Conduit and Wire Calculation

Specification:
MDB = Main Distribution Board TL = Tube light
SDB = Sub Distribution Board CF = Ceiling Fan
S = Switch Board AC = Air Conditioner
P = 3 Pin Plug Point SSL = Surface Spot Light

Table 18: Distance from Main Distribution Board to Sub Distribution Boards
Description Distance Description Distance Description Distance
MDB- 0’ MDB- 165’10” MDB- 200’6”
SDB1 SDB4 SDB7
MDB- 50’3” MDB- 181’9” MDB- 254’
SDB2 SDB5 SDB8
MDB- 103’2” MDB- 203’6” MDB- 276’11”
SDB3 SDB6 SDB9

Table 19: Distance form Sub Distribution Boards to various Switch Boards
Description Distance Description Distance Description Distance
SDB1-S1 29’2” SDB4-S12 41’7” SDB6-S23 1’
SDB1-S2 1’ SDB4-S13 40’7” SDB7-S24 17’2”
SDB1-S3 16’8” SDB4-S14 17’6” SDB7-S25 32’3”
SDB2-S4 1’ SDB4-S15 4’9” SDB8-S26 33’11”
SDB2-S5 1’5” SDB4-S16 2’4” SDB8-S28 1’
SDB2-S6 34’ SDB4-S17 26’8” SDB8-S30 31’5”
SDB2-S7 44’7” SDB5-S18 7’5” SDB9-S27 33’11”
SDB3-S8 44’9” SDB5-S19 59’ SDB9-S29 1’
SDB3-S9 1’ SDB5-S20 26’3” SDB9-S31 31’5”
SDB3-S10 1’5” SDB5-S21 64’7”
SDB3-S11 52’3” SDB6-S22
Table 20: Distance form Sub Distribution Boards to various Air-conditioners
Description Distance Description Distance Description Distance
SDB3-AC1 22’9” SDB-AC6 18’8” SDB-AC11 4’6”
SDB3-AC2 38’1” SDB-AC7 41’5” SDB-AC12 25’11”
SDB4-AC3 58’1” SDB-AC8 28’5” SDB-AC13 25’11”
SDB5-AC4 58’5” SDB-AC9 28’5”
SDB5-AC5 52’5” SDB-AC10 4’6”

*Distance from switch Boards to various loads and 3 Pin


Plugs:

Table 21: Room 206


Description Distance Description Distance Description Distance
S1-CF1 11’10” S1-TL1 22’9” S1-P1 3’
S1-CF2 20’2” S1-TL2 22’9”

Table 22: Room 205


Description Distance Description Distance Description Distance
S3-CF3 23’2’ S3-CF7 21’4’ S3-TL6 21’4”
S3-CF4 30’4” S3-CF8 28’6” S3-TL7 31’10”
S3-CF5 37’6” S3-TL4 29’8” S3-P2 3’
S3-CF6 14’2” S3-TL5 39’7”

Table 23: Room 204


Description Distance Description Distance Description Distance
S5-CF9 23’2” S5-CF13 21’4” S5-TL10 21’4”
S5-CF10 30’4” S5-CF14 28’6” S5-TL11 31’10”
S5-CF11 37’6” S5-TL8 29’8” S5-P3 3’
S5-CF12 14’2” S5-TL9 39’7’
Table 24: Room 203
Description Distance Description Distance Description Distance
S6-CF 23’2” S6-CF 21’4” S6-TL 21’4”
S6-CF 30’4” S6-CF 28’6” S6-TL 31’10”
S6-CF 37’6” S6-TL 29’8” S6-P4 3’
S6-CF 14’2” S6-TL 39’7’

Table 25: Room 202


Description Distance Description Distance Description Distance
S7-CF21 14’2” S7-TL17 31’10” S8-CF26 12’
S7-CF22 21’4” S7-P5 3’ S8-TL18 25’8”
S7-CF23 28’6” S8-CF24 26’4” S8-TL19 12’11”
S7-TL16 22’4” S8-CF25 19’2” S8-P6 17’6”

Table 26: Room 201


Description Distance Description Distance Description Distance
S10-CF27 15’4” S10-TL20 22’5” S10-P7 3’
S10-CF28 23’10” S10-TL21 30’11”

Table 27: Washroom attached to room 202


Description Distance Description Distance Description Distance
S11-CFL1 12’ S11-P8 3’ S11- 14’6”
Exhaust fan
1

Table 28: Ladies Washroom


Description Distance Description Distance Description Distance
S12-CFL2 12’ S12-CFL4 22’ S12-P9 3’
S12-CFL3 17’ S12-CFL5 27’ S12- 28’11”
Exhaust fan
2
Table 29: Gents Washroom
Description Distance Description Distance Description Distance
S13-CFL6 13’7” S13-CFL8 18’11” S13-P10 3’
S13-CFL7 19’7” S13-CFL9 24’11” S13- 31’6”
Exhaust fan
3

Table 30: Corridor and Staircase from 1st to 2nd floor


Description Distance Description Distance Description Distance
S2-TL3 35’10” S4-SSL4 19’6” S14-SSL8 57’7”
S2-SSL1 34’6” S4-SSL5 29’6” S14-SSL9 37’7”
S2-SSL2 19’6” S9-SSL6 29’6” S14-SSL10 17’7”
S4-SSL3 39’6” S9-SSL7 19’6”

Table 31: Room 207


Description Distance Description Distance
S15-CF29 20’11” S15-TL23 25’5”
S15-TL22 14’7” S15-P11 3’

Table 32: Room 208


Description Distance Description Distance
S16-CF30 19’4” S16-TL25 18’3”
S16-TL24 23’9” S16-P12 3’

Table 33: Lobby + Staircase from Ground floor to 1st floor


Description Distance Description Distance Description Distance
S17-SSL11 12’5” S22-TL32 42’5” S23-SSL18 9’2”
S17-SSL12 30’2” S22-SSL15 20’ S23-SSL19 27’5”
S17-SSL13 29’5” S22-SSL16 20’ S23-SSL20 42’5”
S17-SSL14 47’1” S22-SSL17 40’ S23-SSL21 60’2”
S17-P13 3’ S22-P18 3’ S23-P19 3’`
Table 34: Room 209 (Conference room-2)
Description Distance Description Distance Description Distance
S18-CF31 10’6’ S19-CF36 27’7” S20-P16 3’
S18-CF32 25’3” S19-TL28 0’ S21-CF40 13’5”
S18-CF33 35’5” S19-TL29 39’7” S21-CF41 21’9”
S18-TL26 12’ S19-P15 3’ S21-CF42 31’7”
S18-TL27 41’4” S20-CF37 13’10” S21-TL31 8’
S18-P14 3’ S20-CF38 21’11” S21-P17 3’
S19-CF34 19’ S20-CF39 38’9”
S19-CF35 30’ S20-TL30 28’7”

Table 35: Room 210 (Conference room-1)


Description Distance Description Distance Description Distance
S24-CF43 27’3” S27-CF56 50’9” S29-SSL49 36’6”
S24-CF44 12’6” S27-CF57 37’4” S29-SSL50 27’6”
S24-CF47 27’3” S27-CF58 28’4” S29-SSL51 18’6”
S24-CF48 20’11” S27-SSL34 59’11” S29-P25 3’
S24-SSL22 27’1” S27-SSL35 50’5” S30-CF67 17’10”
S24-SSL23 17’6” S27-SSL36 40’11” S30-CF68 27’4”
S24-SSL24 20’4” S27-SSL37 36’6” S30-CF69 40’4”
S24-P20 3’ S27-SSL38 27’6” S30-CF70 49’4”
S25-CF45 10’7” S27-SSL39 18’6” S30-SSL52 10’5”
S25-CF46 27’8” S27-P23 3’ S30-SSL53 19’9”
S25-CF49 19’6” S28-CF59 17’10” S30-SSL54 29’1”
S25-CF50 28’9” S28-CF60 27’4” S30-SSL55 33’6”
S25-SSL25 19’11” S28-CF61 40’4” S30-SSL56 42’6”
S25-SSL26 23’2” S28-CF62 49’4” S30-SSL57 51’6”
S25-SSL27 28’2” S28-SSL40 10’5” S30-P26 3’
S25-P21 3’ S28-SSL41 19’9” S31-CF71 59’9”
S26-CF51 17’8” S28-SSL42 29’1” S31-CF72 50’9”
S26-CF52 27’2” S28-SSL43 33’6” S31-CF73 37’4”
S26-CF53 40’2” S28-SSL44 42’6” S31-CF74 28’4”
S26-CF54 49’2” S28-SSL45 51’6” S31-SSL58 59’11’
S26-SSL28 10’5” S28-P24 3’ S31-SSL59 50’5”
S26-SSL29 19’9” S29-CF63 59’9” S31-SSL60 40’11”
S26-SSL30 29’1” S29-CF64 50’9” S31-SSL61 36’6”
S26-SSL31 33’6” S29-CF65 37’4” S31-SSL62 27’6”
S26-SSL32 42’6” S29-CF66 28’4” S31-SSL63 18’6”
S26-SSL33 51’6” S29-SSL46 59’11” S31-P27 3’
S26-P22 3’ S29-SSL47 50’5”
S27-CF55 59’9” S29-SSL48 40’11”

Table 36: Calculation of Conduit


Description Distance Description Distance Description Distance
MDB- 50’3” SDB3-S9 1’ SDB6-S22 41’
SDB2
SDB2- 58’11” SDB3-S8 31’ SDB7-S24 7’
SDB3
SDB3- 68’8” S8-S11 17’4” S24-S25 7’
SDB4
SDB4- 31’7” SDB4-S12 31’11” SDB8-S28 1’
SDB5
SDB3- 79’1” S12-S13 10’11” SDB8-S26 7’
SDB6
SDB6- 18’10” SDB4-S14 12’3” SDB8-S30 25’7”
SDB7
SDB7- 57’11” SDB4-S15 7’ SDB9-S27 7’
SDB8
SDB7- 81’7” SDB4-S16 8’4” SDB9-S29 1’
SDB9
SDB1-S1 29’2” SDB4-S17 7’ SDB9-S31 25’7”
SDB1-S2 1’ SDB5-S18 7’3” SDB3-AC1 12’9”
SDB1-S3 7’ SDB5-S19 46’7” AC1-AC2 16’10”
SDB2-S4 1’ SDB5-S20 20’8” S12-AC3 15’5”
SDB2-S6 7’ S20-S21 42’10” S23-AC6 1’6”
S6-S7 7’ SDB6-S23 1’ S24-AC7 1’6”
Room 206 38’6” Room 201 39’8” Corridor and 164’
Staircase(1st-2nd)
Room 205 79’6” Room 207 30’5” Lobby and 202’10”
Staircase(ground-
1st)
Room 204 79’6” Room 208 30’9” Gents, Ladies 70’11”
and room-
202(attached)
washroom
Room 203 79’6” Room 209 207’30”
Room 202 69’7” Room 210 635’6”

Cost Calculation
Table 37: Total cost for wire, conduit installation and accessories:
Serial Name of Item Qua824.25’ntity Rate(take Cost(taka)
No. per unit)
1 1/1.63 mm 1436’ 17.38 24957.68+10%=27453
wire
2 1/3.55 mm 407.5’ 15.70 6397.75+10%=7038
wire
3 1/1.80 mm 824.25’ 8.28 6824.9+10%=7507
wire
4 1/1.40 mm 2792’ 6.21 17338.32+10%=19072
wire
5 Conduit 2642’ 11.89 31413.38+10%=34554
6 TEE 103 6 618
7 Elbow 174 3 522
8 Junction box 32 35 3220
9 Circular box 47 6 282
10 Surface 35 135 4725
mounting
plastic box
11 Tube stand 32 140 4480
12 Switch board 31 200 6200
13 Switch 181 35 6335
14 Fuse 31 25 775
15 2 pin socket 31 28 868
16 3 pin socket 27 170 4590
17 Screw 2 box 220 440
18 Fan regulator 74 40 2960
19 Fire alarm 1 1200 1200
20 Distribution 10 35 350
board
21 Mini MCB 31 20 8370
22 Ceiling fan 74 1500 111000
23 Tube light 32 400 12800
24 CFL bulb 9 320 2880
25 Surface Spot 63 100 6300
light
26 Air- 13 60000 780000
conditioner(1
ton)
27 Exhaust fan 3 800 2400
Total 10,56,939

Labor Cost:
(i) Total number of load and plug points= 240
Labor cost= 150taka/load and plug point

(ii) Total number of distribution boards=10


Labor cost= 300 taka/distribution board

(iii) Total number of air-conditioners= 13


Labor cost= 500 taka/air conditioner
So, total labor cost= (240*150) + (10*300) + (13*500) taka
= 45500 taka

Table 38: Total Cost Calculation:


Serial No Cost Specification Cost (taka)
1 Wire, Conduit installation and 10,59,939
Accessories
2 Labor 45500
Total 11,02,439 or 11,02,500

Total cost for the installation of wiring and cost estimating of the 1st floor of
KUET SWC is = 11,02,500 Taka