Soil Investigation To RPS: 1. Boring
Soil Investigation To RPS: 1. Boring
METHOD STATEMENT 08
SOIL INVESTIGATION
TO RPS
1. Boring.
The purpose of this boring was to obtain the accurate information on the soil
condition beneath the surface regarding engineering its view point either
obtained from :
- in place test
~ Name of Operator
~ Lithology column
~ Boundary of layer
~ Core Recovery
1
THE JAKARTA FISHING PORT / MARKET DEVELOPMENT PROJECT WASKITA – DAITO JO.
PHASE IV PACKAGE III
METHOD STATEMENT 08
SOIL INVESTIGATION
TO RPS
~ Boring Method
starting the boring activity, during boring until 48 hours after the boring
b. Location of Boring
The boring locations were spread out over the whole project Site
Standard test was known as Standard Penetration Test. The purpose of the
2
THE JAKARTA FISHING PORT / MARKET DEVELOPMENT PROJECT WASKITA – DAITO JO.
PHASE IV PACKAGE III
METHOD STATEMENT 08
SOIL INVESTIGATION
TO RPS
This is had been carried following the ASTM Standard, with the
The test was done at every 2.0 m intervals up to the edge of each hole and at
any depth where subsoil change in character. The reading was recorded for
each 15 cm. Penetration for 3 x 15 cm (the first 15 cm was not used, only
The taking of thin Wall samples were meant to obtain the relatively original
samples is taken for each different kind layer to obtain optimum data.
The samples were taken by using thin wall tube samples, passed to the
Desired soil depth by using hydraulic pressure from the boring machine.
To check the disturbances of samples points natural soil condition (to avoid
cutting) the pocket penetrometers were done directly when the sample arrive
2. Laboratory Test
The testing procedure followed the ASTM standard 1985, namely as follows :
3
THE JAKARTA FISHING PORT / MARKET DEVELOPMENT PROJECT WASKITA – DAITO JO.
PHASE IV PACKAGE III
METHOD STATEMENT 08
SOIL INVESTIGATION
TO RPS
~ Unit weight
~ Specific gravity
~ Consolidation Test
transmittal.
3. Equipment
The following equipment were used for this work investigation are :
a. Field Equipment
~ SPT Apparatus
4
THE JAKARTA FISHING PORT / MARKET DEVELOPMENT PROJECT WASKITA – DAITO JO.
PHASE IV PACKAGE III
METHOD STATEMENT 08
SOIL INVESTIGATION
TO RPS
b. Laboratory Equipment
Farrance, British