2020-10-09 Catalog of Jingwei Electric
, Ltd
2 Composite insulator
B:Machining workshop
D: Composite insulator
workshop
Introduction to workshop
Machining workshop
With an area of 8000 square meters, 120 workers,40 sets
of CNC Lathes and other related machinery, annual
capacity: 2,600,000 sets .
Introduction to workshop
Composite insulators
• Select rods with straightness under 0.5mm/m; • Select Cam Lok coupling agent, scientific ratio
• Select rods with T-g over 140℃ • Select hot air circulation oven, suitable temperature and
• Select automatic centering injection mold baking time
• Use high-precision injection vulcanization device • Select rods without mould release agent
• Ultrasonic test coating thickness piece by piece • Temperature , pressure and time are controlled scientifically
• Prohibit workers from touching the area of the coating
compound by hand
Quality management:Crimping
Fiber glass content : 84%; Dual control of stroke and pressure
Rod end size:-0.05mm-0 Acoustic emission device
Roundness:≤0.02 mm Reasonable press dies
Hardness:HB 170-210
Thickness:5.5mm Average broken load of three pieces
Outer diameter:0-0.1mm shall meet X-3S≥L;
Inner diameter:0-0.08mm 50% SML tension test piece by piece
Inner hole:fine thread, alcohol cleaning
Advantages of JW composite insulator
Advantages
Fiber glass pass the epoxy resin adhesive groove Fiber glass pass the closed epoxy resin adhesive
at normal temperature and normal pressure to cabin under pressure of 8-10Mpa, which could ensure
soak the epoxy resin under the action of glass fiber glass soaking and mixing under both actions of
Automation
1 4 Excellent electromechanical
performance
Automatic mixing, accuracy within 1%;
No old epoxy resin adhesive Excellent
Static mixer, more evenly, no air bubble
electromechanical
No hand working, less labor cost performance
Technical Parameter of insulator core rod
Type test report of insulator core rod
Insulator end fittings
04
Machining process flowchart
Rough
process
before Process Clean &
H.D.G after H.D.G package
Quality management of H.D.G
Raw material
inspection
Process
inspection
Final
inspection
Production and Test equipment
05
Main production equipment---composite insulator
630 T 500 T
Crimping machine Injection moulding machine
Main production equipment---insulator core rod
Continuous furnace
Lightning impulse voltage generator & Power frequency withstand voltage generator
Thank You!