVEY COORDINATE LINE AND VERTICALITY , BOLTING BRACE
ate

n
OLT , RAFTER LINE ,CONNECTION COLOUMN AND BRACE
ND BEAM LINE 4-5 (A-B),
E, centerline coordinate check and mark,
ion
K 4B
Work Progress
Unit Total Q'ty
1
1
1
1
1
2
1
1

1
2
4
1
1
1
1
1
1
4
1
1
6
1
1
1
1
Materials
Item Unit Prev.
19 rev-1 (15,46 TON) 1
Daily Report

Work Summarization
Tomorrow: 14 No
Area
CHC site Office
& Lay down CHC

Turbin Building #1

ERTICALITY , BOLTING BRACE

Turbin Building #2
Work Progress Quantity
Up to Last day Today Accum.
Today Accum.
Title (Job Position)
Indirect
PROJECT MANAGER
SITE MANAGER
QUALITY CONTROL
INSPECTORE SCAFFOLDER
SUPERVISOR LIFTING
SUPERVISOR ERECTION
SITE ADMIN
SURVEY + ASS
LOGISTIK
EHS SAFETY
MEKCANIC
PERMIT HOLDER
DRIVER

Sub Total

Direct
FOREMAN FITTER ERECTION
FITTER ERECTION
WELDER
RIGGER
SCAFFOLDER
SIGHYALMAN
LABOUR/HELPER
FLAGMAN
OPERATOR + ASISTEN + MECANIC

Sub Total
Total
Tomorrow: 14 November 2019 (Thursday)
Activity
cum. Progress Plan Remark
0% 100%
- 0% 100%
- 0% 100%

- 0%
- 0%
Manpower Status
On-Site (Number) Total Day time (Hour)
Day Night Prev. Prev. Today Accum.

- -
1 - 10 10
1 - 10 10
1 - 10 10
1 - 10 10
2 - 20 20
1 - 10 10
3 - 30 30
1 - 10 10
2 - 20 20
2 - 20 20
1 10
1 10

17 0 - - 170 150

1 - 10 10
10
2
2
9
2
2
4 - 40 40
11 11 11

43 0 - - 61 61
60 0 - - 231 ###
Prepared by Confirmed by Approved by

Teten H Husein H Lukman Hakim

13 November 2019

Equipments
Item On Site Prev. Today Accum.
Crane Roughter 60 t 1 1 1
Crane Roughter 50 t 1 1 1
Boom Lift 38 m 1 1 1
Boom Lift 26 m 1 1 1
Trcuk Crane TMC 1 1 1
Trailer rental - -
Genset 15 KVA 1 1 1
Genset 10 KVA 1 1 1
Level 2 2 2
Total Station 2 2 2
Lifting gear 1 1 1
Crawler crane 90 t 1 1 1
Crane rougther 25t 1 1 1
(Hour) Night Time (Hour) Total
Accum. Prev. Today Accum. Accum.

- - - - -
10 - - - 10
10 - - - 10
10 - - - 10
10 - - - 10
20 - - - 20
10 - - - 10
30 - - - 30
10 - - - 10
20 - - - 20
20 - - - 20

150 150

10 - - - 10

40 - - - 40
11 11
- -
61 - - - 61
- 0 0 0 211
5/7/2019