Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja

Contract Agreementy no: CE(AF)G/JAM/39 OF 2018-2019

Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja

Client: Military Engineer Services

NOMINAL MIX CONCRETE 1:2:4(M-15) USING 20MM G

ITEM No. As PER CU M UNIT


Per CA
CEMENT KG
FINE AGGREGATE KG
COARSE AGGREGATE KG
57
20MM KG
10MM KG
WATER KG

Date of testing Applied


S.NO Date of Casting
(7 days) Load(KN)

1 6/16/2020 6/23/2020 305


2 315
3 317
4 320
5 312
6 325
LAB ENGG Contractor's Rep.

Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja


Contract Agreementy no: CE(AF)G/JAM/39 OF 2018-2019
Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja
Client: Military Engineer Services

NOMINAL MIX CONCRETE 1:4:8(M-7.5) USING 40MM G

ITEM No. As PER CU M UNIT


Per CA
CEMENT KG
FINE AGGREGATE KG
COARSE AGGREGATE KG
58
40MM KG
20MM KG
WATER KG

S.NO Date of Casting Date of testing Applied


(7 days) Load(KN)
1 6/19/2020 6/26/2020 150
2 160
3 178
4 184
5 185
6 183
LAB ENGG Contractor's Rep.

Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja


Contract Agreementy no: CE(AF)G/JAM/39 OF 2018-2019
Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja
Client: Military Engineer Services

NOMINAL MIX CONCRETE 1:3:6(M-10) USING 20MM G

ITEM No. As PER CU M UNIT


Per CA
CEMENT KG
FINE AGGREGATE KG
COARSE AGGREGATE KG
71
20MM KG
10MM KG
WATER KG

Date of testing Applied


S.NO Date of Casting (7 days) Load(KN)
1 6/23/2020 6/30/2020 250
2 240
3 235
4 220
5 230
6 240

LAB ENGG Contractor's Rep.

Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja


Contract Agreementy no: CE(AF)G/JAM/39 OF 2018-2019
Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja
Client: Military Engineer Services

NOMINAL MIX CONCRETE 1:2:4(M-15) USING 40MM G

ITEM No. As PER CU M UNIT


Per CA
CEMENT KG
FINE AGGREGATE KG
COARSE AGGREGATE KG
74
40MM KG
20MM KG
WATER KG

S.NO Date of Casting Date of testing Applied


(7 days) Load(KN)
1 6/26/2020 7/3/2020 380
2 350
3 315
4 322
5 325
6 328

LAB ENGG Contractor's Rep.

Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja


Contract Agreementy no: CE(AF)G/JAM/39 OF 2018-2019
Name of Work : Resurfacing OF Runway and allies works services at AF station,Ja
Client: Military Engineer Services

NOMINAL MIX CONCRETE 1:3:6(M-10) USING 40MM G

ITEM No. As PER CU M UNIT


Per CA
CEMENT KG
FINE AGGREGATE KG
COARSE AGGREGATE KG
84
40MM KG
20MM KG
WATER KG

S.NO Date of Casting Date of testing Applied


(7 days) Load(KN)
1 6/30/2020 7/7/2020 200
2 212
3 215
4 228
5 225
6 230

LAB ENGG Contractor's Rep.


works services at AF station,Jamnagar

2019

works services at AF station,Jamnagar

M-15) USING 20MM GRADED AGG

WT TOTAL WT OF
CONCRETE
313
689
1377
2579
702
675
200

Applied 7 Days AVG STRENGTH Date of testing Applied 28 Days


Load(KN) compressive (Mpa) (28 days) Load(KN) compressive
strength strength
305 13.56 7/7/2020 420 18.67
315 14.00 429 19.07
317 14.09 415 18.44
320 14.22 411 18.27
312 13.87 432 19.20
14.03
325 14.44 430 19.11
14.03

J.E.() Engg-in-charge

works services at AF station,Jamnagar


2019
works services at AF station,Jamnagar

M-7.5) USING 40MM GRADED AGG

WT TOTAL WT OF
CONCRETE
168
600
1500
2419
765
735
151

7 Days 28 Days
Applied compressive AVG STRENGTH Date of testing Applied compressive
Load(KN) strength (28 days) Load(KN) strength
150 6.67 7/17/2020 245 10.89
160 7.11 235 10.44
178 7.91 243 10.80
184 8.18 238 10.58
185 8.22 220 9.78
7.70
183 8.13 238 10.58
J.E.() Engg-in-charge

works services at AF station,Jamnagar


2019
works services at AF station,Jamnagar

M-10) USING 20MM GRADED AGG

WT TOTAL WT OF
CONCRETE
219
700
1401
2468
714
687
148

7 Days 28 Days
Applied compressive Date of testing Applied compressive
Load(KN) AVG STRENGTH (28 days) Load(KN)
strength strength
250 9.11 7/21/2020 300 13.33
240 10.67 350 15.56
235 10.44 310 13.78
220 9.78 325 14.44
230 9.72 328 14.58
9.73
240 8.67 323 14.36

J.E.() Engg-in-charge

works services at AF station,Jamnagar


2019
works services at AF station,Jamnagar

M-15) USING 40MM GRADED AGG

WT TOTAL WT OF
CONCRETE
313
590
1476
2579
753
723
200

7 Days 28 Days
Applied compressive AVG STRENGTH Date of testing Applied compressive
Load(KN) strength (28 days) Load(KN) strength
380 16.89 7/24/2020 380 16.89
350 15.56 375 16.67
315 14.00 390 17.33
322 14.31 399 17.73
325 14.44 402 17.87
14.96
328 14.58 405 18.00

J.E.() Engg-in-charge

works services at AF station,Jamnagar


2019
works services at AF station,Jamnagar

M-10) USING 40MM GRADED AGG

WT TOTAL WT OF
CONCRETE
219
700
1401
2468
714
687
148

7 Days 28 Days
Applied compressive AVG STRENGTH Date of testing Applied compressive
Load(KN) strength (28 days) Load(KN) strength
200 8.89 7/28/2020 320 14.22
212 9.42 330 14.67
215 9.56 310 13.78
228 10.13 330 14.67
225 10.00 345 15.33
9.70
230 10.22 342 15.20

J.E.() Engg-in-charge
28 Days AVG STRENGTH
compressive (Mpa)
strength
18.67
19.07
18.44
18.27
19.20
18.79
19.11
18.79

28 Days
compressive AVG STRENGTH
strength
10.89
10.44
10.80
10.58
9.78
10.51
10.58
28 Days
compressive AVG STRENGTH
strength
13.33
15.56
13.78
14.44
14.58
14.34
14.36
28 Days
compressive AVG STRENGTH
strength
16.89
16.67
17.33
17.73
17.87
17.41
18.00
28 Days
compressive AVG STRENGTH
strength
14.22
14.67
13.78
14.67
15.33
14.64
15.20