RCDC-IRFI-10195-001 Functionality Test - Floor & Wall Finishes Installation Rev.1
RCDC-IRFI-10195-001 Functionality Test - Floor & Wall Finishes Installation Rev.1
PROJECT : CONTRACTOR :
LOCATION : DATE :
CLIENT : BUILDING ID :
FLOOR
WALL
CONFIRMATION
CONSTRUCTION METHOD/INSTALLATION:
CONTRACTOR CHPBCC
1. Layout and surface preparation / underlays
2. Floor and wall embedments / anchorage
3. Waterproofing (pre-requisite),verify result of test
4. Material shading/color/ pattern uniformity
5. Plumbness
6. Eveness/Squareness
7. Corner termination / trim
8. Joint alignment
9. Grouting
10. Framing
11. Final Finish
13. Rendering ready to receive floor/wall finish
14. End trims
15. Slope to Drain T&B
16. Slope to Drain Balcony
17. Others, pls. Specify
NOTE : SIGNATURE OVER PRINTED NAME, INDICATE COMPANY & DATE SIGNED
INITIAL DATE OF TESTING FINAL DATE OF TESTING
CONTRACTOR REP.:
CONTRACTOR
CHPBCC REPRESENTATIVE
OWNERS REPRESENTATIVE
OWNERS REPRESENTATIVE