ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
1 Shapoorji Blocks Fabrication 2nd Batch at Karimun 0% 45 days Thu 6/11/20 Sat 7/25/20 NA NA
2 PS1 2.561 tons
0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA 0%
3 Stool F71KA 0% 12 days Tue 6/9/20 Fri 6/19/20 NA NA 0%
4 Cutting& beveling preparation 0% 2 days Thu 6/11/20 Fri 6/12/20 NA NA 0%
5 Fitting joint Bracket to top plate 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
6 Fit up insp 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
7 Side A welding 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
8 Back gouging& grinding 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
9 Side B welding& grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
10 NDT 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
11 Fitting Bracket (4 nos) 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
12 Welding& grinding 0% 2 days Sat 6/20/20 Sun 6/21/20 NA NA 0%
13 Final inspec 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
14 Stool F72KA 0% 12 days Wed 6/10/20 Sat 6/20/20 NA NA 0%
15 Cutting& beveling preparation 0% 2 days Thu 6/11/20 Fri 6/12/20 NA NA 0%
16 Fitting joint Bracket to top plate 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
17 Fit up insp 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
18 Side A welding 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
19 Back gouging& grinding 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
20 Side B welding& grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
21 NDT 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
22 Fitting Bracket (4 nos) 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
23 Welding& grinding 0% 2 days Sat 6/20/20 Sun 6/21/20 NA NA 0%
24 Final inspec 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
25 Stool F73KA 0% 12 days Fri 6/12/20 Mon 6/22/20 NA NA 0%
26 Cutting& beveling preparation 0% 2 days? Sat 6/13/20 Sun 6/14/20 NA NA 0%
27 Fitting joint Bracket to top plate 0% 1 day? Mon 6/15/20 Mon 6/15/20 NA NA 0%
28 Fit up insp 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
29 Side A welding 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
30 Back gouging& grinding 0% 2 days? Wed 6/17/20 Thu 6/18/20 NA NA 0%
31 Side B welding& grinding 0% 2 days? Fri 6/19/20 Sat 6/20/20 NA NA 0%
32 NDT 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
33 Fitting Bracket (4 nos) 0% 1 day? Mon 6/22/20 Mon 6/22/20 NA NA 0%
34 Welding& grinding 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
35 Final inspec 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
36 Stool F73KB 0% 15 days Sun 6/14/20 Sat 6/27/20 NA NA 0%
37 Cutting& beveling preparation 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
38 Fitting joint Bracket to top plate 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
39 Fit up insp 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
40 Side A welding 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
41 Back gouging& grinding 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
42 Side B welding& grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
43 NDT 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
44 Fitting Bracket (6 nos) 0% 2 days Wed 6/24/20 Thu 6/25/20 NA NA 0%
45 Welding& grinding 0% 4 days Thu 6/25/20 Sun 6/28/20 NA NA 0%
46 Final inspec 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
47 Stool F74KA 0% 15 days Tue 6/16/20 Wed 7/1/20 NA NA 0%
48 Cutting& beveling preparation 0% 2 days Thu 6/18/20 Fri 6/19/20 NA NA 0%
49 Fitting joint Bracket to top plate 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
50 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
51 Side A welding 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
52 Back gouging& grinding 0% 2 days Mon 6/22/20 Tue 6/23/20 NA NA 0%
53 Side B welding& grinding 0% 2 days Wed 6/24/20 Thu 6/25/20 NA NA 0%
54 NDT 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
55 Fitting Bracket (6 nos) 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
56 Welding& grinding 0% 4 days Sun 6/28/20 Wed 7/1/20 NA NA 0%
57 Final inspec 0% 1 day Thu 7/2/20 Thu 7/2/20 NA NA 0%
58 Stool F74KB 0% 15 days Thu 6/18/20 Fri 7/3/20 NA NA 0%
59 Cutting& beveling preparation 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
60 Fitting joint Bracket to top plate 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
61 Fit up insp 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
62 Side A welding 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
63 Back gouging& grinding 0% 2 days Thu 6/25/20 Fri 6/26/20 NA NA 0%
64 Side B welding& grinding 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
65 NDT 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
66 Fitting Bracket (6 nos) 0% 2 days Tue 6/30/20 Wed 7/1/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 1
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
67 Welding& grinding 0% 4 days Wed 7/1/20 Sat 7/4/20 NA NA 0%
68 Final inspec 0% 1 day Sun 7/5/20 Sun 7/5/20 NA NA 0%
69 Stool F75KA 0% 14 days Sat 6/20/20 Sat 7/4/20 NA NA 0%
70 Cutting& beveling preparation 0% 2 days Tue 6/23/20 Wed 6/24/20 NA NA 0%
71 Fitting joint Bracket to top plate 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
72 Fit up insp 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
73 Side A welding 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
74 Back gouging& grinding 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
75 Side B welding& grinding 0% 2 days Mon 6/29/20 Tue 6/30/20 NA NA 0%
76 NDT 0% 1 day Wed 7/1/20 Wed 7/1/20 NA NA 0%
77 Fitting Bracket (4 nos) 0% 2 days Thu 7/2/20 Fri 7/3/20 NA NA 0%
78 Welding& grinding 0% 3 days Fri 7/3/20 Sun 7/5/20 NA NA 0%
79 Final inspec 0% 1 day Mon 7/6/20 Mon 7/6/20 NA NA 0%
80 Stool F76KA 0% 15 days Mon 6/22/20 Mon 7/6/20 NA NA 0%
81 Cutting& beveling preparation 0% 2 days Fri 6/26/20 Sat 6/27/20 NA NA 0%
82 Fitting joint Bracket to top plate 0% 1 day Sun 6/28/20 Sun 6/28/20 NA NA 0%
83 Fit up insp 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
84 Side A welding 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
85 Back gouging& grinding 0% 2 days Tue 6/30/20 Wed 7/1/20 NA NA 0%
86 Side B welding& grinding 0% 2 days Thu 7/2/20 Fri 7/3/20 NA NA 0%
87 NDT 0% 1 day Sat 7/4/20 Sat 7/4/20 NA NA 0%
88 Fitting Bracket (4 nos) 0% 1 day Sun 7/5/20 Sun 7/5/20 NA NA 0%
89 Welding& grinding 0% 4 days Mon 7/6/20 Thu 7/9/20 NA NA 0%
90 Final inspec 0% 1 day Fri 7/10/20 Fri 7/10/20 NA NA 0%
91 PS1A 2.561 tons
0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA
92 Stool F64KA 0% 12 days Thu 6/11/20 Mon 6/22/20 NA NA
93 Cutting&beveling preparation 0% 2 days Thu 6/11/20 Fri 6/12/20 NA NA 0%
94 Fitting joint Bracket to top plate 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
95 Fit up insp 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
96 Side A welding 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
97 Back gouging&grinding 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
98 Side B welding&grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
99 NDT 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
100 Fitting Bracket (4 nos) 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
101 Welding&grinding 0% 2 days Sat 6/20/20 Sun 6/21/20 NA NA 0%
102 Final inspec 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
103 Stool F65KA 0% 12 days Thu 6/11/20 Mon 6/22/20 NA NA
104 Cutting&beveling preparation 0% 2 days Thu 6/11/20 Fri 6/12/20 NA NA 0%
105 Fitting joint Bracket to top plate 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
106 Fit up insp 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
107 Side A welding 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
108 Back gouging&grinding 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
109 Side B welding&grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
110 NDT 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
111 Fitting Bracket (4 nos) 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
112 Welding&grinding 0% 2 days Sat 6/20/20 Sun 6/21/20 NA NA 0%
113 Final inspec 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
114 Stool F66KA 0% 12 days Sat 6/13/20 Wed 6/24/20 NA NA
115 Cutting&beveling preparation 0% 2 days? Sat 6/13/20 Sun 6/14/20 NA NA 0%
116 Fitting joint Bracket to top plate 0% 1 day? Mon 6/15/20 Mon 6/15/20 NA NA 0%
117 Fit up insp 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
118 Side A welding 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
119 Back gouging&grinding 0% 2 days? Wed 6/17/20 Thu 6/18/20 NA NA 0%
120 Side B welding&grinding 0% 2 days? Fri 6/19/20 Sat 6/20/20 NA NA 0%
121 NDT 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
122 Fitting Bracket (4 nos) 0% 1 day? Mon 6/22/20 Mon 6/22/20 NA NA 0%
123 Welding&grinding 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
124 Final inspec 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
125 Stool F67KA 0% 15 days Mon 6/15/20 Mon 6/29/20 NA NA
126 Cutting&beveling preparation 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
127 Fitting joint Bracket to top plate 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
128 Fit up insp 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
129 Side A welding 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
130 Back gouging&grinding 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
131 Side B welding&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
132 NDT 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 2
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
133 Fitting Bracket (6 nos) 0% 2 days Wed 6/24/20 Thu 6/25/20 NA NA 0%
134 Welding&grinding 0% 4 days Thu 6/25/20 Sun 6/28/20 NA NA 0%
135 Final inspec 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
136 Stool F67KB 0% 15 days Thu 6/18/20 Thu 7/2/20 NA NA
137 Cutting&beveling preparation 0% 2 days Thu 6/18/20 Fri 6/19/20 NA NA 0%
138 Fitting joint Bracket to top plate 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
139 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
140 Side A welding 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
141 Back gouging&grinding 0% 2 days Mon 6/22/20 Tue 6/23/20 NA NA 0%
142 Side B welding&grinding 0% 2 days Wed 6/24/20 Thu 6/25/20 NA NA 0%
143 NDT 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
144 Fitting Bracket (6 nos) 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
145 Welding&grinding 0% 4 days Sun 6/28/20 Wed 7/1/20 NA NA 0%
146 Final inspec 0% 1 day Thu 7/2/20 Thu 7/2/20 NA NA 0%
147 Stool F68KA 0% 15 days Sun 6/21/20 Sun 7/5/20 NA NA
148 Cutting&beveling preparation 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
149 Fitting joint Bracket to top plate 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
150 Fit up insp 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
151 Side A welding 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
152 Back gouging&grinding 0% 2 days Thu 6/25/20 Fri 6/26/20 NA NA 0%
153 Side B welding&grinding 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
154 NDT 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
155 Fitting Bracket (6 nos) 0% 2 days Tue 6/30/20 Wed 7/1/20 NA NA 0%
156 Welding&grinding 0% 4 days Wed 7/1/20 Sat 7/4/20 NA NA 0%
157 Final inspec 0% 1 day Sun 7/5/20 Sun 7/5/20 NA NA 0%
158 Stool F68KB 0% 14 days Tue 6/23/20 Mon 7/6/20 NA NA
159 Cutting&beveling preparation 0% 2 days Tue 6/23/20 Wed 6/24/20 NA NA 0%
160 Fitting joint Bracket to top plate 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
161 Fit up insp 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
162 Side A welding 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
163 Back gouging&grinding 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
164 Side B welding&grinding 0% 2 days Mon 6/29/20 Tue 6/30/20 NA NA 0%
165 NDT 0% 1 day Wed 7/1/20 Wed 7/1/20 NA NA 0%
166 Fitting Bracket (6 nos) 0% 2 days Thu 7/2/20 Fri 7/3/20 NA NA 0%
167 Welding&grinding 0% 3 days Fri 7/3/20 Sun 7/5/20 NA NA 0%
168 Final inspec 0% 1 day Mon 7/6/20 Mon 7/6/20 NA NA 0%
169 Stool F69KA 0% 15 days Fri 6/26/20 Fri 7/10/20 NA NA
170 Cutting&beveling preparation 0% 2 days Fri 6/26/20 Sat 6/27/20 NA NA 0%
171 Fitting joint Bracket to top plate 0% 1 day Sun 6/28/20 Sun 6/28/20 NA NA 0%
172 Fit up insp 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
173 Side A welding 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
174 Back gouging&grinding 0% 2 days Tue 6/30/20 Wed 7/1/20 NA NA 0%
175 Side B welding&grinding 0% 2 days Thu 7/2/20 Fri 7/3/20 NA NA 0%
176 NDT 0% 1 day Sat 7/4/20 Sat 7/4/20 NA NA 0%
177 Fitting Bracket (4 nos) 0% 1 day Sun 7/5/20 Sun 7/5/20 NA NA 0%
178 Welding&grinding 0% 4 days Mon 7/6/20 Thu 7/9/20 NA NA 0%
179 Final inspec 0% 1 day Fri 7/10/20 Fri 7/10/20 NA NA 0%
180 Stool F70KA 0% 15 days Fri 6/26/20 Fri 7/10/20 NA NA 0%
181 Cutting&beveling preparation 0% 2 days? Fri 6/26/20 Sat 6/27/20 NA NA 0%
182 Fitting joint Bracket to top plate 0% 1 day? Sun 6/28/20 Sun 6/28/20 NA NA 0%
183 Fit up insp 0% 1 day? Mon 6/29/20 Mon 6/29/20 NA NA 0%
184 Side A welding 0% 1 day? Mon 6/29/20 Mon 6/29/20 NA NA 0%
185 Back gouging&grinding 0% 2 days? Tue 6/30/20 Wed 7/1/20 NA NA 0%
186 Side B welding&grinding 0% 2 days? Thu 7/2/20 Fri 7/3/20 NA NA 0%
187 NDT 0% 1 day? Sat 7/4/20 Sat 7/4/20 NA NA 0%
188 Fitting Bracket (4 nos) 0% 1 day? Sun 7/5/20 Sun 7/5/20 NA NA 0%
189 Welding&grinding 0% 4 days? Mon 7/6/20 Thu 7/9/20 NA NA 0%
190 Final inspec 0% 1 day? Fri 7/10/20 Fri 7/10/20 NA NA 0%
191 <New Task> 0% NA NA NA NA
192 <New Task> 0% NA NA NA NA
193 PS2 3.596 tons
0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA
194 Stool F77KA 0% 12 days Thu 6/11/20 Mon 6/22/20 NA NA
195 Cutting&beveling preparation 0% 2 days Thu 6/11/20 Fri 6/12/20 NA NA 0%
196 Fitting joint Bracket to top plate 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
197 Fit up insp 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
198 Side A welding 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 3
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
199 Back gouging&grinding 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
200 Side B welding&grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
201 NDT 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
202 Fitting Bracket (4 nos) 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
203 Welding&grinding 0% 2 days Sat 6/20/20 Sun 6/21/20 NA NA 0%
204 Final inspec 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
205 Stool F77KB 0% 12 days Thu 6/11/20 Mon 6/22/20 NA NA
206 Cutting&beveling preparation 0% 2 days Thu 6/11/20 Fri 6/12/20 NA NA 0%
207 Fitting joint Bracket to top plate 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
208 Fit up insp 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
209 Side A welding 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
210 Back gouging&grinding 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
211 Side B welding&grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
212 NDT 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
213 Fitting Bracket (4 nos) 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
214 Welding&grinding 0% 2 days Sat 6/20/20 Sun 6/21/20 NA NA 0%
215 Final inspec 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
216 Stool F78KA 0% 12 days Sat 6/13/20 Wed 6/24/20 NA NA
217 Cutting&beveling preparation 0% 2 days? Sat 6/13/20 Sun 6/14/20 NA NA 0%
218 Fitting joint Bracket to top plate 0% 1 day? Mon 6/15/20 Mon 6/15/20 NA NA 0%
219 Fit up insp 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
220 Side A welding 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
221 Back gouging&grinding 0% 2 days? Wed 6/17/20 Thu 6/18/20 NA NA 0%
222 Side B welding&grinding 0% 2 days? Fri 6/19/20 Sat 6/20/20 NA NA 0%
223 NDT 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
224 Fitting Bracket (4 nos) 0% 1 day? Mon 6/22/20 Mon 6/22/20 NA NA 0%
225 Welding&grinding 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
226 Final inspec 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
227 Stool F78KB 0% 12 days Mon 6/15/20 Fri 6/26/20 NA NA
228 Cutting&beveling preparation 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
229 Fitting joint Bracket to top plate 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
230 Fit up insp 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
231 Side A welding 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
232 Back gouging&grinding 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
233 Side B welding&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
234 NDT 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
235 Fitting Bracket (4nos) 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
236 Welding&grinding 0% 2 days Wed 6/24/20 Thu 6/25/20 NA NA 0%
237 Final inspec 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
238 Stool F79KA 0% 12 days Mon 6/15/20 Fri 6/26/20 NA NA
239 Cutting&beveling preparation 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
240 Fitting joint Bracket to top plate 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
241 Fit up insp 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
242 Side A welding 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
243 Back gouging&grinding 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
244 Side B welding&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
245 NDT 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
246 Fitting Bracket (4 nos) 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
247 Welding&grinding 0% 2 days Wed 6/24/20 Thu 6/25/20 NA NA 0%
248 Final inspec 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
249 Stool F79KB 0% 12 days Wed 6/17/20 Sun 6/28/20 NA NA
250 Cutting&beveling preparation 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
251 Fitting joint Bracket to top plate 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
252 Fit up insp 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
253 Side A welding 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
254 Back gouging&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
255 Side B welding&grinding 0% 2 days Tue 6/23/20 Wed 6/24/20 NA NA 0%
256 NDT 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
257 Fitting Bracket (4 nos) 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
258 Welding&grinding 0% 2 days Fri 6/26/20 Sat 6/27/20 NA NA 0%
259 Final inspec 0% 1 day Sun 6/28/20 Sun 6/28/20 NA NA 0%
260 Stool F80KA 0% 14 days Fri 6/19/20 Thu 7/2/20 NA NA
261 Cutting&beveling preparation 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
262 Fitting joint Bracket to top plate 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
263 Fit up insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
264 Side A welding 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 4
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
265 Back gouging&grinding 0% 2 days Tue 6/23/20 Wed 6/24/20 NA NA 0%
266 Side B welding&grinding 0% 2 days Thu 6/25/20 Fri 6/26/20 NA NA 0%
267 NDT 0% 1 day Sat 6/27/20 Sat 6/27/20 NA NA 0%
268 Fitting Bracket (6 nos) 0% 1 day Sun 6/28/20 Sun 6/28/20 NA NA 0%
269 Welding&grinding 0% 3 days Mon 6/29/20 Wed 7/1/20 NA NA 0%
270 Final inspec 0% 1 day Thu 7/2/20 Thu 7/2/20 NA NA 0%
271 Stool F80KB 0% 14 days Sun 6/21/20 Sat 7/4/20 NA NA
272 Cutting&beveling preparation 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
273 Fitting joint Bracket to top plate 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
274 Fit up insp 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
275 Side A welding 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
276 Back gouging&grinding 0% 2 days Thu 6/25/20 Fri 6/26/20 NA NA 0%
277 Side B welding&grinding 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
278 NDT 0% 1 day Mon 6/29/20 Mon 6/29/20 NA NA 0%
279 Fitting Bracket (6 nos) 0% 1 day Tue 6/30/20 Tue 6/30/20 NA NA 0%
280 Welding&grinding 0% 3 days Wed 7/1/20 Fri 7/3/20 NA NA 0%
281 Final inspec 0% 1 day Sat 7/4/20 Sat 7/4/20 NA NA 0%
282 Stool F81KA 0% 13 days? Tue 6/23/20 Sun 7/5/20 NA NA
283 Cutting&beveling preparation 0% 2 days? Tue 6/23/20 Wed 6/24/20 NA NA 0%
284 Fitting joint Bracket to top plate 0% 1 day? Thu 6/25/20 Thu 6/25/20 NA NA 0%
285 Fit up insp 0% 1 day? Fri 6/26/20 Fri 6/26/20 NA NA 0%
286 Side A welding 0% 1 day? Fri 6/26/20 Fri 6/26/20 NA NA 0%
287 Back gouging&grinding 0% 2 days? Sat 6/27/20 Sun 6/28/20 NA NA 0%
288 Side B welding&grinding 0% 2 days? Mon 6/29/20 Tue 6/30/20 NA NA 0%
289 NDT 0% 1 day? Wed 7/1/20 Wed 7/1/20 NA NA 0%
290 Fitting Bracket (4 nos) 0% 1 day? Thu 7/2/20 Thu 7/2/20 NA NA 0%
291 Welding&grinding 0% 2 days? Fri 7/3/20 Sat 7/4/20 NA NA 0%
292 Final inspec 0% 1 day? Sun 7/5/20 Sun 7/5/20 NA NA 0%
293 Stool F81KB 0% 12 days Thu 6/25/20 Mon 7/6/20 NA NA
294 Cutting&beveling preparation 0% 2 days Thu 6/25/20 Fri 6/26/20 NA NA 0%
295 Fitting joint Bracket to top plate 0% 1 day Sat 6/27/20 Sat 6/27/20 NA NA 0%
296 Fit up insp 0% 1 day Sun 6/28/20 Sun 6/28/20 NA NA 0%
297 Side A welding 0% 1 day Sun 6/28/20 Sun 6/28/20 NA NA 0%
298 Back gouging&grinding 0% 2 days Mon 6/29/20 Tue 6/30/20 NA NA 0%
299 Side B welding&grinding 0% 2 days Wed 7/1/20 Thu 7/2/20 NA NA 0%
300 NDT 0% 1 day Fri 7/3/20 Fri 7/3/20 NA NA 0%
301 Fitting Bracket (4nos) 0% 1 day Sat 7/4/20 Sat 7/4/20 NA NA 0%
302 Welding&grinding 0% 2 days Sun 7/5/20 Mon 7/6/20 NA NA 0%
303 Final inspec 0% 1 day Tue 7/7/20 Tue 7/7/20 NA NA 0%
304 Stool F82KA 0% 13 days Sun 6/28/20 Fri 7/10/20 NA NA
305 Cutting&beveling preparation 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
306 Fitting joint Bracket to top plate 0% 1 day Tue 6/30/20 Tue 6/30/20 NA NA 0%
307 Fit up insp 0% 1 day Wed 7/1/20 Wed 7/1/20 NA NA 0%
308 Side A welding 0% 1 day Wed 7/1/20 Wed 7/1/20 NA NA 0%
309 Back gouging&grinding 0% 2 days Thu 7/2/20 Fri 7/3/20 NA NA 0%
310 Side B welding&grinding 0% 2 days Sat 7/4/20 Sun 7/5/20 NA NA 0%
311 NDT 0% 1 day Mon 7/6/20 Mon 7/6/20 NA NA 0%
312 Fitting Bracket (4 nos) 0% 1 day Tue 7/7/20 Tue 7/7/20 NA NA 0%
313 Welding&grinding 0% 2 days Wed 7/8/20 Thu 7/9/20 NA NA 0%
314 Final inspec 0% 1 day Fri 7/10/20 Fri 7/10/20 NA NA 0%
315 Stool F82KB 0% 13 days? Sun 6/28/20 Fri 7/10/20 NA NA
316 Cutting&beveling preparation 0% 2 days? Sun 6/28/20 Mon 6/29/20 NA NA 0%
317 Fitting joint Bracket to top plate 0% 1 day? Tue 6/30/20 Tue 6/30/20 NA NA 0%
318 Fit up insp 0% 1 day? Wed 7/1/20 Wed 7/1/20 NA NA 0%
319 Side A welding 0% 1 day? Wed 7/1/20 Wed 7/1/20 NA NA 0%
320 Back gouging&grinding 0% 2 days? Thu 7/2/20 Fri 7/3/20 NA NA 0%
321 Side B welding&grinding 0% 2 days? Sat 7/4/20 Sun 7/5/20 NA NA 0%
322 NDT 0% 1 day? Mon 7/6/20 Mon 7/6/20 NA NA 0%
323 Fitting Bracket (4 nos) 0% 1 day? Tue 7/7/20 Tue 7/7/20 NA NA 0%
324 Welding&grinding 0% 2 days? Wed 7/8/20 Thu 7/9/20 NA NA 0%
325 Final inspec 0% 1 day? Fri 7/10/20 Fri 7/10/20 NA NA 0%
326 LQ Block QAP 61.357 tons
0% 45 days Thu 6/11/20 Sat 7/25/20 NA NA 0%
327 QAP Sub Block 1 0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA
328 Block Sub Assembly 0% 30 days Thu 6/11/20 Tue 6/30/20 NA NA 0%
329 Fab. Deck @33691 ABL Sub block 1 0% 20 days Thu 6/11/20 Thu 6/11/20 NA NA 0%
330 Fabrication Deck girder 0% 9 days Thu 6/11/20 Fri 6/19/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 5
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
333 Joint fitting deck plate sub block 1 0% 2 days Thu 6/11/20 Fri 6/12/20 NA NA 0%
334 Take dimention&inspec fit up joint 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
335 Welding unimeld joint plate, side A 0% 3 days Sat 6/13/20 Mon 6/15/20 NA NA 0%
336 Marking&take deck dimension 0% 1 day Mon 6/15/20 Mon 6/15/20 NA NA 0%
337 Fitting deck AB stiffener&girder 0% 3 days Tue 6/16/20 Thu 6/18/20 NA NA 0%
338 Fit up insp 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
339 Weld deck stiffeners 0% 4 days Fri 6/19/20 Mon 6/22/20 NA NA 0%
340 Flip over to unimeld side B joint plate 0% 3 days? Tue 6/23/20 Thu 6/25/20 NA NA 0%
341 Turn Back to side A and panel putl on the JIG 0% 2 days? Fri 6/26/20 Sat 6/27/20 NA NA 0%
342 Grinding&touch up weld deck stiffeners 0% 3 days Sat 6/27/20 Mon 6/29/20 NA NA 0%
343 Deck @42135 ABL Panel insp 0% 1 day Tue 6/30/20 Tue 6/30/20 NA NA 0%
344 Fab Longi 17200 off C.L (PORT) 0% 9 days Sat 6/13/20 Sun 6/21/20 NA NA
345 fitting joint plate 0% 1 day Sat 6/13/20 Sat 6/13/20 NA NA 0%
346 Fit up insp 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
347 Unimeld joint plate side A 0% 2 days Sun 6/14/20 Mon 6/15/20 NA NA 0%
348 Marking & fitting longi stiffeners 0% 2 days Mon 6/15/20 Tue 6/16/20 NA NA 0%
349 Fit up insp 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
350 Weld&grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
351 Flip over to side B and weld joint plate 0% 2 days? Fri 6/19/20 Sat 6/20/20 NA NA 0%
352 Panel longi insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
353 Fab. Trans Fr.35 0% 6 days Mon 6/15/20 Sat 6/20/20 NA NA
354 Joint plate side A 0% 1 day Mon 6/15/20 Mon 6/15/20 NA NA 0%
355 Fitting stiffeners 0% 1 day Tue 6/16/20 Tue 6/16/20 NA NA 0%
356 Fit up insp 0% 1 day Tue 6/16/20 Tue 6/16/20 NA NA 0%
357 Wled&grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
358 Joint plate side B 0% 1 day? Fri 6/19/20 Fri 6/19/20 NA NA 0%
359 Panel Fr.35 insp 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
360 Fab. Fr.43+600 0% 3 days Tue 6/16/20 Thu 6/18/20 NA NA
361 Fitting stiffeners 0% 1 day Tue 6/16/20 Tue 6/16/20 NA NA 0%
362 Fit up insp 0% 1 day Tue 6/16/20 Tue 6/16/20 NA NA 0%
363 Welding & grinding 0% 2 days Wed 6/17/20 Thu 6/18/20 NA NA 0%
364 Panel insp 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
365 Fab. Fr.47 0% 7 days Tue 6/16/20 Mon 6/22/20 NA NA
366 Joint plate side A 0% 2 days Tue 6/16/20 Wed 6/17/20 NA NA 0%
367 Fitting stiffeners 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
368 Fit up insp 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
369 Wled&grinding stiffeners 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
370 Joint plate side B 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
371 Panel Fr.47 insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
372 Fab. Fr.48+300 0% 7 days Thu 6/18/20 Wed 6/24/20 NA NA 0%
373 Joint plate side A 0% 2 days Thu 6/18/20 Fri 6/19/20 NA NA 0%
374 Fitting stiffeners 0% 1 day? Sat 6/20/20 Sat 6/20/20 NA NA 0%
375 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
376 Wled&grinding stiffeners 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
377 Joint plate side B 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
378 Panel Fr.48+300 insp 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
379 Panel Fr.55 insp 0% 7 days Thu 6/18/20 Wed 6/24/20 NA NA
380 Joint plate side A 0% 2 days? Thu 6/18/20 Fri 6/19/20 NA NA 0%
381 Fitting stiffeners 0% 1 day? Sat 6/20/20 Sat 6/20/20 NA NA 0%
382 Fit up insp 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
383 Wled&grinding stiffeners 0% 2 days? Sun 6/21/20 Mon 6/22/20 NA NA 0%
384 Joint plate side B 0% 1 day? Tue 6/23/20 Tue 6/23/20 NA NA 0%
385 Panel Fr.55 insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
386 Fab. Longi 12040 off C L (port) 0% 5 days Fri 6/19/20 Tue 6/23/20 NA NA
387 Joint plate side A 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
388 Fitting stiffeners 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
389 Fit up insp 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
390 Wled&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
391 Joint plate side B 0% 1 day? Mon 6/22/20 Mon 6/22/20 NA NA 0%
392 Panel insp 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
393 Fab. Longi 15200 off C L (port) 0% 5 days Fri 6/19/20 Tue 6/23/20 NA NA
394 Joint plate side A 0% 1 day Fri 6/19/20 Fri 6/19/20 NA NA 0%
395 Fitting stiffeners 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
396 Fit up insp 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
397 Wled&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
398 Joint plate side B 0% 1 day? Mon 6/22/20 Mon 6/22/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 6
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
399 Panel insp 0% 1 day Tue 6/23/20 Tue 6/23/20 NA NA 0%
400 Fab Longi 16340 of CL 0% 1 day Mon 6/22/20 Tue 6/23/20 NA NA 0%
401 Block Assembly 0% 15 days Fri 6/26/20 Fri 7/10/20 NA NA
402 JIG preparation 0% 2 days Fri 6/26/20 Sat 6/27/20 NA NA 0%
403 deck @33691 ABL setting on the JIG 0% 2 days Fri 6/26/20 Sat 6/27/20 NA NA 0%
404 Fitting Longi 17200 off C.L 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
405 Fitting Fr.35 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
406 Fitting Fr.43+300 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
407 Fitting Fr.47 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
408 Fitting Fr.48+300 0% 2 days Mon 6/29/20 Tue 6/30/20 NA NA 0%
409 Fitting Fr.55 0% 2 days? Mon 6/29/20 Tue 6/30/20 NA NA 0%
410 Fitting longi 12040 & 15200 off CL port 0% 2 days Mon 6/29/20 Tue 6/30/20 NA NA 0%
411 Fitting Longi 16340 off CL 0% 2 days? Tue 6/30/20 Wed 7/1/20 NA NA 0%
412 Fitt up dimention overall block 0% 1 day Thu 7/2/20 Thu 7/2/20 NA NA 0%
413 Welding&grinding block 0% 4 days Thu 7/2/20 Sun 7/5/20 NA NA 0%
414 Install lifting eye lug 0% 2 days Sat 7/4/20 Sun 7/5/20 NA NA 0%
415 Line fairing 0% 4 days Sat 7/4/20 Tue 7/7/20 NA NA 0%
416 NDT 0% 4 days Sun 7/5/20 Wed 7/8/20 NA NA 0%
417 Block Final insp 0% 2 days Thu 7/9/20 Fri 7/10/20 NA NA 0%
418 QAP Sub Block 2 0% 24 days Mon 6/29/20 Wed 7/22/20 NA NA
419 Joint fitting deck plate @33691 ABL sub block 2 0% 2 days? Mon 6/29/20 Tue 6/30/20 NA NA 0%
420 Take dimention&inspec fit up joint 0% 1 day? Wed 7/1/20 Wed 7/1/20 NA NA 0%
421 Welding unimeld joint plate, side A 0% 3 days? Wed 7/1/20 Fri 7/3/20 NA NA 0%
422 Marking&take deck dimension 0% 1 day? Fri 7/3/20 Fri 7/3/20 NA NA 0%
423 Fitting deck AB stiffener&girder 0% 4 days? Sat 7/4/20 Tue 7/7/20 NA NA 0%
424 Fit up insp 0% 1 day? Wed 7/8/20 Wed 7/8/20 NA NA 0%
425 Weld deck stiffeners 0% 5 days? Wed 7/8/20 Sun 7/12/20 NA NA 0%
426 Flip over to unimeld side B joint plate 0% 4 days? Mon 7/13/20 Thu 7/16/20 NA NA 0%
427 Turn Back to side A and panel putl on the JIG 0% 1 day? Fri 7/17/20 Fri 7/17/20 NA NA 0%
428 Install pillar H beam 0% 3 days Sun 7/19/20 Tue 7/21/20 NA NA 0%
429 Grinding&touch up weld deck stiffeners 0% 5 days? Fri 7/17/20 Tue 7/21/20 NA NA 0%
430 Deck @333691 ABL Panel insp 0% 1 day Wed 7/22/20 Wed 7/22/20 NA NA 0%
431 Fab. Loose Panel Sub block 3 0% 7 days Sun 7/19/20 Sat 7/25/20 NA NA 0%
432 LQ Block QBP 27.159 tons
0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA
433 Block Sub Assembly 0% 21 days Thu 6/11/20 Wed 7/1/20 NA NA
434 Fab. Deck @36491 ABL 0% 20 days Thu 6/11/20 Tue 6/30/20 NA NA
435 Fabrication Deck girder 0% 6 days Thu 6/11/20 Tue 6/16/20 NA NA
436 Fitting T girder 0% 3 days? Thu 6/11/20 Sat 6/13/20 NA NA 0%
437 Weld&grinding T girder 0% 5 days? Fri 6/12/20 Tue 6/16/20 NA NA 0%
438 Joint fitting deck plate 0% 3 days? Thu 6/11/20 Sat 6/13/20 NA NA 0%
439 Take dimention&inspec fit up joint 0% 1 day? Sun 6/14/20 Sun 6/14/20 NA NA 0%
440 Welding unimeld joint plate,side A 0% 3 days? Sun 6/14/20 Tue 6/16/20 NA NA 0%
441 Marking&take deck dimension 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
442 Fittingdeck AB stiffener&girder 0% 4 days? Wed 6/17/20 Sat 6/20/20 NA NA 0%
443 Fit up insp 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
444 Weld deck stiffeners 0% 4 days? Sun 6/21/20 Wed 6/24/20 NA NA 0%
445 Flip over deck @36491 ABL to side B weld 0% 2 days? Thu 6/25/20 Fri 6/26/20 NA NA 0%
446 Turn back to side A and Setting on the JIG with 0% 4 days? Sat 6/27/20 Tue 6/30/20 NA NA 0%
Weld&grind
447 Deck @42135 ABL Panel insp 0% 1 day? Wed 7/1/20 Wed 7/1/20 NA NA 0%
448 Fab Longi 17200 off C.L (PORT) 0% 11 days Sun 6/14/20 Wed 6/24/20 NA NA
449 fitting joint plate 0% 2 days? Sun 6/14/20 Mon 6/15/20 NA NA 0%
450 Fit up insp 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
451 Unimeld joint weld plate side A weld 0% 2 days? Tue 6/16/20 Wed 6/17/20 NA NA 0%
452 Marking&fitting longi stiffeners 0% 2 days? Thu 6/18/20 Fri 6/19/20 NA NA 0%
453 Fit up insp 0% 1 day? Fri 6/19/20 Fri 6/19/20 NA NA 0%
454 Weld&grinding 0% 3 days? Fri 6/19/20 Sun 6/21/20 NA NA 0%
455 Flip over and side B weld 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
456 Panel longi insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
457 Fab. Fr.44 - 300 0% 3 days Mon 6/22/20 Wed 6/24/20 NA NA 0%
458 Fab. Fr.47 0% 3 days Mon 6/22/20 Wed 6/24/20 NA NA 0%
459 Fab. Fr.55 0% 8 days Thu 6/18/20 Thu 6/25/20 NA NA
460 Joint plate side A weld 0% 2 days Thu 6/18/20 Fri 6/19/20 NA NA 0%
461 Fitting stiffeners 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
462 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
463 Wled&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
464 Flip over and side B weld 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 7
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
465 Panel Fr.55 insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
466 Panel Fr.48+300 0% 7 days Thu 6/18/20 Wed 6/24/20 NA NA
467 Joint plate side A weld 0% 2 days? Thu 6/18/20 Fri 6/19/20 NA NA 0%
468 Fitting stiffeners 0% 1 day? Sat 6/20/20 Sat 6/20/20 NA NA 0%
469 Fit up insp 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
470 Wled&grinding 0% 2 days? Sun 6/21/20 Mon 6/22/20 NA NA 0%
471 Flip over and side B weld 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
472 Panel Fr.55 insp 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
473 Fab. Longi 12400 off C L (port) 0% 6 days Sat 6/20/20 Thu 6/25/20 NA NA
474 Joint plate side A weld 0% 2 days? Sat 6/20/20 Sun 6/21/20 NA NA 0%
475 Fitting stiffeners 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
476 Fit up insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
477 Wled&grinding 0% 2 days Mon 6/22/20 Tue 6/23/20 NA NA 0%
478 Flip over and side B weld 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
479 Panel insp 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
480 Fab. Longi 15200 off C L (port) 0% 6 days Sat 6/20/20 Thu 6/25/20 NA NA
481 Joint plate side A weld 0% 2 days? Sat 6/20/20 Sun 6/21/20 NA NA 0%
482 Fitting stiffeners 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
483 Fit up insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
484 Wled&grinding 0% 2 days Mon 6/22/20 Tue 6/23/20 NA NA 0%
485 Flip over and side B weld 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
486 Panel insp 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
487 Block Assembly 0% 17 days Sat 6/27/20 Mon 7/13/20 NA NA
488 JIG preparation 0% 1 day? Sat 6/27/20 Sat 6/27/20 NA NA 0%
489 deck @33691 ABL setting on the JIG 0% 4 days? Sat 6/27/20 Tue 6/30/20 NA NA 0%
490 Fitting Longi 17200 off C.L 0% 2 days? Tue 6/30/20 Wed 7/1/20 NA NA 0%
491 Fitting Fr.37 0% 2 days? Wed 7/1/20 Thu 7/2/20 NA NA 0%
492 Fitting Fr.47 0% 2 days? Wed 7/1/20 Thu 7/2/20 NA NA 0%
493 Fitting Fr.48 0% 2 days? Wed 7/1/20 Thu 7/2/20 NA NA 0%
494 Fitting Fr.55 0% 2 days? Thu 7/2/20 Fri 7/3/20 NA NA 0%
495 Fitting longi 12040&15200 off CL port 0% 2 days? Thu 7/2/20 Fri 7/3/20 NA NA 0%
496 Install pipe pillars 0% 1 day? Fri 7/3/20 Fri 7/3/20 NA NA 0%
497 Fitt up dimention overall block 0% 1 day? Sat 7/4/20 Sat 7/4/20 NA NA 0%
498 Welding&grinding block 0% 4 days? Sat 7/4/20 Tue 7/7/20 NA NA 0%
499 Install lifting eye lug 0% 2 days? Mon 7/6/20 Tue 7/7/20 NA NA 0%
500 Line fairing 0% 2 days? Tue 7/7/20 Wed 7/8/20 NA NA 0%
501 NDT 0% 2 days? Thu 7/9/20 Fri 7/10/20 NA NA 0%
502 Block Final insp 0% 1 day? Fri 7/10/20 Fri 7/10/20 NA NA 0%
503 LQ Block QBS 32.403tons
0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA
504 Block Sub Assembly 0% 21 days Thu 6/11/20 Wed 7/1/20 NA NA
505 Fab. Deck @36491 ABL (STBD) 0% 20 days Thu 6/11/20 Tue 6/30/20 NA NA
506 Fabrication Deck girder 0% 6 days Thu 6/11/20 Tue 6/16/20 NA NA
507 Fitting T girder 0% 3 days? Thu 6/11/20 Sat 6/13/20 NA NA 0%
508 Weld&grinding T girder 0% 5 days? Fri 6/12/20 Tue 6/16/20 NA NA 0%
509 Joint fitting deck plate 0% 3 days? Thu 6/11/20 Sat 6/13/20 NA NA 0%
510 Take dimention&inspec fit up joint 0% 1 day? Sun 6/14/20 Sun 6/14/20 NA NA 0%
511 Welding unimeld joint plate,side A 0% 3 days? Sun 6/14/20 Tue 6/16/20 NA NA 0%
512 Marking&take deck dimension 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
513 Fittingdeck AB stiffener&girder 0% 4 days? Wed 6/17/20 Sat 6/20/20 NA NA 0%
514 Fit up insp 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
515 Weld deck stiffeners 0% 4 days? Sun 6/21/20 Wed 6/24/20 NA NA 0%
516 Flip over deck @36491 ABL to side B weld 0% 2 days? Thu 6/25/20 Fri 6/26/20 NA NA 0%
517 Turn back to side A and Setting on the JIG with Weld&grind 0% 4 days? Sat 6/27/20 Tue 6/30/20 NA NA 0%
518 Deck @42135 ABL Panel insp 0% 1 day? Wed 7/1/20 Wed 7/1/20 NA NA 0%
519 Fab Longi 17200 off C.L (STBD) 0% 11 days Sun 6/14/20 Wed 6/24/20 NA NA
520 fitting joint plate 0% 2 days? Sun 6/14/20 Mon 6/15/20 NA NA 0%
521 Fit up insp 0% 1 day? Tue 6/16/20 Tue 6/16/20 NA NA 0%
522 Unimeld joint weld plate side A weld 0% 2 days? Tue 6/16/20 Wed 6/17/20 NA NA 0%
523 Marking&fitting longi stiffeners 0% 2 days? Thu 6/18/20 Fri 6/19/20 NA NA 0%
524 Fit up insp 0% 1 day? Fri 6/19/20 Fri 6/19/20 NA NA 0%
525 Weld&grinding 0% 3 days? Fri 6/19/20 Sun 6/21/20 NA NA 0%
526 Flip over and side B weld 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
527 Panel longi insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
528 Fab. Fr.44 - 300 0% 3 days Mon 6/22/20 Wed 6/24/20 NA NA 0%
529 Fab. Fr.47 0% 3 days Mon 6/22/20 Wed 6/24/20 NA NA 0%
530 Fab. Fr.55 0% 8 days Thu 6/18/20 Thu 6/25/20 NA NA
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 8
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
531 Joint plate side A weld 0% 2 days Thu 6/18/20 Fri 6/19/20 NA NA 0%
532 Fitting stiffeners 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
533 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
534 Wled&grinding 0% 2 days Sun 6/21/20 Mon 6/22/20 NA NA 0%
535 Flip over and side B weld 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
536 Panel Fr.55 insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
537 Panel Fr.48+300 0% 7 days Thu 6/18/20 Wed 6/24/20 NA NA
538 Joint plate side A weld 0% 2 days? Thu 6/18/20 Fri 6/19/20 NA NA 0%
539 Fitting stiffeners 0% 1 day? Sat 6/20/20 Sat 6/20/20 NA NA 0%
540 Fit up insp 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
541 Wled&grinding 0% 2 days? Sun 6/21/20 Mon 6/22/20 NA NA 0%
542 Flip over and side B weld 0% 2 days? Mon 6/22/20 Tue 6/23/20 NA NA 0%
543 Panel Fr.55 insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA
544 Fab. Longi 12400 off C L (port) 0% 6 days Sat 6/20/20 Thu 6/25/20 NA NA 0%
545 Joint plate side A weld 0% 2 days? Sat 6/20/20 Sun 6/21/20 NA NA 0%
546 Fitting stiffeners 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
547 Fit up insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
548 Wled&grinding 0% 2 days Mon 6/22/20 Tue 6/23/20 NA NA 0%
549 Flip over and side B weld 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
550 Panel insp 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
551 Fab. Longi 15200 off C L (STBD) 0% 6 days Sat 6/20/20 Thu 6/25/20 NA NA
552 Joint plate side A weld 0% 2 days? Sat 6/20/20 Sun 6/21/20 NA NA 0%
553 Fitting stiffeners 0% 1 day? Sun 6/21/20 Sun 6/21/20 NA NA 0%
554 Fit up insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
555 Wled&grinding 0% 2 days Mon 6/22/20 Tue 6/23/20 NA NA 0%
556 Flip over and side B weld 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
557 Panel insp 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
558 Block Assembly 0% 17 days Sat 6/27/20 Mon 7/13/20 NA NA
559 JIG preparation 0% 1 day? Sat 6/27/20 Sat 6/27/20 NA NA 0%
560 deck @33691 ABL setting on the JIG 0% 4 days? Sat 6/27/20 Tue 6/30/20 NA NA 0%
561 Fitting Longi 17200 off C.L 0% 2 days? Tue 6/30/20 Wed 7/1/20 NA NA 0%
562 Fitting Fr.37 0% 2 days? Wed 7/1/20 Thu 7/2/20 NA NA 0%
563 Fitting Fr.47 0% 2 days? Wed 7/1/20 Thu 7/2/20 NA NA 0%
564 Fitting Fr.48 0% 2 days? Wed 7/1/20 Thu 7/2/20 NA NA 0%
565 Fitting Fr.55 0% 2 days? Thu 7/2/20 Fri 7/3/20 NA NA 0%
566 Fitting longi 12040&15200 off CL port 0% 2 days? Thu 7/2/20 Fri 7/3/20 NA NA 0%
567 Install pipe pillars 0% 1 day? Fri 7/3/20 Fri 7/3/20 NA NA 0%
568 Fitt up dimention overall block 0% 1 day? Sat 7/4/20 Sat 7/4/20 NA NA 0%
569 Welding&grinding block 0% 4 days? Sat 7/4/20 Tue 7/7/20 NA NA 0%
570 Install lifting eye lug 0% 2 days? Mon 7/6/20 Tue 7/7/20 NA NA 0%
571 Line fairing 0% 2 days? Tue 7/7/20 Wed 7/8/20 NA NA 0%
572 NDT 0% 2 days? Thu 7/9/20 Fri 7/10/20 NA NA 0%
573 Block Final insp 0% 1 day? Fri 7/10/20 Fri 7/10/20 NA NA 0%
574 LQ Block QDP 29.288 tons
0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA
575 Block Sub Assembly 0% 20 days Thu 6/11/20 Tue 6/30/20 NA NA
576 Fab. Deck @42135 ABL 0% 20 days Thu 6/11/20 Tue 6/30/20 NA NA
577 Fabrication Deck girder 0% 5 days Thu 6/11/20 Mon 6/15/20 NA NA
578 Fitting T girder 0% 3 days Thu 6/11/20 Sat 6/13/20 NA NA 0%
579 Weld&grinding T girder 0% 4 days Fri 6/12/20 Mon 6/15/20 NA NA 0%
580 Joint fitting deck plate 0% 4 days Thu 6/11/20 Sun 6/14/20 NA NA 0%
581 Take dimention&inspec fit up joint 0% 1 day Sun 6/14/20 Sun 6/14/20 NA NA 0%
582 Welding unimeld joint plate, side A 0% 3 days Sun 6/14/20 Tue 6/16/20 NA NA 0%
583 Marking&take deck dimension 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
584 Fitting deck AB stiffener&girder 0% 3 days Thu 6/18/20 Sat 6/20/20 NA NA 0%
585 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
586 Weld deck stiffeners 0% 4 days Sun 6/21/20 Wed 6/24/20 NA NA 0%
587 Flip over and side B weld 0% 3 days? Thu 6/25/20 Sat 6/27/20 NA NA 0%
588 Turn back side A and setting on the JIG 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
589 Deck @42135 ABL Panel insp 0% 1 day Tue 6/30/20 Tue 6/30/20 NA NA 0%
590 Fab Longi 17200 off C.L (PORT) 0% 10 days? Mon 6/15/20 Wed 6/24/20 NA NA
591 fitting joint plate and side A weld 0% 2 days? Mon 6/15/20 Tue 6/16/20 NA NA 0%
592 Fit up insp 0% 1 day? Wed 6/17/20 Wed 6/17/20 NA NA 0%
593 Unimeld joint weld plate side A weld 0% 2 days? Wed 6/17/20 Thu 6/18/20 NA NA 0%
594 Marking&fitting longi stiffeners 0% 2 days? Fri 6/19/20 Sat 6/20/20 NA NA 0%
595 Fit up insp 0% 1 day? Sat 6/20/20 Sat 6/20/20 NA NA 0%
596 Weld&grinding 0% 3 days? Sat 6/20/20 Mon 6/22/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 9
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
597 Flip over and side B weld 0% 1 day? Tue 6/23/20 Tue 6/23/20 NA NA 0%
598 Panel longi insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
599 Fab. Trans Fr.37 0% 6 days Wed 6/17/20 Mon 6/22/20 NA NA
600 Joint plate side A weld 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
601 Fitting stiffeners 0% 1 day? Thu 6/18/20 Thu 6/18/20 NA NA 0%
602 Fit up insp 0% 1 day? Fri 6/19/20 Fri 6/19/20 NA NA 0%
603 Wled&grinding 0% 2 days? Fri 6/19/20 Sat 6/20/20 NA NA 0%
604 Flip over and side B weld 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
605 Panel Fr.37 insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
606 Fab. Fr.55 0% 6 days Wed 6/17/20 Mon 6/22/20 NA NA
607 Joint plate side A weld 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
608 Fitting stiffeners 0% 1 day? Thu 6/18/20 Thu 6/18/20 NA NA 0%
609 Fit up insp 0% 1 day? Fri 6/19/20 Fri 6/19/20 NA NA 0%
610 Wled&grinding 0% 2 days? Fri 6/19/20 Sat 6/20/20 NA NA 0%
611 Flip over and side B weld 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
612 Panel Fr.55 insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
613 Fab. Fr.44+700 0% 5 days Sat 6/20/20 Wed 6/24/20 NA NA
614 Joint plate side A weld 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
615 Fitting stiffeners 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
616 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
617 Wled&grinding 0% 2 days? Sun 6/21/20 Mon 6/22/20 NA NA 0%
618 Flip over and side B weld 0% 1 day? Tue 6/23/20 Tue 6/23/20 NA NA 0%
619 Panel Fr.44+700 insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
620 Fab. Fr.47 0% 5 days Sat 6/20/20 Wed 6/24/20 NA NA
621 Joint plate side A weld 0% 1 day Sat 6/20/20 Sat 6/20/20 NA NA 0%
622 Fitting stiffeners 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
623 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
624 Wled&grinding 0% 2 days? Sun 6/21/20 Mon 6/22/20 NA NA 0%
625 Flip over and side B weld 0% 1 day? Tue 6/23/20 Tue 6/23/20 NA NA 0%
626 Panel Fr.47 insp 0% 1 day? Wed 6/24/20 Wed 6/24/20 NA NA 0%
627 Block Assembly 0% 14 days Sat 6/27/20 Fri 7/10/20 NA NA
628 JIG preparation 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
629 deck @33691 ABL setting on the JIG 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
630 Fitting Longi 17200 off C.L 0% 2 days Wed 7/1/20 Thu 7/2/20 NA NA 0%
631 Fitting Fr.37 0% 2 days Tue 6/2/20 Wed 6/3/20 NA NA 0%
632 Fitting Fr.47 0% 2 days Thu 7/2/20 Fri 7/3/20 NA NA 0%
633 Fitting Fr.44+700 0% 2 days Fri 7/3/20 Sat 7/4/20 NA NA 0%
634 Fitting Fr.55 0% 2 days Fri 7/3/20 Sat 7/4/20 NA NA 0%
635 Fitting longi 14200 off CL port 0% 2 days Fri 7/3/20 Sat 7/4/20 NA NA 0%
636 Install pipe pillars 0% 1 day Thu 6/4/20 Thu 6/4/20 NA NA 0%
637 Fitt up dimention overall block 0% 1 day Sun 7/5/20 Sun 7/5/20 NA NA 0%
638 Welding&grinding block 0% 4 days Sun 7/5/20 Wed 7/8/20 NA NA 0%
639 Install lifting eye lug 0% 2 days Tue 7/7/20 Wed 7/8/20 NA NA 0%
640 Line fairing 0% 4 days Mon 7/6/20 Thu 7/9/20 NA NA 0%
641 NDT 0% 2 days Wed 7/8/20 Thu 7/9/20 NA NA 0%
642 Block Final insp 0% 31 days Wed 6/10/20 Fri 7/10/20 NA NA 0%
643 LQ Block QHU 17.914 tons
0% 30 days Thu 6/11/20 Fri 7/10/20 NA NA
644 Sub Assembly 0% 20 days Thu 6/11/20 Tue 6/30/20 NA NA 0%
645 Fab. Deck @51850 ABL 0% 20 days? Thu 6/11/20 Tue 6/30/20 NA NA
646 Fabrication girder 0% 20 days? Thu 6/11/20 Tue 6/30/20 NA NA
647 Fitting T girder 0% 4 days Thu 6/11/20 Sun 6/14/20 NA NA 0%
648 Weld&grinding T girder 0% 4 days Sat 6/13/20 Tue 6/16/20 NA NA 0%
649 Joint fitting deck plate 0% 2 days Sat 6/13/20 Sun 6/14/20 NA NA 0%
650 Take dimention&inspec fit up joint 0% 1 day Mon 6/15/20 Mon 6/15/20 NA NA 0%
651 Welding unimeld joint plate,side A 0% 3 days Mon 6/15/20 Wed 6/17/20 NA NA 0%
652 Marking&take deck dimension 0% 1 day Thu 6/18/20 Thu 6/18/20 NA NA 0%
653 Fittingdeck AB stiffener&girder 0% 4 days Thu 6/18/20 Sun 6/21/20 NA NA 0%
654 Fit up insp 0% 1 day Mon 6/22/20 Mon 6/22/20 NA NA 0%
655 Weld deck stiffeners 0% 4 days Mon 6/22/20 Thu 6/25/20 NA NA 0%
656 Flip over deck @36491 ABL to side B weld 0% 2 days Fri 6/26/20 Sat 6/27/20 NA NA 0%
657 Turn back to side A and Setting on the JIG with Weld&grind 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
658 Deck @42135 ABL Panel insp 0% 1 day Tue 6/30/20 Tue 6/30/20 NA NA 0%
659 Fab Fr. 40 0% 11 days Tue 6/16/20 Fri 6/26/20 NA NA
660 fitting joint plate 0% 2 days Tue 6/16/20 Wed 6/17/20 NA NA 0%
661 Fit up insp 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
662 Unimeld joint weld plate side A weld 0% 2 days Thu 6/18/20 Fri 6/19/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline
Page 10
SHAPOORJI BLOCK FABRICATION OF 2ND BATCH DELIVERY
ID Task Name Est. % Duration Plan Start Plan finish Actual Start Actual Finish 5/31 8/9
weight Complete 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
663 Marking&fitting longi stiffeners 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
664 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
665 Weld&grinding 0% 4 days Sun 6/21/20 Wed 6/24/20 NA NA 0%
666 Flip over and side B weld 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
667 Panel longi insp 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
668 Fab Fr. 50+100 0% 11 days Tue 6/16/20 Fri 6/26/20 NA NA
669 fitting joint plate 0% 2 days Tue 6/16/20 Wed 6/17/20 NA NA 0%
670 Fit up insp 0% 1 day Wed 6/17/20 Wed 6/17/20 NA NA 0%
671 Unimeld joint weld plate side A weld 0% 2 days Thu 6/18/20 Fri 6/19/20 NA NA 0%
672 Marking&fitting longi stiffeners 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
673 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
674 Weld&grinding 0% 4 days Sun 6/21/20 Wed 6/24/20 NA NA 0%
675 Flip over and side B weld 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
676 Panel longi insp 0% 1 day Fri 6/26/20 Fri 6/26/20 NA NA 0%
677 Fab. Longi 16100 off CL 0% 12 days Fri 6/19/20 Tue 6/30/20 NA NA
678 fitting joint plate 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
679 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
680 Unimeld joint weld plate side A weld 0% 3 days Sun 6/21/20 Tue 6/23/20 NA NA 0%
681 Marking&fitting longi stiffeners 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
682 Fit up insp 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
683 Weld&grinding 0% 3 days Thu 6/25/20 Sat 6/27/20 NA NA 0%
684 Flip over and side B weld 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
685 Panel longi insp 0% 1 day Tue 6/30/20 Tue 6/30/20 NA NA 0%
686 Fab Long 8600 off CL 0% 12 days? Fri 6/19/20 Tue 6/30/20 NA NA
687 fitting joint plate 0% 2 days Fri 6/19/20 Sat 6/20/20 NA NA 0%
688 Fit up insp 0% 1 day Sun 6/21/20 Sun 6/21/20 NA NA 0%
689 Unimeld joint weld plate side A weld 0% 3 days Sun 6/21/20 Tue 6/23/20 NA NA 0%
690 Marking&fitting longi stiffeners 0% 1 day Wed 6/24/20 Wed 6/24/20 NA NA 0%
691 Fit up insp 0% 1 day Thu 6/25/20 Thu 6/25/20 NA NA 0%
692 Weld&grinding 0% 3 days Thu 6/25/20 Sat 6/27/20 NA NA 0%
693 Flip over and side B weld 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
694 Panel longi insp 0% 1 day Tue 6/30/20 Tue 6/30/20 NA NA 0%
695 Block Assembly 0% 14 days? Sat 6/27/20 Fri 7/10/20 NA NA
696 JIG preparation 0% 2 days Sat 6/27/20 Sun 6/28/20 NA NA 0%
697 deck @51580 ABL setting on the JIG 0% 2 days Sun 6/28/20 Mon 6/29/20 NA NA 0%
698 Fitting Longi 16200 off C.L 0% 2 days Tue 6/30/20 Wed 7/1/20 NA NA 0%
699 Fitting Fr.40 0% 2 days Wed 7/1/20 Thu 7/2/20 NA NA 0%
700 Fitting Longi. 8600 0% 2 days Thu 7/2/20 Fri 7/3/20 NA NA 0%
701 Fitting Fr.50+100 0% 2 days Fri 7/3/20 Sat 7/4/20 NA NA 0%
702 Fitt up dimention overall block 0% 1 day Mon 7/6/20 Mon 7/6/20 NA NA 0%
703 Welding&grinding block 0% 3 days Mon 7/6/20 Wed 7/8/20 NA NA 0%
704 Install lifting eye lug 0% 2 days Tue 7/7/20 Wed 7/8/20 NA NA 0%
705 Line fairing 0% 3 days Tue 7/7/20 Thu 7/9/20 NA NA 0%
706 NDT 0% 1 day Thu 7/9/20 Thu 7/9/20 NA NA 0%
707 Block Final insp 0% 1 day Fri 7/10/20 Fri 7/10/20 NA NA 0%
Critical Task Manual Task Duration-only Baseline Milestone Summary External Tasks Inactive Milestone
Critical Split Split Start-only Baseline Milestone Manual Summary External Milestone Inactive Summary
Critical Progress Task Progress Finish-only Baseline Split Summary Progress Project Summary Inactive Task Deadline