Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

I

Corporate Core Values

Serve all business partner with FAITH


beyond their expectation.

F : Faithfulness
A : Attentiveness
I : Innovative
T : Totally
H : Honesty
Corporate
Aims

VISION
To be a prominent & reliable machining , construction and
engineering services corporation with world class standard

MISSION
Giving the best benefit and welfare to all stakeholder and
shareholders through the excellent performance, quality and
services

QUALITY POLICY
Leader and all employees of PT. Sinar Sakti Jaya agree to finish
every works / project based on specifications given by customers :
1. Consistent product quality
2. Competitive price
3. The timely completion of works
To realize above quality policy, the company attempt to implement
quality management system according to ISO 9001:2008 and
continuous improvement existing resources.
Facilities
Workshop

Mechanical & Construction Project.


Capacity Workshop
Steel structure : 300 tons/month
Mechanical : 150 tons/month
Area : 50.000 m²
Phone : +62 21 824 808 40
Fax : +62 21 824 808 37
Address : Jl. Raya Klapanunggal No. 37, Kembang Kuning
Kec. Klapa Nunggal, Bogor 16820,
West Java – Indonesia
Email : marketing@sinarsaktijaya.co.id
Website : www.sinarsaktijaya.co.id
Facilities
Equipment

CAPACITY
NO. DESCRIPTION
QTY SAT.
A MACHINERY FACILITY
1 Lathe Machine
- CNC Vertical Lathe Machine CK 5250 Cap. dia. 5.000 x 2.000mm 1 Unit
- CNC Vertical Lathe Machine CK 5240 Cap. dia. 4.000 x 1.900mm 1 Unit
- CNC Vertical Lathe Machine CK 5120 Cap. dia. 2.000 x 1.250mm 1 Unit
- Horizontal Lathe Machine Cap. dia. 2.000 x 4.000mm 1 Unit
- Horizontal Lathe Machine Cap. dia. 1.500 x 250mm 1 Unit
- Horizontal Lathe Machine Cap. dia. 600 x 8.000mm 1 Unit
- Horizontal Lathe Machine Cap. dia. 500 x 5.000mm 2 Unit
- Horizontal Lathe Machine Cap. dia. 500 x 3.000mm 2 Unit
2 Drilling Machine
- Portable Drilling Machine 5 Unit
- Radial Drilling Machine 2 Unit
3 Horizontal Boring Machine
- Portable Line Boring Machine ( Hoffman Engineering, Australia ) 3 Unit
4 Milling Machine
- Planner Machine Cap. 1000 x 1200 x 3000mm 1 Unit
- Milling Machine Cap. 500 x 500 x 1200mm 1 Unit
B MECHANICAL & CONSTRUCTION FACILITY
1 Welding Machine 75 Unit
- Manual up to Automatic Welding Machine
- SMAW, GTAW, GMAW, FCA, SAW
2 Cutting Machine 20 Unit
- Gas Cutting Manual
- Gas Cutting Portable Machine
- Gas Cutting CNC Machine
- Plasma Cutting
3 Hydraulic Jack 2 Unit
- Capacity 200 - 300 ton
4 Forming Machine
- Bending Machine 2 Unit
- Shearing Machine 2 Unit
- Roll plate Machine 3 Unit
- Roll profile Machine 1 Unit
- Hydraulic bottom press (dish end) Machine 1 Unit
- Flanging Machine 1 Unit
5 Sandblasting & Painting Facility 1 Unit

C MAIN FACILITY
1 Power supply
- Workshop II (PLN - 197 KVA x 2)
- Workshop III (PLN - 415 KVA up to 1.000 KVA)
- Power Generator (150 - 250 KVA) 4 Unit
2 Lifting facility
- Overhead crane 5 ton 7 Unit
- Overhead crane 10 ton 1 Unit
- Overhead crane 15 ton 2 Unit
- Overhead crane 25 ton 1 Unit
- Forklift 3 ton 1 Unit

3 Transportation facility 16 Unit


Facilities
Machining

CNC Vertical Lathe Machine CNC Vertical Lathe Machine


Cap. dia. 5.000 x 2.000mm Cap. dia. 4.000 x 1.900mm

CNC Vertical Lathe Machine Portable Line Boring Machine


Cap. dia. 2.000 x 1.250mm

Horizontal Lathe Machine Cap. dia. 600 x 8.000mm


Facilities
Mechanical & Construction

Rolling Machine Cap. Thk. 25mm

Rolling Machine Cap. Thk. 25mm SAW Machine (ESAB)


Facilities
Mechanical & Construction

Hoist Crane Cap. 15 Tons & 25 Tons

CNC Cutting Cap. Thk. 110mm Cutting Shearing Cap. Thk. 12mm

Bodem Machine Cap. Thk. 12mm Flanging Machine Cap. Thk. 12mm
Experiences
Machining

Outer Ring Turbine Outer Ring Turbine

End Ring RR Propeller

Line Boring For Impact Drum Pulley for Conveyor


Hammer Mill
Experiences
Mechanical
Cement Industries

 Re-Routing New Dedusting Pipe


 Fabrication for Stacking Conveyor
 Fabrication of Bucket for Belt Bucket Elevator
 Procurement, Fabrication and Painting of Coal Hopper
 Luhr Filter (Dust Collector)
 Fabrication Multicyclone
 Installation Preheater Cyclone
 Finish Mill Improvement Project
 Fabrication of Hammer Mill (Portable Line Boring)
 Fabrication Airslide Bulk Handling
 Fabrication Pan Appron, Appron Feeder & Drop Chute
 Fabrication Air Slide & Process Fan
 Fabrication Vent Duct Support
 Fabrication & Installation Cement Transport (Air-Slide & Bucket
Elevator)
 Improve Clinker Load Out & Dedusting Project
 HRC Improvement Project
 Fly Ash Facility Project
 Rebuild Housing Bearing Rocker Arm Rawmill
 Fabrication Head Shaft
Experiences
Cement Industries Mechanical

Kiln Shell dia. 4.572 x 10.240mm

Dedusting Facilities
Experiences
Mechanical

Biodiesel Tank Storage Tank

Biodiesel Tank Sedimentation Tank Storage / Silo

Storage Tank ACH Reactor Tank


Experiences
Mechanical

Casing Transformer Casing Transformer

Biodiesel Tank Storage Tank

Biodiesel Tank
Experiences
Mechanical

Biodiesel Tank Crystalizer Tank

Biodiesel Tank Cement Silo

Silo SUS Cap. 500 Ton Air Receiver 25 m³


Experiences
Mechanical
Tank & Vessel
Experiences
Mechanical Others / Part & Component

Heat Treatment Furnace Heat Exchanger

Fabrication & Installation Structure Duct, Chutes & Support For Gold
Mining

Structure for Belt Conveyor Electrostatic Filter Type E400


Experiences
Construction

Fabrication & Fabrication & Installation


Installation Clay Storage Hoist Crane – 60 Ton

Fabrication Gallery For Coal Fabrication Gallery For Coal


Mining Mining

Scrap Yard Building 8000m2 Fabrication Sliding Formwork


Experiences
Construction

Filter Press Chute Trestle Tower

Crushing Building Screen Building

Cyclone Tower Grizzly


Experiences
Coal Mining Facilities Construction

Radial Stacker Conveyor Gantry Standard Conveyor

Tripper Frame Conveyor Overland Conveyor

Idler Frame
Experiences
Factory Plant Facilities Structural
P&G-Project Plant Karawang
Experiences
Indocement Cement Terminal Structural
Dawuan - Cikampek
Quality
Assurance
Our Clients
Our Clients
PT SINAR SAKTI JAYA
Mechanical & Construction Project

Jl. Raya Klapanunggal No. 37 Kembang Kuning, Kecamatan


Klapanunggal, Kabupaten Bogor, Jawa Barat, 16820, Indonesia

Capacity
Steel structure : 300 tons/month
Mechanical : 150 tons/month
Area : 50.000 m²
Phone : +62 21 824 808 40
Fax : +62 21 824 808 37

Email : tribudiyono@sinarsaktijaya.co.id
No. Handphone : 0813 8803 3750
: 0822 4626 2215 ( WA )
marketing@sinarsaktijaya.co.id
Website : www.sinarsaktijaya.co.id

TRI BUDIYONO

You might also like