Professional Documents
Culture Documents
Leak Test DISA 200 Series 15 - 11 - 10
Leak Test DISA 200 Series 15 - 11 - 10
Machine
1. Close all bledervalves on the PP and SP Date
2. Zero point and speed has been adjusted.
3. Move the machine in manual . o p. 4
4. Make full stroke forward and return with PP and SP. o p. 5
5. Note the % you read in menu F8.4 for the operations.
o p. 3
o p. 6
PP cylinder check
PP forward (opr. 4)
Speed 9 8 7 6 5 4 3 2 1
% on F8.1 92.40 92.80 92.80 92.60 92.40 92.30 92.40 90.70 76.50
PP return (opr. 5)
% on F8.1 97.30 96.70 96.40 96.30 95.80 95.50 94.70 93.30 86.30
SP cylinder check
SP forward (opr. 3)
Speed 9 8 7 6 5 4 3 2 1
% on F8.1 87.00 86.80 86.40 85.00 83.10 81.80 72.10 61.90 20.00
SP return (opr. 6)
% on F8.1 104.00 103.80 104.00 104.30 104.40 103.40 101.00 98.70 78.30
Leak test DISA 230
Costomer 0
Machine 0
Date 15/10/06
105
100
Velosity in %
95
90
85
80
9 8 7 6 5 4 3 2 1
Speed selected
OP 4 OP 5 OP 3 OP 6
Speed selected
OP 4 OP 5 OP 3 OP 6