Digital HR Project RAID Log Emplate V1.0
Digital HR Project RAID Log Emplate V1.0
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Project Details Date: 02/23/2021 Page: 1 of 11
Digital HR Project Project RAID Log - Version History
Project Name: Digital HR Project
Project ID: CM-P234
Project Sponsor: Belinda Kieran-Ejimadu
Project Manager: Naandi Ibrahim
Version No: V0.1
Issue Date: 18/02/2021
Reporting as at Date: 19/02/2021
Version
Version No: Date: Revised By: Description of change
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Version History Date: 02/23/2021 Page: 2 of 11
Digital HR Project Risk Log
RAID Log Prepared by Kieran Ejimadu - Systems Analyst
Reporting as at Date: 18/02/2021
Project Manager: Naandi Ibrahim
Status
Probability /
Impact/
Risk RAG
Likelihood
Project ID Risk Date Risk Originator Risk Impact Risk Owner Mitigating & Contingency Action Action Action Action Risk Reporting Level Xref with
Consequence
ID Raised Description Assessment (Responsible) Action(s) Owner Due Status Completed Status other RAID
(Raised By) Carried Out and/or Date Date items, CRs
"The Risk is that…" (Y/N) Comments/ Status Update etc.
Impact/
Project ID Assum Action Status Reporting Level
Likelihood
Probability /
Date Assumption Assumption Assumption Action Required - Description Action Action Action Assumption Xref with
Consequence
RAG Status
Assumption
ption ID Raised Originator Description Owner Owner Due Completed Status other RAID
(Conducts and/or Date Date items, CRs
[Made By) "The project assumes that…." Analysis) etc.
Comments/ Status Update
CM-P234 AS1 16-Jan-21 Kieran Ejimadu That key business resources will be available to 2 4 Kieran Ejimadu Liaise with relevant dept managers to ensure that Kieran Ejimadu 2-Mar-21 Open 20-Mar-21 Open Project Steering Group R01
work on the project. the proposed project team have capacity to work
R on the project
CM-P234 AS2 16-Jan-21 Kieran Ejimadu The intranet will be designed using its own branding 2 4 Kieran Ejimadu Liaise with relevant dept managers to ensure that Kieran Ejimadu 2-Mar-21 Open 20-Mar-21 Open Project Team R01
and theme, and the internal facing content the proposed project team have capacity to work
R on the project
CM-P234 AS3 16-Jan-21 Kieran Ejimadu Functional areas will be responsible for determining 2 4 Kieran Ejimadu Liaise with relevant dept managers to ensure that Kieran Ejimadu 2-Mar-21 Open 20-Mar-21 Open Project Steering Group R01
what content needs to be protected via access rights. the proposed project team have capacity to work
R on the project
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Assumptions Log Date: 02/23/2021 Page: 4 of 11
CM-P234
#N/A
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Assumptions Log Date: 02/23/2021 Page: 5 of 11
Digital HR Project Issues Log
Priority
Project ID Issue Date Issue Issue Issue Owner Planned Resolution Action Action Action Action Issue Reporting Level Xref with
ID Raised Originator Description (Responsible) Action(s) - Description Owner Due Status Completed Status other RAID
(Identified By) and/or Date Date items, CRs
Comments/ Status Update etc.
CM-P234 I01 16-Jan-21 Kieran Ejimadu Key business resources do not have 1 Kieran Ejimadu Escalate to EOG/Board so that resources' time Naandi Ibrahim 3-Mar-21 Open 1-Mar-21 Open Project Sponsor CR01
enough capacity to complete project tasks is freed up to work on the project
CM-P234 I02 11-Jan-21 Kieran Ejimadu Remote login for project teams logging 2 Kieran Ejimadu Ensure that team members are intimated earlier Kieran Ejimadu Open Open Project Team CR02
impeded due to technical problems about meeting times and their systems are set
up and tested prior to online meeting
CM-P234 I03
CM-P234 I04
CM-P234 I05
CM-P234 I06
CM-P234 I07
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Issues Log Date: 02/23/2021 Page: 6 of 11
CM-P234
CM-P234
CM-P234
CM-P234
CM-P234
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Issues Log Date: 02/23/2021 Page: 7 of 11
Digital HR Project Dependency Log
Status
Project ID Depend Date Dependency Dependency
Probability /
Likelihood
Impact/
Consequence
Dependency Owner Dependency Receiver Dependency Dependency On Dependency Reporting Level Xref with
Dependency RAG
Internal / External
ency ID Raised Originator Description (Responsible for (Who is Dependent on Due Date Delivered On Target? Status other RAID
& delivery) delivery) Date items, CRs
(Raised By) Comments/ Status Update etc.
CM-P234 D01 15-Jan-21 Kieran Ejimadu New company logo to be issued by 4 4 Internal A. Pierson, Corporate Naandi Ibrahim, 12-Mar-21 G Open Project Sponsor CR01
Corporate Affairs to be used by project. R Affairs Project Team Member
CM-P234 D02 15-Jan-21 Kieran Ejimadu The Intranet Project is dependent on the 4 4 Internal K. Ejimadu, Project Team Naandi Ibrahim, 3-Mar-21 G Open Project Team CR02
decisions made about content migration to Project Team Member
the public website, and the navigation links
from the public website to content. R
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Dependencies Log Date: 02/23/2021 Page: 8 of 11
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
CM-P234
#N/A
Filename: file:///conversion/tmp/scratch/511181453.xlsx
Worksheet: Dependencies Log Date: 02/23/2021 Page: 9 of 11
PROBABILITY (% age possibility of occurrence)
1 2 3 4 5
Rare Unlikely Possible Likely Almost certain
(0%-10%) (11%-34%) (35%-55%) (56%-80%) (81%-99%)
Insignificant -
unimportant impact. A
nuisance
1
Minor - slight or small
impact on the project.
Disruptive but does not
threaten fundamentals
2
IMPACT OF RISK OCCURRING
Moderate -medium
impact to project time
cost and quality.
3