Assignment 2 - Analysis
Assignment 2 - Analysis
Low
High
Medium
Medium
Medium
High
Low
Low
Low
33 July'05 Noise
Medium
34 July'05 Dust
High
Low
Owner
Person who will manage
Severity the risk.
Impact if the risk occurs Rating based on
impact & likelihood.
Project Manager
Medium Medium
Project Manager
High High
Contractor
High High
Contractor
High High
Contractor
High High
Contractor and Project
Manager
High Medium
Project Manager
High High
High High
Contractor
Medium Medium
Contractor
Low Low
Contractor
Medium Medium
Contractor
Medium Medium
Contractor
High High
Contractor
Medium High
Contractor
High High
Contractor
High High
Contractor
High High
Contractor
Medium Medium
Contractor
High High
Contractor
High High
LCC
High Medium
Contractor
High High
Contractor
High High
Contractor
High High
Contractor
High High
Contractor
High Medium
Contractor
Low Medium
Contractor
Medium Medium
Contractor
Medium Medium
Contractor
High Medium
Contractor
High Medium
Contractor
Medium Low
Contractor
Medium Medium
Contractor
Medium Medium
Contractor
Medium Low
Contractor
Medium Low
Contractor
Medium Medium
Contractor
Medium Low
Contractor
Medium Medium
Contractor and
Project Manager
High High
Contractor
High High
Contractor
High Medium
Contractor
High Medium
Contractor
Medium Medium
Mitigating action Contingent Progress on Status
Actions to mitigate the risk e.g. action actions
reduce the likelihood. Action to be
taken if the risk
happens.
Close liaison with LCC tree officer use PPE Verifying design Open
and all timescales to accord with details
legislation and be agreed by LCC
Assumptions Log
Assumptions Log
Assumptions Log
Assumptions Log
Assumptions Log
Assumptions Log
Assumptions Log
Project Status Template
Assumptions Log
Risk ID Entry by Risk (description) Date Raised Impact Probability Project Mitigation measures
Severity
3.1 Design
3.1.1 Mou Insufficient or incomplete design elements July'05 M M M ECI process should aim to eliminate these and ensure all deta
3.2 Programme
3.2.1 Mou Delay in placing orders by LCC for any stats diversions which
July'05
causes prolonged construction
H M
period and phasing
H issues
Funds released in advance of construction to faciliate placing
3.2.2 Mou Delay in placing 01-Nov-2005 H H H Consider alternatives to enable early Stats Work to be underta
Order for the
works with the
Contractor and
3.2.3 Mou Poor co-ordination and management of Utilities performance
02-Nov-2005
on-site H H H Close Liaison and dedicated Utilities Co- ordinator for all stats
knock-on effect to
Utilities work
3.2.4 Mou Procurement of materials and lead in times July'05 H M H Contractor to enagage supply chain in sufficient time and duri
3.2.5 Mou Overrun of ECI 01-Jun-2009 H M H Agree suitable programme and manage costs and timescales
Programme or
incomplete ECI
process leading to
3.3 Disputes and claims
delayed start
3.3.1 Mou Late issue of instructions July'05 H L M Site procedures to be defined by Contractor and regular desig
3.3.2 Mou Early Warning July'05 H M H System to be established such that financial and cost manage
and
Compensation
Event Cost and
Programme
3.4 Site Management and Security
Management
3.4.1 Mou Site security - vandalism to plant, materials and site offices
July'05 H H H Ensure availability of suitable site compound area and 24hr se
3.5.1 Mou Accident or injury to site personnel causes delay or claimsJuly'05 M M M Suitable Construction H&S Plan in place together with site saf
3.6.1 Mou Contractor July'06 H H H Contactor selection process will identify suitable companies a
3.6.2 Mou Supply Chain July'07 H M H Contactor to ensure supply chain protection and contingency
3.8.1 Mou Poor quality materials - delay due to rejection of materials July'05 H M H Sources of materials checked and from reputable companies.
3.8.2 Mou Poor quality workmanship July'05 M H H Selection of contractors will review quality and workmanship c
Risk ID Entry by Risk (description) Date Raised Impact Probability Project Mitigation measures
Severity
3.9.3 Mou Delayed completion of the Works July'05 H H H Tight supervision, programme monitoring and seeking recove
3.9.4 Mou Impact of major events July'05 M M M Contractor to liaise with traffic management group and LCC t
3.9.5 Mou Late materials delivery July'05 H M H Sources of materials checked and from reputable companies.
3.10.1 Mou Client instructed change July'05 H M H Detailed design signed off by Client. Accommodation works fin
3.10.2 Mou Change arising from errors in design July'05 H L M Thorough check undertaken at end of detailed design stage. S
3.11.1 Mou Uncharted and unknown services July'05 H H H Radar surveys carried out to specified lengths where planting
3.11.11 Mou Police suspension of works July'05 M L L All taffic management agreed beforehand and Contractor to e
3.12 Environmental
3.12.1 Mou Noise July'05 M M M Stated levels to be agreed with EHO and Contractor to take n
3.12.2 Mou Dust July'05 M H H Limited activity creating dust. Monitor conditions and have sup
3.12.3 Mou Vibration Damage Nov'05 M L L Need to carefully consider adjacent properties and structures
3.12.4 Mou Timescales for Tree removals and pruning Nov'05 M L L Close liaison with LCC tree officer and all timescales to accord
3.12.5 Mou Ecology, Bats and Other Fauna and Flora Nov'05 M M M Full habitat check to be undertaken in advance of works and a
3.12.6 Mou Japenese Knotweed Nov'05 M M M Checks to be undertaken and mitigation plans in-place for eve
3.12.7 Mou Demolition Arisings July'09 M L L Ensure sheeting sytem for transport and dust supression durin
3.13.2 Mou Stage 3 Safety Audit identifies additional works July'05 M M M Contingency and timescales to allow for minimal additional wo
3.13.3 Mou Delays in getting LCC approval for demolitions July'05 H M H Contractor to undertake early discussions with supply chain a
3.13.5 Mou Delays in July'05 H L M Contractor to enagage Conservation Officer early and underta
obtaining Listed
Building /
Conservation
3.13.6 Mou Delays in obtaining waste management and transfer licences
July'05
for demolition arisings
H L M Contractor to make sufficient allowance in programme and co
Officer approval
for accomodation
works materials
3.13.7 Mou Delays in TM July'05 M M M Early Liaison with LCC Network Management Team and deve
and workmanship
approvals from
LCC for TTRO's /
footway closures
and tie in works
Ownership Adjusted Adjusted Adjusted Status Contractors
Impact Probability Severity Risk Evaluation
(£)
Please Read Comment
Project Manager M L L
Project Manager M M M
Contractor H M H
Contractor H M H
Contractor M M M
Contractor and M M M
Project Manager
Project Manager M M M
Contractor and M M M
Project Manager
Contractor M M M
Contactor L L L
Contactor L M L
LCC M L L
Contactor M M M
Contractor L M L
Contractor L M L
Contractor M M M
Contractor M M M
Contactor M M M
760155 May-09
Ownership Adjusted Adjusted Adjusted Status Contractors
Impact Probability Severity Risk Evaluation
(£)
Contactor L M L
Contactor M M M
Contractor L L L
Contractor M M M
LCC M M M
Mouchel L L L
Contractor M M M
Contractor M M M
Contractor M M M
Contractor M M M
Contractor M L L
Contractor L L L
Contractor L L L
Contractor M M M
Contractor M L L
Contractor L L L
Contractor L L L
Contractor L M L
Contractor L L L
Contractor L L L
Contractor M M M
Contractor M M M
Contractor L L L
Contractor M L L
Contractor and M L L
Project Manager
Contractor M M M
Contractor M M M
Contractor M L L
Contractor M L L
Contractor and M M M
Project Manager
Contractors Comments Last Review
Date
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
Contractors Comments Last Review
Date
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
Contractors Comments Last Review
Date
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
June '09
Date closed
Date closed
Date closed