Professional Documents
Culture Documents
APPENDIX 1. Reference Drawing & Equipment Layout
APPENDIX 1. Reference Drawing & Equipment Layout
(with cover)
REFERENCE DRAWINGS
DRAWING LIST
2. Equipment Layout
3. Boiler, Economizer
4. Grate
5. Deaerator
6. Steam Turbine
ADMIN
20,000
BUILDING
30,000
SUB-STATION PARKING PARKING
35,000
6,000
10,000
STEAM
TURBINE
ROOM COOLING
TOWER
220,000
110,000
TIPPING HALL WASTE PIT BOTTOM ASH PIT
12,000 GL+8200
7,000 8,000
AIR-COOLED
STEAM CONDENSER
8,000
GATE Fuel Truck
STACK
Bottom Ash / Fly Ash Truck
20,000
Maintenance Vehicle
15,000
Guest car
WEIGHING BRIDGE GATE
6,000
82,000
146,000
300,000
Hitachi Zosen Corporation
Sample drawing
of Deaerator
+5000