Test Report On Concrete Samples: Project: Contractor: Type of Specimen: Specimen Item No.: Class: Source of Mixture

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 96

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Office of the District Engineer Lab. No.: FEECAD-022620-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: February 26, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. February 19, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin February 26, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Trial Mix 2/19/2020 2/26/2020 7 days 2180 (15.03 Mpa.)


B 2/19/2020 2/26/2020 7 days 2190 (15.10 Mpa.)
C 2/19/2020 2/26/2020 7 days 2200 (15.17 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-032720-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 26, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. February 27, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin March 26, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Column Footing 2/27/2020 3/26/2020 28 days 3073 (21.19 Mpa.)


B 2/27/2020 3/26/2020 28 days 3049 (21.03 Mpa.)
C 2/27/2020 3/26/2020 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-033120-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 31, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 4, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin March 31, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Footing Tie Beam 3/4/2020 4/1/2020 28 days 3073 (21.19 Mpa.)


B 3/4/2020 4/1/2020 28 days 3057 (21.08 Mpa.)
C 3/4/2020 4/1/2020 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-040320-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 3, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 6, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 3, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Wall Footing 3/6/2020 4/3/2020 28 days 3080 (21.24 Mpa.)


B 3/6/2020 4/3/2020 28 days 3096 (21.35 Mpa.)
C 3/6/2020 4/3/2020 28 days 3073 (21.19 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-040620-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 6, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 9, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 6, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Column First Lift 3/9/2020 4/6/2020 28 days 3080 (21.24 Mpa.)


B 3/9/2020 4/6/2020 28 days 3073 (21.19 Mpa.)
C 3/9/2020 4/6/2020 28 days 3088 (21.30 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-040820-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 8, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 11, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 8, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Grade Beam 3/11/2020 4/8/2020 28 days 3073 (21.19 Mpa.)


B 3/11/2020 4/8/2020 28 days 3057 (21.08 Mpa.)
C 3/11/2020 4/8/2020 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-041420-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 14, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 17, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 14, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Column (Ground Floor) 3/17/2020 4/14/2020 28 days 3080 (21.24 Mpa.)


B 3/17/2020 4/14/2020 28 days 3065 (21.14 Mpa.)
C 3/17/2020 4/14/2020 28 days 3073 (21.19 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-041620-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 16, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 19, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 16, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Beam, Slab & Stair 3/19/2020 4/16/2020 28 days 3073 (21.19 Mpa.)
B 3/19/2020 4/16/2020 28 days 3065 (21.14 Mpa.)
C 3/19/2020 4/16/2020 28 days 3088 (21.24 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-042020-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 20, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 23, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 20, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Column (Second Floor) 3/23/2020 4/20/2020 28 days 3088 (21.30 Mpa.)


B 3/23/2020 4/20/2020 28 days 3080 (21.24 Mpa.)
C 3/23/2020 4/20/2020 28 days 3073 (21.19 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-042220-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 22, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. March 25, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin April 22, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Roof Beam 3/25/2020 4/22/2020 28 days 3073 (21.19 Mpa.)


B 3/25/2020 4/22/2020 28 days 3088 (21.30 Mpa.)
C 3/25/2020 4/22/2020 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested/Checked by:

JOHN ADDI Y. LEABRES


Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-052820-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 28, 2020

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Poblacion, Gabaldon, Nueva Ecija

Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. May 4, 2020
(Name and Designation)
Submitted by: Ramon S. Antolin May 28, 2020
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive

I A Slab on Fill 5/4/2020 5/28/2020 24 days 2929 (20.2 Mpa.)


B 5/4/2020 5/28/2020 24 days 2936 (20.24 Mpa.)
C 5/4/2020 5/28/2020 24 days 2941 (20.28 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___5899061____ Dated:___6-2-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician II Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 6, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building at Barangay Tugatog,


Bongabon, N.E
Contractor: JERRY R. SANTIAGO CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. August 9, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago September 6, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 8/9/2019 9/6/2019 28 days 3073 (21.19 Mpa.)
B 8/9/2019 9/6/2019 28 days 3112 (21.46 Mpa.)
C 8/9/2019 9/6/2019 28 days 3166 (21.84 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550627____ Dated:___11-13-2019_______ Amount:___A Part of P1,440.00____________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. July 23, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 7/23/2019 8/20/2019 28 days 3049 (21.03 Mpa.)
B 7/23/2019 8/20/2019 28 days 3030 (20.89 Mpa.)
C 7/23/2019 8/20/2019 28 days 3023 (20.84 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _______________ Dated:___________________ Amount:________________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 29, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Barangay Hall) at Brgy. Ariendo,


Bongabon, N.E
Contractor: JERRY R. SANTIAGO CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. August 1, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago August 29, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Beam/Slab 8/1/2019 8/29/2019 28 days 3174 (21.89 Mpa.)
B 8/1/2019 8/29/2019 28 days 3065 (21.14 Mpa.)
C 8/1/2019 8/29/2019 28 days 3112 (21.46 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _______________ Dated:___________________ Amount:________________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 5, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Barangay Hall) at Brgy. Ariendo,


Bongabon, N.E
Contractor: JERRY R. SANTIAGO CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. August 8, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago September 5, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 8/8/2019 9/5/2019 28 days 3151 (21.73 Mpa.)
B 8/8/2019 9/5/2019 28 days 3049 (21.03 Mpa.)
C 8/8/2019 9/5/2019 28 days 3182 (21.94 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _______________ Dated:___________________ Amount:________________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Source of Mixture: AT SITE


Sampled by: Merlyn B. Leoncio & Comp. June 27, 2019
(Name and Designation)
Submitted by: Merlyn B. Leoncio December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 6/27/2019 7/25/2019 28 days 3080 (21.24 Mpa.)
B 6/27/2019 7/25/2019 28 days 3112 (21.46 Mpa.)
C 6/27/2019 7/25/2019 28 days 3034 (20.92 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _______________ Dated:___________________ Amount:________________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MERLYN B. LEONCIO
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: July 31, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building - Construction of Multi Purpose


Building at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: J.P. SANDOVAL CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Merlyn B. Leoncio & Comp. July 3, 2019
(Name and Designation)
Submitted by: Merlyn B. Leoncio July 31, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 7/3/2019 7/31/2019 28 days 3174 (21.89 Mpa.)
B 7/3/2019 7/31/2019 28 days 3049 (21.03 Mpa.)
C 7/3/2019 7/31/2019 28 days 3023 (20.84 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _______________ Dated:___________________ Amount:________________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MERLYN B. LEONCIO
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 6, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building - Construction of Multi Purpose


Building at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor:
3049 (21.03 Mpa.)
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Merlyn B. Leoncio & Comp. July 9, 2019
(Name and Designation)
Submitted by: Merlyn B. Leoncio August 6, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 7/9/2019 8/6/2019 28 days 3127 (21.57 Mpa.)
B 7/9/2019 8/6/2019 28 days 3096 (21.35 Mpa.)
C 7/9/2019 8/6/2019 28 days 3127 (21.57 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _______________ Dated:___________________ Amount:________________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MERLYN B. LEONCIO
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 15, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building - Construction of Multi Purpose


Building at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: J.P. SANDOVAL CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Merlyn B. Leoncio & Comp. July 18, 2019
(Name and Designation)
Submitted by: Merlyn B. Leoncio August 15, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slab on Fill 7/18/2019 8/15/2019 28 days 3080 (21.24 Mpa.)
B 7/18/2019 8/15/2019 28 days 3065 (21.14 Mpa.)
C 7/18/2019 8/15/2019 28 days 3030 (20.89 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _______________ Dated:___________________ Amount:________________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II
Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MERLYN B. LEONCIO
Contractor's Representative

Sampled by: Lester B. Alcaide & Comp. July 24, 2019


(Name and Designation)
Submitted by: Lester B. Alcaide December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 7/24/2019 8/21/2019 28 days 3049 (21.03 Mpa.)
B 7/24/2019 8/21/2019 28 days 3112 (21.46 Mpa.)
C 7/24/2019 8/21/2019 28 days 3166 (21.84 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550618______ Dated:__10-29-2019____ Amount:__A Part of P1,440.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section
Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

LESTER B. ALCAIDE
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: MKM-082619-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 26, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Bagong Sikat, Gabaldon, N.E

Contractor: MKM BUILDERS


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Lester B. Alcaide & Comp. July 29, 2019
(Name and Designation)
Submitted by: Lester B. Alcaide August 26, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 7/29/2019 8/26/2019 28 days 3073 (21.19 Mpa.)
B 7/29/2019 8/26/2019 28 days 3174 (21.89 Mpa.)
C 7/29/2019 8/26/2019 28 days 3104 (21.41 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550618______ Dated:__10-29-2019____ Amount:__A Part of P1,440.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

LESTER B. ALCAIDE
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: MKM-083019-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 30, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Bagong Sikat, Gabaldon, N.E

Contractor: MKM BUILDERS


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Lester B. Alcaide & Comp. August 2, 2019
(Name and Designation)
Submitted by: Lester B. Alcaide August 30, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 8/2/2019 8/30/2019 28 days 3041 (20.97 Mpa.)
B 8/2/2019 8/30/2019 28 days 3127 (21.57 Mpa.)
C 8/2/2019 8/30/2019 28 days 3135 (21.62 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550618______ Dated:__10-29-2019____ Amount:__A Part of P1,440.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

LESTER B. ALCAIDE
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: MKM-091119-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 11, 2019
TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building, Bagong Sikat, Gabaldon, N.E

Contractor: MKM BUILDERS


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Lester B. Alcaide & Comp. August 14, 2019
(Name and Designation)
Submitted by: Lester B. Alcaide September 11, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slab on Fill 8/14/2019 9/11/2019 28 days 3080 (21.24 Mpa.)
B 8/14/2019 9/11/2019 28 days 3030 (20.89 Mpa.)
C 8/14/2019 9/11/2019 28 days 3151 (21.73 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550618______ Dated:__10-29-2019____ Amount:__A Part of P1,440.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

LESTER B. ALCAIDE
Contractor's Representative
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. June 28, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Footing 6/28/2019 7/26/2019 28 days 3119 (21.51 Mpa.)
B (Court) 6/28/2019 7/26/2019 28 days 3096 (21.35 Mpa.)
C 6/28/2019 7/26/2019 28 days 3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: July 31, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 3, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin July 31, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 7/3/2019 7/31/2019 28 days 3190 (22.00 Mpa.)
B (Stage) 7/3/2019 7/31/2019 28 days 3174 (21.89 Mpa.)
C 7/3/2019 7/31/2019 28 days 3073 (21.19 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 2, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 5, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 2, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 7/5/2019 8/2/2019 28 days 3057 (21.08 Mpa.)
B (Court) 7/5/2019 8/2/2019 28 days 3018 (20.81 Mpa.)
C 7/5/2019 8/2/2019 28 days 3065 (21.14 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 6, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 9, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 6, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A First Lift 7/9/2019 8/6/2019 28 days 3034 (20.92 Mpa.)
B (Court) 7/9/2019 8/6/2019 28 days 3080 (21.24 Mpa.)
C 7/9/2019 8/6/2019 28 days 3119 (21.51 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 8, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 11, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 8, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A First Lift 7/11/2019 8/8/2019 28 days 3151 (21.73 Mpa.)
B (Stage) 7/11/2019 8/8/2019 28 days 3174 (21.89 Mpa.)
C 7/11/2019 8/8/2019 28 days 3182 (21.94 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 12, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 15, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 12, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 7/15/2019 8/12/2019 28 days 3080 (21.24 Mpa.)
B (Court) 7/15/2019 8/12/2019 28 days 3008 (20.74 Mpa.)
C 7/15/2019 8/12/2019 28 days 3020 (20.82 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:


PETER L. MARQUEZ JOHN ADDI Y. LEABRES
Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 15, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 18, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 15, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 7/18/2019 8/15/2019 28 days 3073 (21.19 Mpa.)
B (Stage) 7/18/2019 8/15/2019 28 days 3049 (21.03 Mpa.)
C 7/18/2019 8/15/2019 28 days 3143 (21.67 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 19, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 22, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 19, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 7/22/2019 8/19/2019 28 days 3174 (21.89 Mpa.)
B (Stage) 7/22/2019 8/19/2019 28 days 3065 (21.14 Mpa.)
C 7/22/2019 8/19/2019 28 days 3119 (21.51 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer
RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 20, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 23, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 20, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slab on Fill 7/23/2019 8/20/2019 28 days 3049 (21.03 Mpa.)
B (Stage) 7/23/2019 8/20/2019 28 days 3030 (20.89 Mpa.)
C 7/23/2019 8/20/2019 28 days 3135 (21.62 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 26, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi Purpose Building - Construction of Multi Purpose


Building (Covered Court), at Paaralan Elementarya ng Brgy. Cuyapa
Contractor: FAR EAST EAGLE CONSTRUCTION AND DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin & Comp. July 29, 2019
(Name and Designation)
Submitted by: Ramon S. Antolin August 26, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slab on Fill 7/29/2019 8/26/2019 28 days 3065 (21.14 Mpa.)
B (Court) 7/29/2019 8/26/2019 28 days 3049 (21.03 Mpa.)
C 7/29/2019 8/26/2019 28 days 3026 (20.87 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___________________ Dated:__________________ Amount:______________________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

RAMON S. ANTOLIN
Contractor's Representative
Contractor: JERRY R. SANTIAGO CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 4, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Footing 2/4/2019 3/4/2019 28 days 4010 (27.66 Mpa.)
B Grid A-C, Line 4-6 2/4/2019 3/4/2019 28 days 4006 (27.63 Mpa.)
C 2/4/2019 3/4/2019 28 days 4030 (27.79 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-030619-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 6, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 6, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago March 6, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 2/6/2019 3/6/2019 28 days 4026 (27.77 Mpa.)
B 2/6/2019 3/6/2019 28 days 4030 (27.79 Mpa.)
C 2/6/2019 3/6/2019 28 days 4024 (27.75 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-031119-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 11, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 11, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago March 11, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2/11/2019 3/11/2019 28 days 4038 (27.85 Mpa.)
B 1st floor 2/11/2019 3/11/2019 28 days 4020 (27.72 Mpa.)
C Grid A-C, Line 1-3 2/11/2019 3/11/2019 28 days 4028 (27.78 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-031419-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 14, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 14, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago March 14, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2/14/2019 3/14/2019 28 days 4024 (27.75 Mpa.)
B 1st floor 2/14/2019 3/14/2019 28 days 4022 (27.74 Mpa.)
C Grid A-C, Line 4-6 2/14/2019 3/14/2019 28 days 4002 (27.60 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-031819-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 18, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 18, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago March 18, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slab 2nd floor 2/18/2019 3/18/2019 28 days 4018 (27.71 Mpa.)
B 2/18/2019 3/18/2019 28 days 4016 (27.70 Mpa.)
C 2/18/2019 3/18/2019 28 days 4018 (27.71 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-032119-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 21, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 21, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago March 21, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2/21/2019 3/21/2019 28 days 4036 (27.83 Mpa.)
B 2nd Floor 2/21/2019 3/21/2019 28 days 4034 (27.82 Mpa.)
C Grid A-C, Line 1-3 2/21/2019 3/21/2019 28 days 4030 (27.79 Mpa.)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-032619-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 26, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 26, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago March 26, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2/26/2019 3/26/2019 28 days 4016 (27.70 Mpa.)
B 2nd Floor 2/26/2019 3/26/2019 28 days 4024 (27.75 Mpa.)
C Grid A-C, Line 4-6 2/26/2019 3/26/2019 28 days 4016 (27.70 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-032719-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 27, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. February 27, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago March 27, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 2/27/2019 3/27/2019 28 days 4038 (27.85 Mpa.)
B 2/27/2019 3/27/2019 28 days 4030 (27.79 Mpa.)
C 2/27/2019 3/27/2019 28 days 4036 (27.83 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-040319-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 3, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. March 6, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago April 3, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Stair 3/6/2019 4/3/2019 28 days 4024 (27.75 Mpa.)
B 3/6/2019 4/3/2019 28 days 4004 (27.61 Mpa.)
C 3/6/2019 4/3/2019 28 days 4008 (27.64 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: JRS-SB-040919-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 9, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2STY 4CL, Antipolo ES, Bongabon, Nueva Ecija

Contractor: JERRY R. SANTIAGO CONSTRUCTION


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)
Class: "A"
Source of Mixture: AT SITE
Sampled by: Mark Joseph Santiago & Comp. March 12, 2019
(Name and Designation)
Submitted by: Mark Joseph Santiago April 9, 2019
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slab on Fill 3/12/2019 4/9/2019 28 days 4024 (27.75 Mpa.)
B 3/12/2019 4/9/2019 28 days 4034 (27.82 Mpa.)
C 3/12/2019 4/9/2019 28 days 4010 (27.66 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550363_______ Dated:___8-2-2019_______ Amount:_A part of P3,960.00________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABRES


Material Engineer Chief, Quality Assurance Section

Attested by:
Witnessed by: RICARDO M. PUNO
District Engineer

MARK JOSEPH SANTIAGO


Contractor's Representative

Type of Specimen: Concrete Cylinder


Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Napoleon C. Manalansang Jr. & Comp. March 27, 2018
(Name and Designation)
Submitted by: Napoleon C. Manalansang Jr. December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 3/27/2018 4/24/2018 28 days 3119 (21.51 Mpa)
B 3/27/2018 4/24/2018 28 days 3127 (21.57 Mpa)
C 3/27/2018 4/24/2018 28 days 3104 (21.41 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260922__________ Dated:__7-18-2018_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:
Witnessed by: RICARDO M. PUNO
OIC, District Engineer

NAPOLEON C. MANALANSANG JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: DGS-050318-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 3, 2018

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Covered Court, Brgy. Bagong Sikat Elementary School,


Gabaldon, Nueva Ecija
Contractor: D.G. SARMENTA CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Napoleon C. Manalansang Jr. & Comp. April 5, 2018
(Name and Designation)
Submitted by: Napoleon C. Manalansang Jr. May 3, 2018
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 4/5/2018 5/3/2018 28 days 3073 (21.19 Mpa)
B 4/5/2018 5/3/2018 28 days 3080 (21.24 Mpa)
C 4/5/2018 5/3/2018 28 days 3088 (21.30 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260922__________ Dated:__7-18-2018_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


OIC, District Engineer

NAPOLEON C. MANALANSANG JR.


Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: DGS-051018-002
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 10, 2018

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Covered Court, Brgy. Bagong Sikat Elementary School,


Gabaldon, Nueva Ecija
Contractor: D.G. SARMENTA CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Napoleon C. Manalansang Jr. & Comp. April 12, 2018
(Name and Designation)
Submitted by: Napoleon C. Manalansang Jr. May 10, 2018
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 4/12/2018 5/10/2018 28 days 3057 (21.08 Mpa)
B 4/12/2018 5/10/2018 28 days 3065 (21.14 Mpa)
C 4/12/2018 5/10/2018 28 days 3060 (21.10 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260922__________ Dated:__7-18-2018_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


OIC, District Engineer

NAPOLEON C. MANALANSANG JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: DGS-051718-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 17, 2018

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Covered Court, Brgy. Bagong Sikat Elementary School,


Gabaldon, Nueva Ecija
Contractor: D.G. SARMENTA CONSTRUCTION
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Napoleon C. Manalansang Jr. & Comp. April 19, 2018
(Name and Designation)
Submitted by: Napoleon C. Manalansang Jr. May 17, 2018
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Flooring 4/19/2018 5/17/2018 28 days 3073 (21.18 Mpa)
B 4/19/2018 5/17/2018 28 days 3112 (21.45 Mpa)
C 4/19/2018 5/17/2018 28 days 3049 (21.02 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260922__________ Dated:__7-18-2018_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


OIC, District Engineer

NAPOLEON C. MANALANSANG JR.


Contractor's Representative
Contractor: Prudenzia Const. & Realty Development Corporation
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Homer M. Abad & Comp. April 3, 2018
(Name and Designation)
Submitted by: Homer M. Abad December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 4/3/2018 5/1/2018 28 days 3051 (21.04 Mpa)
B 4/3/2018 5/1/2018 28 days 3068 (21.16 Mpa)
C 4/3/2018 5/1/2018 28 days 3076 (21.21 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260912__________ Dated:__7-3-18_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


OIC, District Engineer

HOMER M. ABAD
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: PCRDC-050818-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 8, 2018
TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Covered Court, Brgy. Lusok, Bongabon, Nueva Ecija

Contractor: Prudenzia Const. & Realty Development Corporation


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Homer M. Abad & Comp. April 10, 2018
(Name and Designation)
Submitted by: Homer M. Abad May 8, 2018
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 4/10/2018 5/8/2018 28 days 3096 (21.35 Mpa)
B 4/10/2018 5/8/2018 28 days 3104 (21.41 Mpa)
C 4/10/2018 5/8/2018 28 days 3100 (21.38 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260912__________ Dated:__7-3-18_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


OIC, District Engineer

HOMER M. ABAD
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: PCRDC-051618-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 16, 2018

TEST REPORT ON CONCRETE SAMPLES


Project : Construction of Covered Court, Brgy. Lusok, Bongabon, Nueva Ecija

Contractor: Prudenzia Const. & Realty Development Corporation


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Homer M. Abad & Comp. April 18, 2018
(Name and Designation)
Submitted by: Homer M. Abad May 16, 2018
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 4/18/2018 5/16/2018 28 days 3073 (21.19 Mpa)
B 4/18/2018 5/16/2018 28 days 3085 (21.28 Mpa)
C 4/18/2018 5/16/2018 28 days 3068 (21.16 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260912__________ Dated:__7-3-18_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


OIC, District Engineer

HOMER M. ABAD
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: PCRDC-052318-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 23, 2018

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Covered Court, Brgy. Lusok, Bongabon, Nueva Ecija

Contractor: Prudenzia Const. & Realty Development Corporation


Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Homer M. Abad & Comp. April 25, 2018
(Name and Designation)
Submitted by: Homer M. Abad May 23, 2018
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Flooring 4/25/2018 5/23/2018 28 days 3065 (21.13 Mpa)
B 4/25/2018 5/23/2018 28 days 3073 (21.19 Mpa)
C 4/25/2018 5/23/2018 28 days 3041 (20.97 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260912__________ Dated:__7-3-18_________ Amount:_A Part of P1,440.00______________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES MARLON G. HERNANDEZ


Material Engineer Chief, Quality Assurance Section

Attested by:

Witnessed by: RICARDO M. PUNO


OIC, District Engineer

HOMER M. ABAD
Contractor's Representative
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Footing 2 8/3/2017 8/31/2017 28 days 3051 (21.04 Mpa)
B 8/3/2017 8/31/2017 28 days 3068 (21.16 Mpa)
C 8/3/2017 8/31/2017 28 days 3076 (21.21 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-090217-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 2, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage


Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. August 5, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 2, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Footing 3 8/5/2017 9/2/2017 28 days 3096 (21.35 Mpa)
B 8/5/2017 9/2/2017 28 days 3104 (21.41 Mpa)
C 8/5/2017 9/2/2017 28 days 3100 (21.38 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-090417-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 4, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage


Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. August 7, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 4, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Footing 4 8/7/2017 9/4/2017 28 days 3073 (21.19 Mpa)
B 8/7/2017 9/4/2017 28 days 3085 (21.28 Mpa)
C 8/7/2017 9/4/2017 28 days 3068 (21.16 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-090817-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 8, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage


Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. August 11, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 8, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slope 1 8/11/2017 9/8/2017 28 days 3065 (21.13 Mpa)
B 8/11/2017 9/8/2017 28 days 3073 (21.19 Mpa)
C 8/11/2017 9/8/2017 28 days 3041 (20.97 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-091617-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 16, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage


Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. August 19, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 16, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slope 2 8/19/2017 9/16/2017 28 days 3073 (21.18 Mpa)
B 8/19/2017 9/16/2017 28 days 3112 (21.45 Mpa)
C 8/19/2017 9/16/2017 28 days 3049 (21.02 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-092117-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 21, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage


Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. August 24, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 21, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slope 3 8/24/2017 9/21/2017 28 days 3072 (21.19 Mpa)
B 8/24/2017 9/21/2017 28 days 3018 (20.81 Mpa)
C 8/24/2017 9/21/2017 28 days 3041(20.97 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-092517-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 25, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage


Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. August 28, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 25, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slope 4 8/28/2017 9/25/2017 28 days 3065 (21.13 Mpa)
B 8/28/2017 9/25/2017 28 days 3073 (21.19 Mpa)
C 8/28/2017 9/25/2017 28 days 3041 (20.97 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-092717-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 27, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage


Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. August 30, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 27, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Slope 5 8/30/2017 9/27/2017 28 days 3033 (20.92 Mpa)
B 8/30/2017 9/27/2017 28 days 3096 (21.35 Mpa)
C 8/30/2017 9/27/2017 28 days 3080 (21.24 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-093017-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: September 30, 2017

TEST REPORT ON CONCRETE SAMPLES


Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage
Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. September 2, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. September 30, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Top Berm 1 9/2/2017 9/30/2017 28 days 3080 (21.24 Mpa)
B 9/2/2017 9/30/2017 28 days 3092 (21.32 Mpa)
C 9/2/2017 9/30/2017 28 days 3060 (21.10 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-100417-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: October 4, 2017

TEST REPORT ON CONCRETE SAMPLES


Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage
Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. September 6, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. October 4, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Top Berm 2 9/6/2017 10/4/2017 28 days 3080 (21.23 Mpa)
B 9/6/2017 10/4/2017 28 days 3056 (21.07 Mpa)
C 9/6/2017 10/4/2017 28 days 3096 (21.34 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: CCF-100917-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: October 9, 2017

TEST REPORT ON CONCRETE SAMPLES


Project : Const/Maintenance of Flood Control Mitigation Structures & Drainage
Systems Rehab/Improvement of Digmala River Control, Ariendo Section
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 510
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. September 11, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. October 9, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Top Berm 3 9/11/2017 10/9/2017 28 days 3119 (21.51 Mpa)
B 9/11/2017 10/9/2017 28 days 3127 (21.57 Mpa)
C 9/11/2017 10/9/2017 28 days 3104 (21.41 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. _6260246_______ Dated:__10-18-17______ Amount:_A Part of P4,320.00_________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative
Project :
Drainage Systems
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. September 6, 2017
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. December 30, 1899
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Top Berm 2 9/6/2017 10/4/2017 28 days
B 9/6/2017 10/4/2017 28 days
C 9/6/2017 10/4/2017 28 days

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ________ Dated:________ Amount:__________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Laboratory Technician I Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ RICARDO M. PUNO


Chief, Quality Assurance Section Caretaker, Office of the District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.:
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: January 23, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction/Maintenance of Flood Control Mitigation Structures &


Drainage Systems
Contractor: CCF earthmoving corp.
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Alfredo S. Anulacion Jr. December 26, 2016
(Name and Designation)
Submitted by: Alfredo S. Anulacion Jr. January 23, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Footing 1 12/26/2016 1/23/2017 28 days 3057 (21.08 Mpa)
B 12/26/2016 1/23/2017 28 days 3065 (21.14 Mpa)
C 12/26/2016 1/23/2017 28 days 3060 (21.10 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ________ Dated:________ Amount:__________

Tested by: Checked by:

PETER L. MARQUEZ ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

ALFREDO S. ANULACION JR.


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-012617-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: January 26, 2017
TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin December 29, 2016
(Name and Designation)
Submitted by: Proceso Hipolito January 26, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Footing 2 12/29/2016 1/26/2017 28 days 3051 (21.04 Mpa)
B 12/29/2016 1/26/2017 28 days 3068 (21.16 Mpa)
C 12/29/2016 1/26/2017 28 days 3076 (21.21 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-020117-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: February 1, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin January 4, 2017
(Name and Designation)
Submitted by: Proceso Hipolito February 1, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 1 1/4/2017 2/1/2017 28 days 3096 (21.35 Mpa)
B 1/4/2017 2/1/2017 28 days 3104 (21.41 Mpa)
C 1/4/2017 2/1/2017 28 days 3100 (21.38 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-020617-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: February 6, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin January 9, 2017
(Name and Designation)
Submitted by: Proceso Hipolito February 6, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Tie Beam 2 1/9/2017 2/6/2017 28 days 3100 (21.38 Mpa)
B 1/9/2017 2/6/2017 28 days 3119 (21.51 Mpa)
C 1/9/2017 2/6/2017 28 days 3096 (21.35 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-021317-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: February 13, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin January 16, 2017
(Name and Designation)
Submitted by: Proceso Hipolito February 13, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 1 1/16/2017 2/13/2017 28 days 3051 (21.04 Mpa)
B 1/16/2017 2/13/2017 28 days 3060 (21.10 Mpa)
C 1/16/2017 2/13/2017 28 days 3068 (21.16 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-021717-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: February 17, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin January 20, 2017
(Name and Designation)
Submitted by: Proceso Hipolito February 17, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2 1/20/2017 2/17/2017 28 days 3073 (21.19 Mpa)
B 1/20/2017 2/17/2017 28 days 3085 (21.28 Mpa)
C 1/20/2017 2/17/2017 28 days 3068 (21.16 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-030217-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 2, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin February 2, 2017
(Name and Designation)
Submitted by: Proceso Hipolito March 2, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Beam Slab 2/2/2017 3/2/2017 28 days 3119 (21.51 Mpa)
B 2/2/2017 3/2/2017 28 days 3127 (21.57 Mpa)
C 2/2/2017 3/2/2017 28 days 3100 (21.38 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-030317-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 3, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin February 3, 2017
(Name and Designation)
Submitted by: Proceso Hipolito March 3, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Beam Slab 2/3/2017 3/3/2017 28 days 3112 (21.46 Mpa)
B 2/3/2017 3/3/2017 28 days 3135 (21.62 Mpa)
C 2/3/2017 3/3/2017 28 days 3104 (21.41 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-031717-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 17, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin February 17, 2017
(Name and Designation)
Submitted by: Proceso Hipolito March 17, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Stair 2/17/2017 3/17/2017 28 days 3034 (20.92 Mpa)
B 2/17/2017 3/17/2017 28 days 3038 (20.95 Mpa)
C 2/17/2017 3/17/2017 28 days 3049 (21.03 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-032417-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 24, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin February 24, 2017
(Name and Designation)
Submitted by: Proceso Hipolito March 24, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2nd Lift 2/24/2017 3/24/2017 28 days 3065 (21.14 Mpa)
B 2/24/2017 3/24/2017 28 days 3080 (21.24 Mpa)
C 2/24/2017 3/24/2017 28 days 3057 (21.08 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-032917-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: March 29, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin March 1, 2017
(Name and Designation)
Submitted by: Proceso Hipolito March 29, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2nd Lift 3/1/2017 3/29/2017 28 days 3073 (21.19 Mpa)
B 3/1/2017 3/29/2017 28 days 3080 (21.24 Mpa)
C 3/1/2017 3/29/2017 28 days 3088 (21.30 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:


WILFREDO M. MATIAS ILUMINADA G. FLORES
Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-040317-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 3, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin March 6, 2017
(Name and Designation)
Submitted by: Proceso Hipolito April 3, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Sun Breaker 3/6/2017 4/3/2017 28 days 3006 (20.73 Mpa)
B 3/6/2017 4/3/2017 28 days 3015 (20.79 Mpa)
C 3/6/2017 4/3/2017 28 days 3002 (20.70 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:


MARLON G. HERNANDEZ ULYSSES C. LLADO
Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-041917-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 19, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin March 22, 2017
(Name and Designation)
Submitted by: Proceso Hipolito April 19, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 3/22/2017 4/19/2017 28 days 3100 (21.38 Mpa)
B 3/22/2017 4/19/2017 28 days 3112 (21.46 Mpa)
C 3/22/2017 4/19/2017 28 days 3092 (21.32 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer
Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-042517-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: April 25, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin March 28, 2017
(Name and Designation)
Submitted by: Proceso Hipolito April 25, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 3/28/2017 4/25/2017 28 days 3119 (21.51 Mpa)
B 3/28/2017 4/25/2017 28 days 3127 (21.57 Mpa)
C 3/28/2017 4/25/2017 28 days 3104 (21.41 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: FEECAD-050817-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: May 8, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 Storey 10 Classroom School Building, Bongabon NHS,


Bongabon, Nueva Ecija 3rd LD
Contractor: FAR EAST EAGLE CONSTRUCTION & DEVELOPMENT
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ramon S. Antolin April 10, 2017
(Name and Designation)
Submitted by: Proceso Hipolito May 8, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Flooring 4/10/2017 5/8/2017 28 days 3080 (21.24 Mpa)
B 4/10/2017 5/8/2017 28 days 3092 (21.32 Mpa)
C 4/10/2017 5/8/2017 28 days 3060 (21.10 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___6260086_____ Dated:__8-7-2017______ Amount:__A Part of P3,960.00_________

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

RAMON S. ANTOLIN
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __1121163841_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: November 21, 2016

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla November 21, 2016
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 1st floor 10/24/2016 11/21/2016 28 days 3080 (21.24 Mpa)
B 10/24/2016 11/21/2016 28 days 3034 (20.92 Mpa)
C 10/24/2016 11/21/2016 28 days 3073 (21.19 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __1130163842_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: November 30, 2016

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla November 30, 2016
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 1st floor 11/2/2016 11/30/2016 28 days 3073 (21.18 Mpa)
B 11/2/2016 11/30/2016 28 days 3112 (21.45 Mpa)
C 11/2/2016 11/30/2016 28 days 3049 (21.02 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __1206163843_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: December 6, 2016

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla December 6, 2016
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Beam Slab 11/8/2016 12/6/2016 28 days 3080 (21.23 Mpa)
B 11/8/2016 12/6/2016 28 days 3056 (21.07 Mpa)
C 11/8/2016 12/6/2016 28 days 3096 (21.34 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __1214163844_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: December 14, 2016

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla December 14, 2016
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Beam Slab 11/16/2016 12/14/2016 28 days 3072 (21.19 Mpa)
B 11/16/2016 12/14/2016 28 days 3018 (20.81 Mpa)
C 11/16/2016 12/14/2016 28 days 3041(20.97 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __1221163845_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: December 21, 2016

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla December 21, 2016
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2nd floor 11/23/2016 12/21/2016 28 days 3033 (20.92 Mpa)
B 11/23/2016 12/21/2016 28 days 3096 (21.35 Mpa)
C 11/23/2016 12/21/2016 28 days 3080 (21.24 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __1229163846_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: December 29, 2016

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla December 29, 2016
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Column 2nd floor 12/1/2016 12/29/2016 28 days 3049 (21.03 Mpa)
B 12/1/2016 12/29/2016 28 days 3033 (20.92 Moa)
C 12/1/2016 12/29/2016 28 days 3072 (21.19 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __0105173847_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: January 5, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla January 5, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 12/8/2016 1/5/2017 28 days 3065 (21.13 Mpa)
B 12/8/2016 1/5/2017 28 days 3073 (21.19 Mpa)
C 12/8/2016 1/5/2017 28 days 3041 (20.97 Mpa)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __0109173848_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: January 9, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla January 9, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Roof Beam 12/12/2016 1/9/2017 28 days 3096 (21.34 Mpa)
B 12/12/2016 1/9/2017 28 days 3049 (21.02 Mpa)
C 12/12/2016 1/9/2017 28 days 3065 (21.13 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __0116173849_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: January 16, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla January 16, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Stair 12/19/2016 1/16/2017 28 days 3080 (21.23 Mpa)
B 12/19/2016 1/16/2017 28 days 3056 (21.07 Mpa)
C 12/19/2016 1/16/2017 28 days 3096 (21.34 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. No.: __0120173850_______
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: January 20, 2017

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of 2 2 Storey 8 CL School Building, Mambangnan NHS,


San Leonardo, Nueva Ecija 4th LD
Contractor: R.D. TALENS CONSTRUCTION & TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900(1)c1
Class: "A"
Source of Mixture: AT SITE
Sampled by: RAMON S. ANTOLIN September 23, 2016
(Name and Designation)
Submitted by: Ma. Jonalyn Orilla January 20, 2017
(Name and Designation) (Office) (Date)
Sample Part of Structure Date Date Age in Strength, psi.
Iden. Station Represented Sampled Tested Days Flexural,
Compressive
I A Flooring 12/23/2016 1/20/2017 28 days 3072 (21.19 Mpa)
B 12/23/2016 1/20/2017 28 days 3018 (20.81 Mpa)
C 12/23/2016 1/20/2017 28 days 3041(20.97 Mpa)
N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___2582675________ Dated:_3-14-2017_____ Amount:__A Part of P3,960.00____

Tested by: Checked by:

WILFREDO M. MATIAS ILUMINADA G. FLORES


Engineer II Material Engineer

Reviewed by: Attested by:

MARLON G. HERNANDEZ ULYSSES C. LLADO


Chief, Quality Assurance Section District Engineer

Witnessed by:

MA. JONALYN ORILLA


Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-071719-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: July 17, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. July 10, 2019
(Name and Designation)
Submitted by: Ronnie Talens July 17, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I A Trial Mix 7/10/2019 7/17/2019 7 days
2180 (15.03 Mpa.)
B 7/10/2019 7/17/2019 7 days
2190 (15.10 Mpa.)
C 7/10/2019 7/17/2019 7 days
2200 (15.17 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-081519-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 15, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. July 18, 2019
(Name and Designation)
Submitted by: Ronnie Talens August 15, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I Footing/Tie
A 7/18/2019 8/15/2019 28 days
Beam 3080 (21.24 Mpa.)
B 7/18/2019 8/15/2019 28 days
3057 (21.08 Mpa.)
C 7/18/2019 8/15/2019 28 days
3065 (21.14 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550866____ Dated:___1-9-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-082219-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 22, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. July 25, 2019
(Name and Designation)
Submitted by: Ronnie Talens August 22, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I A Column 7/25/2019 8/22/2019 28 days
3049 (21.03 Mpa.)
B 7/25/2019 8/22/2019 28 days
3096 (21.35 Mpa.)
C 7/25/2019 8/22/2019 28 days
3041 (20.97 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550866____ Dated:___1-9-2020_____ Amount:___A Part of P1,080.00___________
Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Office of the District Engineer Lab. NoRDT-082919-001
Nueva Ecija 2nd District Engineering Office
San Isidro, Cabanatuan City Date: August 29, 2019

TEST REPORT ON CONCRETE SAMPLES

Project : Construction of Multi-Purpose Building (Two Storey Evacuation Center)


at Brgy. Tagumpay, Gabaldon, Nueva Ecija
Contractor: R.D. TALENS CONSTRUCTION AND TRADING
Type of Specimen: Concrete Cylinder
Specimen Item No.: 900
Class: "A"
Source of Mixture: AT SITE
Sampled by: Ronnie Talens & Comp. August 1, 2019
(Name and Designation)
Submitted by: Ronnie Talens August 29, 2019
(Name and De (Office) (Date)
Sample
Part of StructureDate Date Age inStrength, psi.
Iden.
Station Represented
Sampled Tested Days Flexural,
Compressive
I A Beam/Slab 8/1/2019 8/29/2019 28 days
3018 (20.81 Mpa.)
B 8/1/2019 8/29/2019 28 days
3020 (20.82 Mpa.)
C 8/1/2019 8/29/2019 28 days
3030 (20.89 Mpa.)

N O T E : 1. Test result and other information herein indicated are based only on samples submitted and
information herein indicated must be evaluated by the project engineer concerned.
2. Test result and information herein indicated must be evaluated by the project engineer concerned.
3. This report is free from any erasures and/or alterations.
4. Paid under O.R. No. ___3550866____ Dated:___1-9-2020_____ Amount:___A Part of P1,080.00___________

Tested by: Checked by:

PETER L. MARQUEZ JOHN ADDI Y. LEABRES


Laboratory Technician I Laboratory Technician II

Reviewed by: Verified by:

ILUMINADA G. FLORES CARLOS M. LEABR


Material Engineer Chief, Quality Assura

Attested by:

Witnessed by: RICARDO M. PUN


District Engineer

AHMIE PALCONE
Contractor's Representative
80.00___________
6

80.00___________
6

80.00___________