Scope Management
Processes used to identify all the work
required and only the work required
to successfully complete the project
• Collect Requirements
• Define Scope
• Create WBS
• Verify Scope
• Control Scope
2
5. Scope Management Processes
Initiation Planning Executing Controlling
5.2 Define
Scope
3
5.1 Collect Requirements
• Collect Requirements is the process of
defining and documenting stakeholders’ needs
to meet the project objectives.
• Collecting requirements is defining and
managing customer expectations.
• Requirements become the foundation of the
WBS. Cost, schedule, and quality planning are
all built upon these requirements.
4
5.1 Collect Requirements
Inputs Tools And Techniques Output
5
Collect Requirements Data Flow Diagram
6
5.2 Define Scope
• Define Scope is the process of developing a
detailed description of the project and
product.
• The preparation of a detailed project scope
statement is critical to project success and
builds upon the major deliverables,
assumptions, and constraints that are
documented during project initiation.
7
5.2 Define Scope
Inputs Tools And Techniques Output
8
Define Scope Data Flow Diagram
9
5.3 Create WBS
Work Breakdown Structure
10
5.3 Create WBS
Inputs Tools And Techniques Output
11
Create WBS Data Flow Diagram
12
5.4 Verify Scope
• Verify Scope is the process of formalizing
acceptance of the completed project
deliverables. This includes reviewing
deliverables with the customer or sponsor to
ensure that they are completed satisfactorily
• scope verification is primarily concerned with
acceptance of the deliverables while Quality
control is primarily concerned with
correctness of the deliverables and meeting
the quality requirements specified for the
deliverables. 13
5.4 Verify Scope
Inputs Tools And Techniques Output
14
Verify Scope Data Flow Diagram
15
5.5 Control Scope
• Control Scope is the process of monitoring the
status of the project and product scope and
managing changes to the scope baseline.
• Uncontrolled changes are often referred to as
project scope creep.
16
5.5 Control Scope
Inputs Tools And Techniques Output
17
Control Scope Data Flow Diagram
18
Exam Question
• List
What allisthe
theScope
scopeManagement
managementProcesses
and how the
Inputs,change
scope Tools &can
Techniques
impacts Time,
and Outputs
Quality and
and
drawconstraints?
cost all the related diagrams
19