CHECKLIST FOR DUCT WORK

Drawing No: Date:


Project Code: Project Name:
Location:
Requirement as per Contract
SR NO Parameters Checked Specifications YES NO NA REMARKS
Approved
1 Approved drawing layout used at site

Approved make of GI sheet used as per specfication GI Sheet – Jindal,120gsm,24G


For supply ducts 19mm
2 For return ducts 13mm

MS angle frames as per specification


3 MS angle frames of 2 coats red oxide and black enamel paint

Given Duct hanger supports as per specification MS angle of 20x20x3 with 2 coats of primer and enamel paint
should be given at intervals of 2.5m
4
For supply ducts 19mm
Insulation provided as per given specification For return ducts 13mm
5 For joints 3mm thick AL foiled tape

1. Anchor fastner of fisher make for hanging T-rod of 8mm


Tightned all duct fittings as per approved specification 2.All ducts pieces having companion angle flanged joints
connected together with GI nuts of 8mm and bolts of M6x25mm
at about 150 mm centers.
6 3.All flanges connected to ducts by revits of size 12
Used Gasket as per given specification Food graded neoprane gasket of 5mm thick should be provided at
7 flange connections
Food graded silicon based sealent to be applied on all transverse
8 Applied sealent as per specification and longitudinal seams
Inline fans installed as per approved drawing and GI cabinet type centrifugal inline fans to be mounted in between
9 specification the supply and return ducts
1.volume control dampers of extruded type
10 Installed dampers as per approved drawing and specification 2.Fire dampers of fusible link type
Installed plenum boxes as per approved drawing and Plenum boxes to be installed in with vcd for exchange of air
11 specification
Note : It is ensured that all nuts and bolts are properly tightned