Water Pipe Replacement
Water Pipe Replacement
Water Pipe Replacement
Payment Clause
1.10 8.30
1.1.1 8.3.1
1.1.2 8.3.2
8.3.2.1
8.3.2.2
1.20 8.40
1.2.1 8.4.1
8.4.2
1.2.2 8.4.2.1
1.2.3 8.4.2.2
1.2.4 8.4.3
1.2.5 8.4.4
1.40 8.60
1.4.1
1.4.2
1.50 8.80
1.5.1 8.8.2
1.5.2 8.8.6
1.5.3 8.8.4
1.5.5
2.10 8.2.1
2.30 8.2.10
3.10 8.3.2
3.20 8.3.3
3.2.1 8.3.3.1
3.30 8.3.3.3
3.70
4.10 8.2.1
4.20 8.2.2.3
4.30 8.2.4
5.10 8.2.1
5.20 8.2.2
5.2.1 8.2.2
5.2.2 8.2.2
5.2.3 8.2.2
5.30 PSL 8.2.19
5.3.1
5.3.2 PSL 8.2.19
5.40 8.2.4
5.50 8.2.15
5.60
5.8.1
5.10.1
6.10 8.2.2
6.1.1
6.1.2
6.1.3
6.20 8.2.3
6.30 8.2.6
6.40 8.2.4
6.50 8.2.5
6.60
6.70 8.2.8
FIXED-CHARGE ITEMS
0.00
c) Temporary protection of existing services Prov. Sum 1.00
0.00
d) Community Liaison Officer Prov. Sum 1.00
0.00
e) Provision of photographic records Prov. Sum 1.00
0.00
f) Landscaping and including irrigation system Prov. Sum 1.00
0.00
g) Relocation of existing services Prov. Sum 1.00
0.00
h) Training of local labour Prov. Sum 1.00
0.00
i) Alterations and connection to Municipal services and
repair to damaged services where approved by Prov Sum 1.00
Engineer
0.00
b) 4x4 hr 5.00
0.00
Walk behind vibrating rollers
0.00
a) Model BW 61 (small) hr 5.00
0.00
b) Model BW 76 (medium) hr 5.00
Compactors 0.00
a) Wacker hr 5.00
0.00
b) Plate compactor hr 5.00
0.00
Compressors (Potable Diesiel Compressor) 0.00
0.00
a) Small hr 5.00
0.00
b) Medium hr 5.00
0.00
c) Large hr 5.00
0.00
Portable water pumps 0.00
a) Small hr 5.00
0.00
b) Medium hr 5.00
0.00
c) Large hr 5.00
0.00
ARD TO SUMMARY
0.00
SCHEDULE 2: SITE CLEARANCE 0.00
0.00
Clear and grub (2 metre width) m 3,891.00
0.00
Protection of trees as ordered by Engineer No 2.00
0.00
Remove topsoil to nominal depth of 150mm and
m3 60.00
stockpile for re-use as directed by Engineer
0.00
Removal of man-made surfaces, stockpile materials
0.00
for later re-use
0.00
a) Footways and driveways 0.00
0.00
i) Asphalt (≤ 50mm thickness) m2 88.00
0.00
ii) Asphalt (≥ 50 - 100mm thickness) m2 20.00
0.00
iii) Interlocking concrete segmental paving blocks (all
m2 380.00
colours)
0.00
iv) Concrete slabs (450 x 450mm) m2 180.00
0.00
v) Brick paving m2 50.00
0.00
vi) Grassing and vegetation m2 110.00
0.00
vii) Unreinforced concrete <75mm thick m³ 5.00
0.00
viii) Reinforced concrete <75mm thick m³ 1.00
0.00
ix) Kerbing (All types of kerbs) m 950.00
0.00
x) Dump rock/Stone pitching m³ 29.04
0.00
Backfilling and reinstatement of man-made surfaces 0.00
0.00
0.00
i) Interlocking concrete segmental paving blocks (all
m2 1,050.00
colours)
0.00
ii) Concrete slabs (450 x 450mm) m2 280.00
0.00
iii) Brick paving m2 16.00
0.00
iv) Grassing and vegetation m2 280.00
0.00
v) Kerbing (All types of kerbs) m 550.00
0.00
vi) Dump rock/Stone pitching m³ 29.04
a) Backfilling and reinstatement of footways and
0.00
driveways using new materials
0.00
i) Asphalt (≤ 50mm thickness) m2 10.00
0.00
ii) Asphalt (≥ 50 - 100mm thickness) m2 20.00
0.00
iii) Interlocking concrete segmental paving blocks (all
m2 2,496.00
colours)
0.00
iv) Concrete slabs (450 x 450mm) m2 210.00
0.00
v) Brick paving m2 4.00
0.00
vi) Grassing and vegetation m2 310.00
0.00
vii) Unreinforced concrete <75mm thick m³ 65.00
0.00
viii) Reinforced concrete <75mm thick m³ 20.00
0.00
ix) Kerbing (All types of kerbs) m 250.00
0.00
x) Dump rock/Stone pitching m³ 181.50
0.00
ARD TO SUMMARY
0.00
SCHEDULE 3: EARTHWORKS (PIPE TRENCHES) 0.00
0.00
Excavation 0.00
0.00
Excavate in all material for trenches, shore and
dispose of surplus material using labour intensive 0.00
construction methods for the depths of:
0.00
a) Over 0,0m and up to 1,5m m 2,895.00
0.00
b) Over 1,5m and up to 2,5m m 10.00
0.00
c) Over 2,5m m 0.00
0.00
Excavate by hand in all material for tie-ins, house
connections, backfill and compact including disposal of
surplus unsuitable material for depth:
0.00
a) Over 0,0m and up to 1,0m m³ 60.00
0.00
b) Over 1,0m and up to 1,5m m³ 85.00
0.00
c) Over 1,5m m³ 181.50
0.00
Extra over Item 3.1.1 above for : Please refer to PSD
3.1.3 for Classification of materials for hand 0.00
excavations
0.00
a) Intermediate excavation. m³ 995.00
0.00
b) Hard excavation. m³ 30.00
0.00
c) Rock excavation m³ 15.00
0.00
Excavation Ancillaries 0.00
0.00
Make up deficiency in backfill material (Provisional) 0.00
0.00
a) from other necessary excavations on site m³ 730.00
0.00
b) by importation from designated borrow pits m³ 10.00
0.00
c) by importation from commercial or off site sources
m³ 110.00
selected by the Contractor
0.00
a) Additional compaction to 95% mod AASHTO
m³ 60.00
density in road crossings
0.00
a) Services that intersect a trench 0.00
0.00
i) Water house connections. No. 20.00
0.00
ii) Sewer pipes up to 300mm Dia. No. 10.00
0.00
iii) Cables. No. 10.00
0.00
iv) Stormwater pipes up to 1050mm dia. No. 5.00
0.00
v) Kerbs and Channels No. 14.00
0.00
vi) Water pipes of any diameter No. 335.00
0.00
b) Services that adjoin a trench 0.00
0.00
i) Water house connections m 280.00
0.00
ii) Sewer pipes up to 300mm Dia. m 12.00
0.00
iii) Cables. m 730.00
0.00
iv) Stormwater pipes up to 1050mm dia. m 10.00
0.00
v) Kerbs and Channels m 25.00
0.00
vi) Water pipes of any diameter m 16.00
0.00
Services that require special care No 4.00
0.00
Trimming of tree roots on pipe alignment( This item will
No 15.00
be measured as number of trees)
0.00
ARD TO SUMMARY
0.00
SCHEDULE 4: BEDDING (PIPES) 0.00
0.00
Provision of bedding from trench excavation 0.00
0.00
a) Selected granular material m³ 2,130.00
0.00
b) Selected fill material m³ 550.00
0.00
c) Extra over item 4.1(a) and (b) for sieving where
m³ 210.00
ordered by Engineer
0.00
Provision of bedding imported from commercial
0.00
sources (Provisional)
0.00
a) Selected granular material m³ 10.00
0.00
b) Selected fill material m³ 15.00
0.00
c) 19mm Crushed stones bedding m³ 20.00
0.00
Encasing of pipe in 20MPa concrete (Provisional) m³ 10.00
0.00
ARD TO SUMMARY
0.00
0.00
SCHEDULE 5: MEDIUM PRESSURE PIPELINES 0.00
0.00
Supply, lay, bed (class B bedding), test and disinfect,
backfill complete with victaulic couplings denso 0.00
wrapped, high impact uPVC Class 16 pipes:
a) DN110 m 3,891.00
b) DN160 m 0.00
c) DN200 m
d) DN250 m
e) DN315 m
f) DN355 m
Extra-over for 5.1 for the supply, lay and bedding of
0.00
Steel Specials with couplings:
0.00
a) Shouldered end Steel Bends including thrust blocks
0.00
to suit high impact uPVC pipe:
DN110 0.00
i) 11.5° No 24.00
0.00
ii) 22.5° No 18.00
0.00
iii) 45° No 14.00
0.00
iv) 90° No 8.00
DN160 0.00
i) 11.5° No 0.00
0.00
ii) 22.5° No 0.00
0.00
iii) 45° No 0.00
0.00
iv) 90° No 0.00
DN200 0.00
i) 11.5° No 0.00
0.00
ii) 22.5° No 0.00
0.00
iii) 45° No 0.00
0.00
iv) 90° No 0.00
DN250 0.00
i) 11.5° No 0.00
0.00
ii) 22.5° No 0.00
0.00
iii) 45° No 0.00
0.00
iv) 90° No 0.00
DN315 0.00
i) 11.5° No 0.00
0.00
ii) 22.5° No 0.00
0.00
iii) 45° No 0.00
0.00
iv) 90° No 0.00
DN355
i) 11.5° No
ii) 22.5° No
iii) 45° No
0.00
a) Tying new 110mm-160mm uPVC/HDPE into
No 21.00
existing steel/HDPE pipe of any size:
0.00
b) Tying new 200mm-2500mm uPVC/HDPE into
No 0.00
existing steel/HDPE pipe of any size:
0.00
c) Tying new 315mm-355mm uPVC/HDPE into
No 0.00
existing steel/HDPE pipe of any size:
0.00
Construction of road crossing using Horizontal
Directional Drilling (HDD) in soft and intermediate 0.00
material for any depth
0.00
a) DN110 (HDPE pipe, Class 16 PE100 SDR 11) m 210.00
0.00
b) DN160 (HDPE pipe, Class 16 PE100 SDR 11) m 0.00
0.00
c) DN180 (HDPE pipe, Class 16 PE100 SDR 11) m 0.00
0.00
d) DN200 (HDPE pipe, Class 16 PE100 SDR 11) m 0.00
0.00
e) DN250 (HDPE pipe, Class 16 PE100 SDR 11) m 0.00
0.00
f) DN315 (HDPE pipe, Class 16 PE100 SDR 11) m 0.00
0.00
g) DN355 (HDPE pipe, Class 16 PE100 SDR 11) m 0.00
0.00
Extra over item 5.7 for Horizontal Direction Drilling in
m 22.00
rock material
0.00
Excavate in all materials Launching and reception
m³ 36.00
shafts
0.00
Recover valves, fittings, specials etc and deliver to the
0.00
respective Depot.
0.00
a) Valves & hydrants of all sizes No 20.00
0.00
0.00
a) 110mm m 0.00
b) 160mm m 0.00
c) 180mm m 0.00
d) 200mm m 0.00
e) 250mm m 0.00
f) 315mm m 0.00
g) 355mm m 0.00
0.00
Excavate in all materials Launching and reception
m³ 0.00
shafts
0.00
Supply and install PRV complete with all fittings,
including PRV Chamber as per Standard Drawing 0.00
JW1000-STD-PRV01 to 04
a) 100mm diameter No 0.00
0.00
b) 150mm diameter No 0.00
0.00
c) 200mm diameter No 0.00
0.00
d) 250mm diameter No 0.00
0.00
e) 300mm diameter No 0.00
0.00
0.00
ARD TO SUMMARY
0.00
SCHEDULE 6: ERF CONNECTIONS (WATER) 0.00
0.00
Supply, lay and test HDPE Class 16, PE100 SDR11
Erf connections (Rate to include all compression
0.00
fittings for connecting to the main line and the water
meter)
a) Using open trench construction 0.00
0.00
i) 25mm dia. connections m 744.00
ii) 32mm dia. connections m 66.00
iii) 40mm dia. connections m 0.00
iv) 63mm dia. connections m 0.00
0.00
b) Using trenchless methods Horizontal Directional
Drilling (The following rates should cover everything 0.00
except launch and reception pits
0.00
i) 25mm dia. connections m 0.00
0.00
ii) 32mm dia. connections m 0.00
0.00
iii) 40mm dia. connections m 0.00
0.00
iv) 63mm dia. connections m 0.00
0.00
Excavate in all materials Launching and reception
m³ 6.00
shafts
0.00
Extra over items 6.1 for specials 0.00
0.00
Saddles (to suit High Impact uPVC pipes) 0.00
0.00
i) 110mm x 25mm No 79.00
0.00
ii) 110mm x 32mm No 99.00
0.00
ii) 110mm x 40mm No 0.00
0.00
iv) 110mm x 63mm No 0.00
0.00
i) 160mm x 25mm No 0.00
0.00
ii) 160mm x 32mm No 0.00
0.00
ii) 160mm x 40mm No 0.00
0.00
iv) 160mm x 63mm No 0.00
0.00
v) 200mmx 25mm No 0.00
0.00
vi) 200mm x 32mm No 0.00
0.00
vii) 200mmx 40mm No 0.00
0.00
viii) 200mm x 63mm No 0.00
0.00
Stopcock (Supply and install brass ball/gate valve
stopcock, rate to include all fittings to connect to the 0.00
HDPE pipes)
0.00
i) 25mm No 79.00
0.00
ii)32mm No 99.00
0.00
iii) 40mm No 0.00
0.00
iv) 63mm No 0.00
0.00
0.00
0.00
i) 15mm Class C above ground domestic water meters
(rate to include all fittings for connecting to the erf No 0.00
connection)
0.00
ii) 20mm Class C above ground domestic water
meters (rate to include all fittings for connecting to the No 310.00
erf connection)
0.00
iii) 32mm Class C above ground (in a box) domestic
water meters (rate to include all fittings for connecting No 0.00
to the erf connection)
0.00
iv) 32mm Class B above ground bulk water
meters(rate to include all fittings for connecting to the No 0.00
erf connection as per detail JW100-DET09-W01
0.00
v) 40mm Class B above ground bulk water meters(rate
to include all fittings for connecting to the erf No 4.00
connection as per detail JW100-DET09-W01
0.00
vi) 63mm Class B above ground bulk water
meters(rate to include all fittings for connecting to the No 6.00
erf connection as per detail JW100-DET09-W01
0.00
Site testing of water meters, where ordered by
Prov Sum 1.00
Engineer (Provisional)
Profit on item 6.5 above % 0.00
i) Markings for valves and hydrants No 31.00
0.00
ii) Marker posts valves and pipeline No 31.00
0.00
ARD TO SUMMARY
SUBTOTAL
ESCALATION (10%)
SUBTOTAL
CONTINGENCIES (10%)
SUBTOTAL
VAT (15%)
TOTAL
ne
0.00 0.00
0.00 350,000.00 0.00
0.00 0.00
0.00 350,000.00 0.00
0.00 0.00
0.00 0.10 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 32.01 0.00
0.00 0.00 0.00
0.00 40.00 0.00
0.00 0.00
0.00 45.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 200.00 0.00
0.00 0.00
0.00 250.00 0.00
0.00 0.00
0.00 350.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 250.00 0.00
0.00 0.00
0.00 300.00 0.00
0.00 0.00
0.00 350.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 300.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 320.00 0.00
0.00 0.00
0.00 350.00 0.00
0.00 0.00
0.00 400.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 400.00 0.00
0.00 0.00
0.00 450.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 450.00 0.00
0.00 0.00
0.00 0.10 0.00
0.00 0.00
0.00 460.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 110.00 0.00
0.00 0.00
0.00 120.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 110.00 0.00
0.00 0.00
0.00 150.00 0.00
0.00 0.00
0.00 220.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 90.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 110.00 0.00
0.00 0.00
7,000,000.00
0.00 0.00
0.00 190.00 0.00
0.00 0.00
0.00 200.00 0.00
0.00 0.00
0.00 250.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 150.00 0.00
0.00 0.00
0.00 250.00 0.00
0.00 0.00
0.00 450.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 90.00 0.00
0.00 0.00
0.00 180.00 0.00
0.00 0.00
0.00 350.00 0.00
0.00 0.00
0.00 380.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 500.00 0.00
0.00 0.00
0.00 500.00 0.00
0.00 0.00
0.00 500.00 0.00
0.00 0.00
0.00 500.00 0.00
0.00 0.00
0.00 500.00 0.00
0.00 0.00
0.00 500.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 0.00 500.00 0.00
0.00 0.00
0.00 300.00 0.00
0.00 0.00
4,950.00
0.00
0.00
0.00
3,060.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 9,500.00 0.00
0.00 15,000.00 0.00
0.00 24,000.00 0.00
0.00 34,000.00 0.00
0.00 48,000.00 0.00
0.00 93,000.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 1,000.00 0.00
0.00 1,100.00 0.00
0.00 1,200.00 0.00
0.00 1,500.00 0.00
0.00 2,500.00 0.00
0.00 3,000.00 0.00
0.00 0.00
0.00 0.00
0.00 1,000.00 0.00
0.00 1,100.00 0.00
0.00 1,200.00 0.00
0.00 1,500.00 0.00
0.00 2,500.00 0.00
0.00 3,000.00 0.00
0.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 5,000.00 0.00
0.00 5,000.00 0.00
0.00 6,000.00 0.00
0.00 7,000.00 0.00
0.00 8,000.00 0.00
0.00 9,000.00 0.00
0.00 0.00
0.00 5,000.00 0.00
0.00 5,000.00 0.00
0.00 6,000.00 0.00
0.00 7,000.00 0.00
0.00 8,000.00 0.00
0.00 9,000.00 0.00
0.00 0.00
0.00 5,000.00 0.00
0.00 6,000.00 0.00
0.00 7,000.00 0.00
0.00 8,000.00 0.00
0.00 9,000.00 0.00
0.00 10,000.00 0.00
0.00 0.00
0.00 5,000.00 0.00
0.00 6,000.00 0.00
0.00 7,000.00 0.00
0.00 8,000.00 0.00
0.00 9,000.00 0.00
0.00 10,000.00 0.00
0.00 0.00
0.00 5,000.00 0.00
0.00 6,000.00 0.00
0.00 7,000.00 0.00
0.00 8,000.00 0.00
0.00 9,000.00 0.00
0.00 10,000.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 6,000.00 0.00
0.00 0.00
0.00 7,500.00 0.00
0.00 0.00
0.00 9,000.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 1,800.00 0.00
0.00 0.00
0.00 2,100.00 0.00
0.00 0.00
0.00 2,400.00 0.00
0.00 0.00
0.00 2,500.00 0.00
0.00 0.00
0.00 2,800.00 0.00
0.00 0.00
0.00 3,900.00 0.00
0.00 0.00
0.00 4,500.00 0.00
0.00 0.00
0.00 1,000.00 0.00
0.00 0.00
0.00 350.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 450.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00 34.00 34.00 80.00 2,720.00
0.00 80.00 0.00
0.00 90.00 0.00
0.00 100.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 490.00 0.00
0.00 0.00
0.00 500.00 0.00
0.00 0.00
0.00 550.00 0.00
0.00 0.00
0.00 600.00 0.00
0.00 0.00
0.00 230.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 600.00 0.00
0.00 0.00
0.00 600.00 0.00
0.00 0.00
0.00 600.00 0.00
0.00 0.00
0.00 600.00 0.00
0.00 0.00
0.00 770.00 0.00
0.00 0.00
0.00 770.00 0.00
0.00 0.00
0.00 770.00 0.00
0.00 0.00
0.00 1,700.00 0.00
0.00 0.00
0.00 850.00 0.00
0.00 0.00
0.00 850.00 0.00
0.00 0.00
0.00 850.00 0.00
0.00 0.00
0.00 850.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 6,980.00 0.00
0.00 0.00
0.00 0.00
0.00 150,000.00 0.00
0.00 0.10 0.00
0.00 450.00 0.00
0.00 0.00
0.00 700.00 0.00
0.00 0.00
2,720.00
7,000,000.00
675.00
4,950.00
3,060.00
13,275.00
2,720.00
0.00 7,024,680.00
0.00 702,468.00
0.00 7,727,148.00
772,714.80
8,499,862.80
0.00 1,274,979.42
0.00 9,774,842.22
Parkmore Phase 2
SCHEDULE DESCRIPTION
SUMMARY OF SCHEDULES:
SCHEDULE 1: PRELIMINARY AND GENERAL
SCHEDULE 3: EARTHWORKS
SCHEDULE 4: BEDDING
SUB-TOTAL 1
SUB TOTAL
SUB TOTAL
VAT (15%)
TOTAL
Amount (R.c)
R 7,000,000.00
R 675.00
R 4,950.00
R 3,060.00
R 13,275.00
R 2,720.00
R 7,024,680.00
R 702,468.00
R 6,322,212.00
R 6,322,212.00
R 948,331.80
R 7,270,543.80