Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

FINAL DOCUMENTATION PACKAGE

Petrex Rig 5802


Rapid Rig Package

Section 1.2
Rig General
Arrangement Drawings

www.nov.com
Final Documentation Package S.O. Number: MC7112701
Petrex Rig 5802 – Rapid Rig #7 Page: 1 of 1

Rig General Arrangement Drawings


The drawings and parts list provided are selected drawings intended to provide a general view of component part
locations, overall dimensions and other information for conducting operations and maintenance. Some of the
included drawings may also include parts list to help identify replacement component parts and illustrate their
relationship and fit with surrounding parts.

Drawings are generally divided into three (3) types:


• Layout and/or Assembly drawings - These are basic drawings, which may or may not be
drawn to scale. They are intended to provide information on relative positioning in relationship
to other items in the assembly or layout. Sometimes these may include overall dimensions
and relationship dimensions, use only the dimensions provided and do not attempt to scale
from the drawing.
• Part Drawings - These drawings may or may not be drawn to scale. Sometimes these will
include overall dimensions and relationship dimensions, use only the dimensions provided
and do not attempt to scale from the drawing.
• Schematic Diagrams - These drawings typically use symbols and diagrams to provide flow
and overall logic information. Schematics are seldom to scale and usually provide very little
dimensioning information.

CAUTION

All information provided on these drawings is “AS BUILT”. Any


changes or field modifications, that may have taken place, WILL
NOT BE REFLECTED on these drawings.

Drawing Number* Description

M220004747-01-GAD-001-01; Rev. 01 Rig General Arrangement

M220004747-02-GAD-001-01; Rev. 01 Ground Pressure Loading

M220004748-01-GAD-001-01; Rev. 01 Mast General Arrangement

M220004749-01-GAD-001; Rev. 01 Substructure General Arrangement (2 Sheets)

M220004750-01-GAD-001; Rev. 01 Pipehandling General Arrangement (2 Sheets)

M220004750-01-SCH-001; Rev. 01 Pipe Erector Hydraulic Schematic

M220004750-01-SCH-001; Rev. 02 Tubular Loading System

You might also like