Pasangan Batu Condensar
Pasangan Batu Condensar
Job No :
Client : PT. rekayasa industri
c Sand Fill
Length = 15.00 m
Widht = 1.50 m
High = 0.05 m
e. Man Powers
Foreman : 1.00 Man
Labour : 8.00 Man (untuk 1 area)
Mechanic : 1.00 Man
Remarks :
Project : Lahendong 5&6 Geothermal Power Plant Project
Job No :
Client : PT. rekayasa industri
Total all area = 21.5 m3 (U-Seal Pipe Pit Unit 5 & unit 6)
e. Man Powers
Foreman : 1.00 Man
Labour : 8.00 Man (untuk 1 area)
Mechanic : 1.00 Man
Remarks : sketch see method Drawing for U-seal Pipe Pit area
Signature
Date
Project : Lahendong 5&6 Geothermal Power Plant Project
Job No :
Client : PT. rekayasa industri
e. Man Powers
Foreman : 1.00 Man
Labour : 8.00 Man (untuk 1 area)
Mechanic : 1.00 Man
Signature
Date
Project : Lahendong 5&6 Geothermal Power Plant Project
Job No :
Client : PT. rekayasa industri
c Sand Fill
Length = 11.04 m
Widht = 2.10 m
High = 0.05 m
e. Man Powers
Foreman : 1.00 Man
Labour : 8.00 Man (untuk 1 area)
Mechanic : 1.00 Man
Remarks :
CONSTRUCTION METHODE
POURING CONCRETE TURBIN GENERATOR FOUNDATION
STAGE 1 (fc'-300 kg/cm2)
= 79.20 / 5.20
= 15.23 Hour
e. Man Powers
Foreman : 1.00 Man
Labour : 20.00 Man
Remarks :
Signature
Date
CONSTRUCTION METHOD
POURING CONCRETE TURBIN GENERATOR FOUNDATION
STAGE 1 (fc-300 kg/cm2)
Length = 11.00 m
Widht = 4.80 m
High = 1.50 m (Stage 1)
Produktivitas/hour/unit = 2.60 m3
= (A) / (B)
= 79.20 / 5.20
= 15.23 Hour
e. Man Powers
Foreman : 1.00 Man
Labour : 20.00 Man