15/02/2021

এক নজের বাপিবেবাড এর কায ম

(as on December' 2020)

1 Total PBSs 80 Nos.


2 Approved Projects 81 Nos.
3 District included in RE program 61 Nos.
Upazillas included in RE 462 Nos. (461 On-grid &
4
program 01 Off-grid)
288 Nos. (Opening
Completed)
5 100% Electrified Upazillas
173 Nos. (Waiting to
inaugurate)
6 Villages included in RE program 84,800 Nos.
7 Villages Electrified 84,426 Nos.
8 House Hold in Program Area 2,51,68,763 Nos.
9 Population in Program Area 10,68,93,673 Nos.
10 Line constructed 5,43,785 Km
11 Line energized 5,23,540 Km
Number of 33/11KV Sub-station
12 1095 Nos. & 13,985 MVA
& Capacity
10.20% (12 Month Avg)
13 System loss (80 PBSs)
2.54 (This Month)
14 Monthly Sales Tk 2000 Crore
15 Bill collection 97.22%
16 Peak demand 7100 MW

17. Consumer (By category):

1) LT-A (Domestic) 2,78,61,091


2) LT-B (Irrigation) 2,46,846
3) LT-C1 (Small Industry) 1,98,855
4) LT-C2 (Construction) 4,187
5) LT-D1 (Charitable Institute) 3,87,555
6) LT-D2 (Street Light) 21,035
7) LT-D3 (Battery Charging Station) 6,540
7) LT-E (Commercial ) 19,14,367
8) LT-T ( Temporary) 1,063
9) MT-1 ( Domestic) 217
10) MT-2 (Commercial) 1212
11) MT-3 (Industry ) 13,553
12) MT-4 (Construction) 141
13) MT-5 (General) 513
1/2
15/02/2021

14) MT-6 ( Temporary) 80


MT-7 (11 KV Battery Charging Station) 5
MT-8 (11 Kv Irrigation & Agriculture Pump) 42
15) HT-1 (General ) 9
16) HT -2 ( Commercial) 2
17) HT-3 ( Industry ) 441
18) HT-4 (Construction) 3
19) EHT-1 (General) 0
20) EHT-2 (General) 0
21) Solar 13,424
Total 3,06,71,281

Ref: MIS December, 2020 & Line Construction Report November, 2020