1.1 Project Management 1.2 Pre-Construction: Wbs Id Task Name 1 Overall Project
1.1 Project Management 1.2 Pre-Construction: Wbs Id Task Name 1 Overall Project
1.1 Project Management 1.2 Pre-Construction: Wbs Id Task Name 1 Overall Project
1 Overall Project
1.1 Project Management
1.1.1 Manage Project(Planning) 127
1.2 Pre- construction
1.2.1 Site identification 21
1.2.2 Outline of project construction 87
1.2.3 Contracts 32
1.2.4 Permits 30
1.2.5 Funds(Finanial strategy) 52
1.3 Procurement (Phase 1)
1.3.1 Solar modules 50
1.3.2 Inverters(micro) 50
1.3.3 Cleaning system 37
1.3.4 Machinary 32
1.4 Installation(Phase 2)
1.4.1 Equipments 22
1.4.2 Solar panels 48
1.4.3 Transformers 59
1.4.4 Grid 62
1.4.5 Micro inverters 20
1.4.6 Electrical system 65
1.4.7 Monitoring system 58
1.4.8 Robotic panel cleaner 28
1.5 Water discharge
1.5.1 Discharge of water logged 28
1.6 Inspection
1.6.1 Physical inspection 30
1.6.2 Files inspection 30
1.6.3 Technical inspection 30
1.7 Post -Inspection
1.7.1 Closeout Documentation 28
1.7.2 Inspection Documentation 28
Predecessors
5
3
3
3
5,6
5,6,9
5,6,9
5,6,9
6,14
5,6
6,14
6,14
6,14
6,14
6,14
15
10,15
15,16,17,18,19,20,21,22,23
15,16,17,18,19,20,21,22,23
27,28,29
27,28,29
Resource Name Standard Rate Overtime Rate
Prakhar Tyagi (Project Manager) 1,50000/mon 0
Sumit sharma (Head of planning & coordination team) 200000/mon 0
Sunil Patel ( AGM-CIVIL) 150000/mon 0
Manoj Kumar( quality manager) 150000/mon 0
Venkatesh(Asst. Manager) 1,30000/mon 0
vikash(site engineer) 1,20000/mon 0
Shubham(GM-project control manager) 500000/mon 0
Rajesh Kumar(GM-Procurement) 300000/mon 0
Uday(GM-techno commercial logistic ) 1.25000/mon 0
Karan(Engineering manager) 250000/mon 0
Randhir ji( Electrical supervisor) 90000/mon 0
Anurag(Project Director) 3,50000/mon 0
Land ₹ 1,200.00 0
vehicle ₹ 4,000.00 0
Piling machine ₹ 1,500.00 0
trucks ₹ 3,000.00 0
JCB machine ₹ 2,000.00 0
Tractors ₹ 14,000.00 0
solar modules ₹ 300,000.00 0
micro inverters ₹ 14,000.00 0
cables ₹ 11,000.00 0
transformers ₹ 200,000.00 0
Robotic system ₹ 95,000.00 0
Drivers ₹ 800.00 0
Cargo ships ₹ 500,000.00 0
WBS ID Task Name Work Est (days)
1 Overall Project
1.1 Project Management
1.1.1 Manage Project(Planning) 127
1.2 Pre- construction
1.2.1 Site identification 21
1.2.2 Outline of project construction 87
1.2.3 Contracts 32
1.2.4 Permits 30
1.2.5 Funds(Finanial strategy) 52
1.3 Procurement (Phase 1)
1.3.1 Solar modules 50
1.3.2 Inverters(micro) 50
1.3.3 Cleaning system 37
1.3.4 Machinary 32
1.4 Installation(Phase 2)
1.4.1 Equipments 22
1.4.2 Solar panels 48
1.4.3 Transformers 59
1.4.4 Grid 62
1.4.5 Micro inverters 20
1.4.6 Electrical system 65
1.4.7 Monitoring system 58
1.4.8 Robotic panel cleaner 28
1.5 Water discharge
1.5.1 Discharge of water logged 28
1.6 Inspection
solar modules
micro inverters
Robotic system
Piling machine,JCB machine,transformers, cables
vikash(site engineer)
Prakhar Tyagi (Project Manager) Sumit sharma (Head of planning & coordination team)
Prakhar Tyagi (Project Manager) Sumit sharma (Head of planning & coordination team)
Prakhar Tyagi (Project Manager) Sumit sharma (Head of planning & coordination team)
Prakhar Tyagi (Project Manager) Sumit sharma (Head of planning & coordination team)
Prakhar Tyagi (Project Manager) Sumit sharma (Head of planning & coordination team)
Sunil Patel Manoj Kumar( quality manager) Anuraj(Project Director
Sunil Patel Manoj Kumar( quality manager) Anuraj(Project Director
Sunil Patel Manoj Kumar( quality manager) Anuraj(Project Director