1) The document provides statistics on rural electrification in Bangladesh as of December 2020. It details the number of projects approved, districts and upazillas included, villages electrified, population served, and more.
2) Key figures include 80 power supply boards, 81 approved projects serving 61 districts, 462 upazillas (461 on-grid, 1 off-grid), 84,800 villages included with 84,426 electrified, over 2.5 crore households and 10.7 crore people served.
3) System loss was 10.20% on average in the last 12 months, monthly sales were Tk 2000 crore with a 97.22% bill collection rate, and peak demand was
1) The document provides statistics on rural electrification in Bangladesh as of December 2020. It details the number of projects approved, districts and upazillas included, villages electrified, population served, and more.
2) Key figures include 80 power supply boards, 81 approved projects serving 61 districts, 462 upazillas (461 on-grid, 1 off-grid), 84,800 villages included with 84,426 electrified, over 2.5 crore households and 10.7 crore people served.
3) System loss was 10.20% on average in the last 12 months, monthly sales were Tk 2000 crore with a 97.22% bill collection rate, and peak demand was
1) The document provides statistics on rural electrification in Bangladesh as of December 2020. It details the number of projects approved, districts and upazillas included, villages electrified, population served, and more.
2) Key figures include 80 power supply boards, 81 approved projects serving 61 districts, 462 upazillas (461 on-grid, 1 off-grid), 84,800 villages included with 84,426 electrified, over 2.5 crore households and 10.7 crore people served.
3) System loss was 10.20% on average in the last 12 months, monthly sales were Tk 2000 crore with a 97.22% bill collection rate, and peak demand was
1) The document provides statistics on rural electrification in Bangladesh as of December 2020. It details the number of projects approved, districts and upazillas included, villages electrified, population served, and more.
2) Key figures include 80 power supply boards, 81 approved projects serving 61 districts, 462 upazillas (461 on-grid, 1 off-grid), 84,800 villages included with 84,426 electrified, over 2.5 crore households and 10.7 crore people served.
3) System loss was 10.20% on average in the last 12 months, monthly sales were Tk 2000 crore with a 97.22% bill collection rate, and peak demand was
2 Approved Projects 81 Nos. 3 District included in RE program 61 Nos. Upazillas included in RE 462 Nos. (461 On-grid & 4 program 01 Off-grid) 288 Nos. (Opening Completed) 5 100% Electrified Upazillas 173 Nos. (Waiting to inaugurate) 6 Villages included in RE program 84,800 Nos. 7 Villages Electrified 84,426 Nos. 8 House Hold in Program Area 2,51,68,763 Nos. 9 Population in Program Area 10,68,93,673 Nos. 10 Line constructed 5,43,785 Km 11 Line energized 5,23,540 Km Number of 33/11KV Sub-station 12 1095 Nos. & 13,985 MVA & Capacity 10.20% (12 Month Avg) 13 System loss (80 PBSs) 2.54 (This Month) 14 Monthly Sales Tk 2000 Crore 15 Bill collection 97.22% 16 Peak demand 7100 MW