Halder

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

SANKAR HALDER

C/O- Ajit Samanta Mobile: +91-9968194620/9958162225

E-38, Ganesh Nagar, DELHI - 110092 E-Mail : sankarhalder75@gmail.com

OBJECTIVE .
Dedicated individual with in-depth experience in Metro construction, bridge and building
work. Currently looking for a civil Foreman job position with a progressive construction
company where my skill and experience will be fully utilized.

WORK EXPERIENCE .

 DESIGNATION : FOREMAN – CIVIL

COMPANY : YFC PROJECT PVT LTD

CLIENT : DMRC – Delhi Metro Rail Corporation

PROJECT : DMRC PROJECT CC-129 & 94, NOIDA

DURATION : FEB 2016 – PRESENT

JOB RESPOSIBILITY :

1. Execution of Pre-casted Segment and Parapet.

2. Execution of work at Viaduct including Pile Foundation, Pile Cap, Pier, Deck Slab and
Portal Beam.

3. Execution of Miscellaneous work including Crash Barrier, Median Crash Barrier,


Pedestal, Stopper etc.

4. Coordination with all level of staff for other proper execution of work.

5. Follow all safety and precautions to minimize the risk of an accident.

 DESIGNATION : FOREMAN – CIVIL

COMPANY : GAMMON INDIA LTD.

CLIENT – D.T.T.C – Delhi Tourism & Travel Corporation

PROJECT : WAZIRABAD SIGNATURE BRIDGE APPROACH - 8707 JOB

DURATION – MARCH 2010 – JAN 2016

Page 1 of 4
JOB RESPOSIBILITY :

1. Execution of Pre-casted Segment and RE Panel.

2. QA/QC Maintenance and Dispatch of PQC & DLC.

3. Proper levelling & alignment of Segment Bed.

4. Proper placing and fixing of reinforcement as per drawing.

5. Segment/Re-Panel shuttering levelling and fixing.

6. Concrete Pouring and surveying via Auto level.

7. Handle Client and satisfied them as per the requisition of work.

 DESIGNATION : JUNIOR EXECUTIVE

COMPANY : IJM INFRASTRUCTURE LTD

CLIENT : MCD – Municipal Corporation of Delhi

PROJECT : MCD CIVIC CENTRE, MINTO RROAD, NEW DELHI – 1 MULTI STOREY
BUILDING PROJECT 3B+G+28 STORIES

DURATION : OCT 2006 – FEB 2010

JOB RESPOSIBILITY :

1. Execution of work including PCC and Water Proofing.

2. Execution of Retaining wall, shear wall, column and slab.

3. Execution of Core wall and DOKA Shuttering including reinforcement fixing and shutter
alignment.

 DESIGNATION : SENIOR SUPERVISOR

COMPANY : IJM INFRASTRUCTURE LTD & NBCC JV

CLIENT : DMRC – Delhi Metro Rail Corporation

PROJECT : DMRC METRO RAIL PROJECT - Construction of elevated viaduct


between Barakhamba to Kirtinagar (8 KM)

DURATION – SEPT 2005 – OCT 2006

JOB RESPONSIBILTY :

1. Execution of Pre-casted Segment and Parapet.

2. Execution of ramp Work including Shuttering and concrete pouring.


Page 2 of 4
3. Coordination with all level of staff for other proper execution of work.

4. Follow all safety and precautions to minimize the risk of an accident.

 DESIGNATION : SUPERVISOR

COMPANY – GAMMON INDIA LTD

CLIENT : D.T.T.C – Delhi Tourism & Travel Corporation

PROJECT 1 – LAJPAT NAGAR FLYOVER AT DELHI (CLIENT DTDC)

PROJECT 2 – ROB BRIDGE, JAIPUR SITAPURA, RAJASTHAN

DURATION – FEB 2003 – AUG 2005

JOB RESPONSIBILTY ;

1. Execution of Precast segment, RE Wall ramp work.

2. Execution of drain Trough and service Trough.

3. Proper Levelling and Alignment of Segment Bed.

 DESIGNATION : SUPERVISOR

COMPANY – GAMMON INDIA LTD

CLIENT – G.R.E.F

PROJECT 1: ICHAMATI RIVER BRIDGE, BASIRHAT TO SANGRAMPUR, WEST BENGAL

PROJECT 2 : DIHUNG RIVER BRIDGE, HYUILANG, ARUNACHAL PRADESH

DURATION – MARCH 1998 – FEB 2003

JOB RESPONSIBILTY ;

1. SURVEYING – LEVELING by Auto level Instrument.

2. Execution Of Sinking Foundation, Well Cap, Pier & Pier Cap.

QUALIFICATION
.

 Diploma in Civil Engineering from RAJASTHAN UNIVERSITY in 2011.

 Additional Qualification: B.Com in 1997 from KOLKATA UNIVERSITY.

Page 3 of 4
DATE : PLACE : (SANKAR HALDER)

Page 4 of 4

You might also like