Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

User Inputs

Manual input Pipe Schedule or Manual?


Drop Down Input Pipe Schedule
OD
Device 1075 SCARPro Wall Thickness
Isotope Se75
Activity 80 Ci Offset Inputs:
Mode Contact Code
Distance 6.0 ft Beam Masking?
Dose Limit 2 mR/h
Beam Masking (%)
Isodose (Y/N) NO
Hourly Exposure Time 60 minutes Use Minimum
Focal 0.138 inches Offet SFD per
3.51 mm <-check Code?
Film R Factor 2 Rad

Contact Configuration

Backshielding Primary Beam


Total Pipe Backshielding
11.3 - 1.50 = 9.8

Beam Dimensions at Film Plane Shots Per Weld


Axial Beam Height 5.1 inches Arc Length
Beam Width 5.1 inches Min # Shots
Arc Length 5.3 inches Shot Overlap

Shot Time
SFD 7 inches
Shot Time 0 minutes 39 seconds

Offset Configuration - Elliptical & Superimposed

Backshielding Primary Beam


Total Backshielding Lead (in.)
11.3
=
11.3 0.44
OR

Beam Dimensions at Film Plane


Axial Beam Height 7.1 inches
Beam Width 7.1 inches

Shot Time
SFD 20.1 inches
Shot Time 5 minutes 25 seconds
Variables
edule or Manual? SCHEDULE
4 - Sch: 40, Std, 40S Gamma Constant 2.2
28 Isodose Rate 2
inches
0.550 Ug (in) 0.04
Radial
Collimation (deg)
40
ASME API Source to source side wall 2.5
YES Offset SFD 20.1
Radial Axial
50% 50%
YES
↓ Enter Manual STF
14.0 inches

Lead (in.) FlexShield


0.38
OR 4

Per Weld
5.3 inches
3.0
0.2 inches

FlexShield
5
R/hr/Ci @ 1 ft Pipe Variables:
mR/h OD 4.5 inches
ASME API Wall Thickness 0.237 inches
Axial
40 HVL Steel 0.315 inches
inches HVL Lead 0.039 inches
inches

You might also like