DRILLING LOG

KLIEN = PT. ARKONIN TIPE BOR = ROTARY DRILLING Remarks.

NAMA PROYEK = PEMBANGUNAN MERCANTILE TOWER TANGGAL MULAI = 11 DESEMBER 2014 UD = Undisturb Sample

TITIK BOR = BH-1 TANGGAL SELESAI = 14 DESEMBER 2014 CS = Core Sample

MUKA AIR TANAH = ± 0.00 m MASTER BOR = HARNO SPT = SPT Test

LOKASI PROYEK = JL. BSD RAYA UTAMA

UD / CS SPT TEST Standard Penetration Test


Elevation (LWS) in m

Relative Density or

General Remarks
Thickness in m

Blows per each

Type of Soil

Consistency
Depth in m

N - Value
Scale in m

N-Value Blows/30
15 cm
Legend

Colour

Sample Code

Sample Code
Depth in m

Depth in m

15 cm

15 cm

15 cm
cm
0 10 20 30 40 50
0.00 0.00 START OF BORING 0

SIRTU ABU-ABU
LEMPUNG 1
1.00 -1.00
BERPASIR COKLAT
BERKERIKIL
2.00 -2.00 2

3.00 -3.00 -3.00 SPT 1 0 0 0 0 3 0


-3.50

4.00 -4.00 4

5.00 -5.00 5

6.00 -6.00 -6.00 SPT 2 1 0 0 1 6 1


-6.50

7.00 -7.00 7
VERY SPT =
-7.50 UD 01
SOFT 0 s/d 1
8.00 -8.00 LEMPUNG -8.00 8
LANAU

9.00 -9.00 -9.00 SPT 3 1 0 0 1 9 1


-9.50

10.00 -10.00 10

11.00 -11.00 11

12.00 -12.00 ABU-ABU -12.00 SPT 4 1 0 0 1 12 1


-12.50

13.00 -13.00 13

14.00 -14.00 14

15.00 -15.00 -15.00 SPT 5 2 0 1 1 15 2


-15.50

16.00 -16.00 -15.50 UD 02 16

-16.00
LEMPUNG 17
17.00 -17.00
LANAU
BERPASIR SPT =
SOFT
18.00 -18.00 HALUS 2 s/d 3 -18.00 SPT 6 3 0 1 2 18 3
BERKULIT
-18.50
KERANG
19.00 -19.00 19

20.00 -20.00 20

21.00 -21.00 -21.00 SPT 7 10 2 4 6 21 10


LEMPUNG -21.50

22.00 -22.00 22

LEMPUNG ABU-ABU
BERKERIKIL GELAP 23
23.00 -23.00
-23.50 UD 03
24.00 -24.00 -24.00 -24.00 SPT 8 20 4 8 12 24 20
-24.50

25.00 -25.00 25
ABU-ABU STIFF TO
SPT =
VERY
10 s/d 29
STIFF
26.00 -26.00 26

LEMPUNG 26
27.00 -27.00 -27.00 SPT 9 26 5 11 15 27

-27.50

28.00 -28.00 ABU-ABU 28


KECOKLATAN

29.00 -29.00 29

30.00 -30.00 -30.00 SPT 10 29 5 12 17 30 29


LEMPUNG VERY -30.50
SPT = 29
31.00 -31.00 BERLANAU COKLAT STIFF 31

-31.50 UD 04
PASIR
32.00 -32.00 -32.00 32
BERLANAU
HARD SPT = 50
DRILLING LOG
KLIEN = PT. ARKONIN TIPE BOR = ROTARY DRILLING Remarks.

NAMA PROYEK = PEMBANGUNAN MERCANTILE TOWER TANGGAL MULAI = 11 DESEMBER 2014 UD = Undisturb Sample

TITIK BOR = BH-1 TANGGAL SELESAI = 14 DESEMBER 2014 CS = Core Sample

MUKA AIR TANAH = ± 0.00 m MASTER BOR = HARNO SPT = SPT Test

LOKASI PROYEK = JL. BSD RAYA UTAMA

UD / CS SPT TEST Standard Penetration Test


Elevation (LWS) in m

Relative Density or

General Remarks
Thickness in m

Blows per each

Type of Soil

Consistency
Depth in m

N - Value
Scale in m

N-Value Blows/30
15 cm
Legend

Colour

Sample Code

Sample Code
Depth in m

Depth in m
COKLAT

15 cm

15 cm

15 cm
PASIR

cm
BERLANAU 0 10 20 30 40 50
HARD SPT = 50

33.00 -33.00 LANAU -33.00 SPT 11 > 50 13 21 32 33 50


BERPASIR -33.50

34.00 -34.00 34

35.00 -35.00 35

LANAU
36.00 -36.00 BERLEMPUNG HARD SPT = 50 -36.00 SPT 12 > 50 15 25 36 >50
BERKERIKIL -36.50
ABU-ABU
37.00 -37.00 KECOKLATAN 37

38.00 -38.00 38

39.00 -39.00 -39.00 UD 05 39

LEMPUNG HARD SPT = 31 -39.50 -39.50

40.00 -40.00 -40.00 SPT 13 31 6 12 19 40 31