Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Office of the District Engineer Lab. No.: FEECAD-022620-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: February 24, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. February 17, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin February 24, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Trial Mix 2/17/2020 2/24/2020 7 days 2180 (15.03 Mpa.)


B 2/17/2020 2/24/2020 7 days 2190 (15.10 Mpa.)
C 2/17/2020 2/24/2020 7 days 2200 (15.17 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-032720-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 24, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. February 25, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin March 24, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Column Footing 2/25/2020 3/24/2020 28 days 3073 (21.19 Mpa.)


B 2/25/2020 3/24/2020 28 days 3049 (21.03 Mpa.)
C 2/25/2020 3/24/2020 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-033120-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 31, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 4, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin March 31, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Footing Tie Beam 3/4/2020 4/1/2020 28 days 3073 (21.19 Mpa.)


B 3/4/2020 4/1/2020 28 days 3057 (21.08 Mpa.)
C 3/4/2020 4/1/2020 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-040320-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 3, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 6, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 3, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Wall Footing 3/6/2020 4/3/2020 28 days 3080 (21.24 Mpa.)


B 3/6/2020 4/3/2020 28 days 3096 (21.35 Mpa.)
C 3/6/2020 4/3/2020 28 days 3073 (21.19 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-040620-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 6, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 9, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 6, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Column First Lift 3/9/2020 4/6/2020 28 days 3080 (21.24 Mpa.)


B 3/9/2020 4/6/2020 28 days 3073 (21.19 Mpa.)
C 3/9/2020 4/6/2020 28 days 3088 (21.30 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-040820-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 8, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 11, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 8, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Grade Beam 3/11/2020 4/8/2020 28 days 3073 (21.19 Mpa.)


B 3/11/2020 4/8/2020 28 days 3057 (21.08 Mpa.)
C 3/11/2020 4/8/2020 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-041420-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 13, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 16, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 13, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Column (Ground Floor) 3/16/2020 4/13/2020 28 days 3080 (21.24 Mpa.)


B 3/16/2020 4/13/2020 28 days 3065 (21.14 Mpa.)
C 3/16/2020 4/13/2020 28 days 3073 (21.19 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-041620-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: June 1, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Barangay Malinao, Gabaldon, Nueva Ecija

Contractor: DGSARM Builders Inc.


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. May 4, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin June 1, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Beam, Slab & Stair 5/4/2020 6/1/2020 28 days 3073 (21.19 Mpa.)
B 5/4/2020 6/1/2020 28 days 3065 (21.14 Mpa.)
C 5/4/2020 6/1/2020 28 days 3088 (21.24 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

JEAN MARION P. CASTILLO JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

NAPOLEON C. MANALANSANG
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-071719-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: July 17, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. July 10, 2019
(Name and Designation)
Submitted by: Ronnie Talens July 17, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I A Trial Mix 7/10/2019 7/17/2019 7 days
2180 (15.03 Mpa.)
B 7/10/2019 7/17/2019 7 days
2190 (15.10 Mpa.)
C 7/10/2019 7/17/2019 7 days
2200 (15.17 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-081519-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 15, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. July 18, 2019
(Name and Designation)
Submitted by: Ronnie Talens August 15, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I Footing/Tie
A 7/18/2019 8/15/2019 28 days
Beam 3080 (21.24 Mpa.)
B 7/18/2019 8/15/2019 28 days
3057 (21.08 Mpa.)
C 7/18/2019 8/15/2019 28 days
3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550866____ Dated:___1-9-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-082219-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 22, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. July 25, 2019
(Name and Designation)
Submitted by: Ronnie Talens August 22, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I A Column 7/25/2019 8/22/2019 28 days
3049 (21.03 Mpa.)
B 7/25/2019 8/22/2019 28 days
3096 (21.35 Mpa.)
C 7/25/2019 8/22/2019 28 days
3041 (20.97 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550866____ Dated:___1-9-2020_____ Amount:___A Part of P1,080.00___________
Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-082919-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 29, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. August 1, 2019
(Name and Designation)
Submitted by: Ronnie Talens August 29, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I A Beam/Slab 8/1/2019 8/29/2019 28 days
3018 (20.81 Mpa.)
B 8/1/2019 8/29/2019 28 days
3020 (20.82 Mpa.)
C 8/1/2019 8/29/2019 28 days
3030 (20.89 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550866____ Dated:___1-9-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative
80.00___________
6

80.00___________
6

80.00___________

You might also like