Mohammad Farhan Nasim: Electrical Project Engineer

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

MOHAMMAD FARHAN NASIM

Electrical Project Engineer


+918961506919

nasimfarhan998@gmail.com
live:nasimfarhan998
Profile Summary
A skilled Electrical engineer with inherent learning abilities, project management
skills and extensive on-site and project experience in Power construction field in
WORK EXPERIENCE major Solar & Wind Power Plant. Being a goal oriented person and a team player,
4 years 2 months can work well under pressure to deliver result.

Education
Bachelor of Technology (ELECTRICAL) Graduated, June 2016
BP Poddar Institute of Management and Technology DGPA- 8.83/10
West Bengal University of Technology Division: First
Kolkata, West Bengal
Higher Secondary Graduated, May 2012
A.D.L.S Sunshine School Percentage of Marks- 90%
ICSE Board Division: Distinction
Jamshedpur, Jharkhand

Work Experience
Dec 2018 to till date
Site Engineer (Electrical)
UNIQUE GREEN ENERGY SOLUTION (UGES)
Project: 20 MW Solar Power Plant, Pavagada, Bangalore
Client: Ms. Atria Power
Key Responsibilities
 Responsible for overall Execution of 66 kV Tower based Transmission line of 18 km in progress.

Project: Site Due Diligence (300+300) MW Wind Power plant, Bhuj & Dwarka, Gujarat.
Client: Enel Green Power
Key Responsibilities
 Detail site pre-feasibility study of Wind Power 300 + 300 MW project including 220 Kv EHV transmission line
of 75 Km for Ms. General Electric at Bhuj & Dwarka, Gujarat.
 Site Pre-Feasibility & preparation of KMZ & Auto CAD files for project report finalization.

Project: 101.2MW Wind Power plant, Bhuvad, Gujarat.


Client: Ms. Renew Power.
Key Responsibilities
 33KV Transmission Line work surveying, Erection of Poles (approx 50 Km) and Stringing of line work from
Main Substation to Group substation feeders and one WTG (Wind turbine generator) to another WTG.
 Erection and commissioning of 21 No’s 2.6 MVA transformers with Compact substation Equipments
assembly ( DP structure and Compact Substation Switchgears)
 Electrical testing activities such as Megger, Hi pot, Control circuit & Earth testing & Elcho meter zinc coating
test.
 Handling Two OEM Ms. Senvion and Ms. InoxWind on Simultaneously.

Project: 120 MW (220kV/ 33kV pooling station) Wind Power plant, Bijapur, Karnataka.
Client: Ms. Atria Power
Key Responsibilities
 33KV Transmission Line work surveying, Erection of Poles (approx 102 km) and Stringing of line work from
Main Substation to Group substation feeders and one WTG (Wind turbine generator) to another WTG.
 Preparation of Daily Report Weekly Report, Monthly Report, Project Schedule and Monthly project reviews
Co-ordination with sub-contractors and handling labor contractors.
 Transmission Line site execution up to 220 KV which includes tower foundations and stringing & testing and
Monitoring /Supervision of power cable laying, glanding, termination & cable jointing.
 Electrical testing activities such as Meggering, Hi pot, Earth testing & Elcho meter zinc coating test.
 Planning and forecasting of resource requirements i.e. material requirement, manpower requirement,
equipment requirement, etc.
 Budget planning, execution and preparation of work measurements (JMC’s) and bill preparations.
 Erection & Commissioning of 40 no’s Double Pole switching yard.
 HOTO to M/s Atria O&M of all Electrical System (220/33 kV Substation, 7 km 220 kV EHV Transmission line
& 102.5 km 33 kV transmission line).

May 2018 to Nov 2018


Site Engineer (Electrical) – Substation Equipments Installation, cable laying, termination and Site execution.
RR POWER SOUTION
Project: 4.9 MW Solar Power Plant, Sangola, Maharashtra
Client: Mitcon Consultancy and Engineering Services Pvt Ltd.
Key Responsibilities
 Erection and Commissioning of 33/0.55kV 5.6 MVA Power Transformer (Make: Raychem).
 Installation of 33kV Switchgear (Make: Schneider), ACDB and PLC panel.
 HV, LV, Control cable laying and Termination.
 Indoor and Outdoor Lighting and Overall Earthing of Plant.
 Review of Construction drawings for Grid Stations, Switchgears, HV cable laying & terminations and Control
protections of the Substation equipments.

Project: 40 MW Solar Power Plant, Padampur, Orissa.


Client: General Electric (Transmission & Distribution limited).
Key Responsibilities
 Erection and Commissioning of 132/11kV 40 MVA Power Transformer (Make: Voltamp, Sl.No: JN: 22823).
 Installation of 11kV Switchgear (10 no’s Make: Schneider), 132 kV Control and Relay panel, RTCC panel,
ACDB and PLC panel.
 Erection and Commissioning of 11 No’s of 11/0.55kV 4 MVA Transformer (Make: Raychem).
 Supervise laying of 14km HV cable (3CX300 sq mm, 11 kV earthed, KEC MAKE).
 HV, LV, Control cable laying and Termination.
 22 NOS 3CX300 sq mm Straight Joints, Indoor and Outdoor End termination Witnessing.
 Indoor and Outdoor Lighting and Overall Earthing of Plant.
 Review of AFC drawings for Grid Stations, Switchgears, HV cable laying & terminations and Control
protections of the Substation equipments.
 Overall supervision of construction, erection and commissioning work of electrical distribution system at
site, solution of technical problems, monitoring of site work.

July 2016 – April 2018


Electrical Engineer
POWERGEN TECHNICAL SERVICES
Project: Electrical Work
Client: Indian Oil Corporation Limited (Digboi Refinery).
 Installation of 6.6 kV Switchgear (3 no’s Make: Siemens).
 HV, LV, Control cable laying and Termination for the above switchgear.
 Preparation of Electrical Load list and Single Line Diagram (SLD).
 Relay setting & co-ordination.
 Equipment sizing for transformer, current transformer, potential transformer, Circuit breaker &
Underground cables etc.
 Prepares Bill of Material (BOM) based on the electrical drawings.
Project: Electrical Work
Client: Indian Oil Corporation Limited (Barauni Refinery).
 Erection and Commissioning of 2 No’s of 11/0.433kV 2 MVA Transformers.
 Cable laying and terminations and coordination with Testing and commissioning team.
 Preparation of Electrical Load list and Single Line Diagram (SLD).
 Relay settings and relay coordination studies covering transformer, motor and bus bar protections.
 Over current and earth fault protection coordination and settings at all 33kv, 11kv, 6.6kv, 3.3kv and 415v
incomers and all out going feeder of the electrical system.
 Prepares Bill of Material (BOM) based on the electrical drawings.

Skills
 Planning and Supervision
 Team work
 Manpower Management
 Effective Communication
 Quality Inspection

Computer Proficiency

 Operating Systems: Microsoft Windows 98/2000/XP/Vista/7/8/10.


 Proficient: Ms Excel, Word, PowerPoint.

Languages
 English
 Hindi

Personal Details
 Father’s Name :Md Nasim Ansari
 Birthday :March 25, 1994
 Gender :Male
 Permanent Address : H.no-11, Rd.no-27, B Block Noor Colony, Mango, Jamshedpur,
Jharkhand-832110, India

Passport Details
 Passport No. : R4496339
 Date of Issue : 27.11.2017
 Date of Expiry : 26.11.2027
 Place of Issue : Ranchi

Declaration
I, Mohammad Farhan Nasim, hereby declare that the information contained herein is true and correct to the best of
my knowledge and belief.

Mohammad Farhan Nasim


Dwarka, Gujarat
22th August, 2020