Curves - Summary
Curves - Summary
ETAP Page: 1
12.6.0H
Location: Date: 04-01-2021
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: HCSD11 Config.: Normal
Bus6 0.433 34.525 52.363 34.525 33.839 51.324 33.839 33.839 29.900 45.348 29.900 29.900 34.452 52.252 34.452 34.452
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
Project:
ETAP Page: 2
12.6.0H
Location: Date: 04-01-2021
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: HCSD11 Config.: Normal
Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus6 0.433 0.00531 0.00544 0.00760 0.00531 0.00544 0.00760 0.00578 0.00562 0.00807 0.00000 0.00000 0.00000