LAMPIRAN 4C PENAWARAN

HARGA DASAR SATUAN UPAH


No. URAIAN KODE SATUAN HARGA KETERANGAN
SATUAN
( Rp.)

1 Pekerja (L01) Jam 10,020.00


2 Tukang (L02) Jam 14,500.00
3 Mandor (L03) Jam 16,330.00
4 Operator (L04) Jam 16,330.00
5 Pembantu Operator (L05) Jam 11,270.00
6 Sopir / Driver (L06) Jam 14,390.00
7 Pembantu Sopir / Driver (L07) Jam 11,150.00
8 Mekanik (L08) Jam 14,500.00
9 Pembantu Mekanik (L09) Jam 11,270.00
10 Kepala Tukang (L10) Jam 16,330.00
HARGA DASAR SATUAN BAHAN
No. URAIAN KODE SATUAN HARGA KETERANGAN
SATUAN ( Rp.)

1 Pasir Beton (Kasar) M01a M3 246,000.00


2 Pasir Pasang (Sedang) M01b M3 207,950.00
3 Pasir Urug (ada unsur lempung) M01d M3 154,850.00
4 Batu Kali M02 M3 195,000.00
5 Agregat Kasar M03 M3 222,000.00
6 Agregat Halus M04 M3 241,000.00
7 Batu Belah / Kerakal M06 M3 195,000.00
8 Bahan Tanah Timbunan M08 M3 38,692.00
9 Aspal M10 KG 10,430.00
10 Semen Holcim/ PC (50kg) M12 Zak 57,070.70
11 Semen Holcim/ PC (kg) M12 Kg 1,141.41
12 Kawat Beton M14 Kg 21,280.60
13 Paku M18 Kg 17,411.40
14 Kayu Perancah M19 M3 1,257,490.00
15 Bahan Agr.Base Kelas B M27 M3 232,152.00
16 Aspal Emulsi M31 Kg 11,607.60
17 Baja Tulangan (Polos) U24 M39a Kg 16,444.10
18 Batu Pecah (5-7 cm) (M101) M3 207,969.50
19 Campuran Panas Latasir (M102) Ton 1,400,100.00
20 Air Liter 386.92
HARGA DASAR SATUAN PERALATAN
No. URAIAN KODE HP HARGA KETERANGAN
SATUAN ( Rp.)

1 ASPHALT SPRAYER E03 4 60,146.42


2 COMPRESSOR 4000-6500 L\M E05 60 204,533.72
3 CONCRETE MIXER 0.3-0.6 M3 E06 20 161,050.64
4 DUMP TRUCK 3.5 TON E08 100 331,840.25
5 MOTOR GRADER >100 HP E13 135 639,820.00
6 THREE WHEEL ROLLER 6-8 T E16 55 251,716.51
7 TANDEM ROLLER 6-8 T. E17 82 390,596.83
8 WATER TANKER 3000-4500 L. E23 100 321,218.89
9 TAMPER E25 4.7 44,885.61
10 ASPHALT LIQUID MIXER E34 5 40,484.44
11 ASPHALT DISTRIBUTOR E41 115 346,482.03
12 CONCRETE PAN MIXER E43 134 412,098.82
13 TRUK MIXER (AGITATOR) E49 220 595,805.18