ZUARI OPC 53 CEMENT CONCRETE MIX DESIGN SUMMARY WITH CICO PLAST HS-K504 & CICO PLAST SUPER-C300

Slump in Compressive
DATE OF TESTING PROPORTION FINAL BATCH WEIGHT PER CUM IN KG mm strength
ADMIXURE
S.No RFI No. GRADE DATE OF CASTING W/C CEMENT BRAND Remarks
BRAND After 30 After 1
7 DAYS 28 DAYS 20:10 CA:FA cement WATER ADMIXURE 20 10 SAND Initial minuits hour 7 DAYS 28 DAYS

CICO PLAST
1 211 M20 Kerb 3/12/2014 10/12/2014 31/12/2014 0.50 ZUARI OPC-53 40:60 50:50 320 181 2.24 397 595 935 40 27 38.4
HPS-504

CICO PLAST
2 211 M25 Rcc 3/12/2014 10/12/2014 31/12/2014 0.45 ZUARI OPC-53 60:40 58:42 330 166.5 3.63 698 465 792 140 95 55 29.9 39.1
HPS-504

CICO PLAST
3 209 M30 Rcc 2/12/2014 9/12/2014 30/12/2014 0.45 ZUARI OPC-53 60:40 58:42 350 175.5 3.85 685 455 776 160 100 65 34.2 44.9
HPS-504

CICO PLAST
4 209 M35 Rcc 2/12/2014 9/12/2014 30/12/2014 0.43 ZUARI OPC-53 60:40 58:42 380 180.4 4.56 669 445 759 175 140 100 39.9 48.2
HPS-504

CICO PLAST
5 208 M35 Rcc 30/11/2014 7/12/2014 28/12/2014 0.40 ZUARI OPC-53 60:40 58:42 400 177 4.4 666 443 756 180 150 115 41.4 48.7 MJB
HPS-504

M35 CICO PLAST


6 208 1/12/2014 8/12/2014 29/12/2014 0.40 ZUARI OPC-53 60:40 58:42 410 181 4.5 659 439 749 Collapse 170 120 43.5 48.4
PILES HPS-504

CICO PLAST
7 207 M40 Rcc 30/11/2014 7/12/2014 28/12/2014 0.38 ZUARI OPC-53 60:40 58:42 430 180 4.3 654 435 741 185 160 120 45.1 53.8
HPS-504

CICO PLAST
8 207 M50PSC 29/11/2014 6/12/2014 27/12/2014 0.29 ZUARI OPC-53 60:40 58:42 510 165 3.06 645 430 732 Collapse 165 125 55.2 66.8
SUPER-C300

CICO PLAST
9 207 M45 PSC 29/11/2014 6/12/2014 27/12/2014 0.30 ZUARI OPC-53 60:40 58:42 500 167 3.0 646 430 733 Collapse 160 120 53.3 62.5
SUPER-C300

Contractor's Representative Concessionaire Representative I.E Representative