Professional Documents
Culture Documents
Thermaltake Core w200 Manual
Thermaltake Core w200 Manual
TT Premium Line
User's Manual
Benutzerhandbuch
Mode d’emploi
Manual del usuario
Manuale dell’utente
Manual do Utilizador
安裝說明書
用戶手冊
ユーザーズマニュアル
Руководство пользователя
kullanıcı elkitabı
(EEE Yönetmeliğine Uygundur)
คู ่ ม ื อ การใช้
Tested To Comply
With FCC Standards
FOR HOME OR OFFICE USE
www.thermaltake.com
TT Premium
TT Premium
To continue achieving the corporate mission of delivering the
perfect user experience, Thermaltake developed “TT Premium”
with the essence of combining supreme quality products with a
new logo design. TT Premium is far more than just a guarantee
of quality. Behind the name, it represents the passion in DIY,
Contents
Modding and Thermaltake’s desire to be the most innovative
brand in the PC hardware market. To satisfy the demand of the
high-end PC users, TT Premium follows its core values of
Excellent Quality, Unique Design, Diverse Combinations and
Boundless Creativity to provide a high performance PC product
for every enthusiast. http://ttpremium.com
Core W200 Installation
Tt LCS-Liquid Cooling Support Certification 1. Chassis Installation 01
3. HDD Installation 50
4 W2-D TOP PANEL 1 14 W-I LED STRIP BRACKET 1 S- B Beze l bolt #6-32 x 3.5mm 14 For front & top plate
5 W2-E BOTTOM PANEL 1 15 W-J 525 IO PLATE 2 S- C Screw #6-32 x 5mm 4 For side plate location
6 W2-F 2nd MB TRAY 1 16 W-K FAN FIXED PLATE 6 S- D Screw #6-32 x 6mm 8 For PSU
7 W-A CORNER BAR 4 17 W-L HDD CAGE BRACKET 2 For HDD/ODD cage/bracket/
S- E Screw #6-32 x 6mm 46
8 W-B MB TRAY 1 18 W-M HDD CAGE 5 foot stand
9 W-C WIN SIDE PANEL 1 19 W-O FAN HOLE AIR COVER 8 S- F Screw #6-32 x 28mm 24 For bottom 14 cm fan
20 FILTER
10 W-D AIR SIDE PANEL 1 PS-E 7 S- G Screw #6-32 x 10mm 16 For casters/stacking
W1-D
S- I Stand-off #6-32 x 6.5mm 32 For motherboard
S- L
PS-E
Screw M3 x 5mm 56 For 2.5"HDD/SSD
01 02
Core W200 Chassis Installation Core W200
W-B
W-A
S-A(x6)
S-A(x4)
W-A
W2-B
S-A(x12)
W-A
S-A(x6)
W-A
W2-C
03 04
Core W200 Chassis Installation Core W200
S-M(x6)
PS-A
S-A(x6) PS-A
W-S(x10)
S-N(x10)
W2-F
05 06
Core W200 Chassis Installation Core W200
W-S(x10)
S-N(x10)
W2-F
S-N(x2)
S-A(x12) W2-E
07 08
Core W200 Chassis Installation Core W200
OR
O-F
S-H(x16) O-F
S-A(x4)
UNLOCK LOCK
OR
W-I
S-E(x1)
O-D
S-E(x4)
O-D
O-D
O-D
09 10
Core W200 Chassis Installation Core W200
W-C
W-D
S-E(x8) W-J(x2)
O-G O-G
S-A(x2) S-A(x2)
S-C(x2)
Note:
11 12
Core W200 Chassis Installation Core W200
W-C
Step 3
S-O(x1)
S-B(x8)
Step 2
W2-A
Step 1
W2-D
W-D
Step 3
Step 2
S-B(x4)
Step 1
13 14
Core W200 Chassis Installation Hardware Installation Core W200
PS-E
PS-E
PS-E
PS-E
PS-E
PS-E
Complete
O-C(x4)
15 16
Core W200 Hardware Installation Core W200
S-K(x9)
S-D(x8)
S-J(x1)
S-I(x9)
17 18
Core W200 Hardware Installation Core W200
S-J(x1)
W-K(x6)
S-I(x9)
S-K(x9)
W-N
S-K(x4)
W-N
S-E(x4) 1
10
19 20
Core W200 Hardware Installation Core W200
PS-D
3 PS-D
S-L(x4)
4
S-E(x4)
21 22
Core W200 Hardware Installation Core W200
S-E(x12)
PS-B
W-L
W-L
S-E(x4)
PS-C
PS-C
23 24
Core W200 Hardware Installation Core W200
S-M(x3)
25 26
Core W200 Hardware Installation Air Cooling Installation Core W200
12 cm Fan
Rear
Front
PSU
180
mm
Front:
Bottom 7 x 120mm
Rear:
2 x 120mm
Bottom:
6 x 120mm
Front
Rear
P S0 mUm
18
Bottom
27 28
Core W200 Air Cooling Installation Core W200
14 cm Fan
W-E(x3)
Rear
12 cm Fan(x4)
PS
180 U
mm
Front:
Bottom
S-F(x12)
7 x 140mm
Rear:
2 x 140mm
Bottom:
6 x 140mm
Front
Rear
14 cm Fan(x4)
P S0 mUm
18
Bottom
S-F(x12)
29 30
Core W200 Air Cooling Installation Liquid Cooling Installation Core W200
Top
20 cm Fan(x3)
W-E
20 x 60cm
12 x 48cm W-E
W-E
12 x 48cm
20 x 60cm
W-E
Right
14 x 56cm 12 x 48cm
14 x 56cm
14 x 56cm
W-E
UNLOCK LOCK
Rear 14 x 56cm
20 x 60cm
12 x 48cm
14 x 14cm
12 x 12cm
PS
180 U 14 x 28cm
mm
Bottom
Front
S-N(x8) 14 x 28cm
12 x 36cm
Front :
1 x 360mm
Bottom :
2 x 280mm
Top :
2 x 480mm , 2 x 560mm , 1 x 600mm
Right :
2 x 480mm , 2 x 560mm , 2 x 600mm
Rear :
1 x 120mm , 1 x 140mm
31 32
Core P200 Part List Core P200
P-A
O- A Bezel bolt holder 2 For bezel or top plate
W-O PS-E
O- B Cable ties 10 Cable management
W-O
W-O
O- C PSU stand 8 For PSU
P2-A
W-O W-O
W2-E
PS-E
PS-E
33 34
Core P200 Chassis Installation Core P200
S-A(X8)
P2-B
S-A(X6)
W-A
P2-C
W-A
S-A(X6)
S-A(X6)
W-A
W-A
35 36
Core P200 Chassis Installation Core P200
S-C(X2)
S-A(X12)
W2-E
O-D
O-G O-G
S-E(X4) O-D
O-D
S-A(x2) S-A(x2)
O-D
37 38
Core P200 Chassis Installation Core P200
P-A Step 3
Step 2
S-O(x1)
S-B(x4)
Step 1
P2-A
P-A
Step 3
PS-E
Step 2
PS-F
PS-E
Step 1 PS-E PS-E
39 40
Core P200 Chassis Installation Air Cooling Installation Core P200
12 cm Fan Front:
1 x 120mm
Bottom:
6 x 120mm
Front
O-C(x8) Bottom
14 cm Fan
Front:
1 x 140mm
Bottom:
6 x 140mm
Front
S-D( x 8)
Bottom
S-F( x 24) W-O
41 42
Core P200 Air Cooling Installation Core P200
W-E(x2)
14 cm Fan(x4)
12 cm Fan(x4)
OR
OR
43 44
Core P200 Air Cooling Installation Liquid Cooling Installation Core P200
20 cm Fan(x3)
Top
W-E
20 x 60cm
OR
14 x 56cm W-E
14 x 56cm W-E Right
W-E
12 x 48cm
14 x 56cm
12 x 48cm
12 x 48cm
14 x 56cm
S-N(x2)
W-E
Bottom 14 x 56cm
Left 14 x 56cm
45 46
Core WP200 Stacking Installation Core WP200
W200
P200
S-H(x4)
W-P(x3) W-P(x3)
S-G(x4)
Complete
47 48
Core WP200 ODD Installation HDD Installation Core WP200
3.5” HDD
W-N
2.5” HDD/SSD
S-E(x4)
PS-D
W-M
S-E(x4)
S-L(x4)
1
1
2
2
3
3
49 50
Core WP200 HDD Installation Core WP200
S-E(x4)
P-B P-B
OR
S-E(x4)
51 52