Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

WINTHROX LABORATORIES PVT.

LTD
QUALITY ASSURANCE DEPARTMENT

Title:- STANDARD OPERATING PROCEDURE Document #


Subject:- SOP FOR LIQUID INJECTABLE EHS OBJECTIVES
Issue Date: 23-01- Review Date: Reversion #: 00 Supersedes:
2021
Prepared by: Checked by: Reviewed by: Approved by:

MUNEEBA
MALICK

1.0 OBJECTIVE:
To frame a procedure of ESH in liquid injectable area during operation.

2.0 SCOPE:
This SOP applicable to liquid injectable area during operation.

3.0 RESPONSIBILITY:
Operator, Department Incharge, EHS Member

4.0 ACCOUNTABILITY:
Head of Department

5.0 PROCEDURE:
5.1 Fix and maintain loose, improper connections, electrical outlets, switches, extension cords and
cracked wire.
5.2 Fire extinguisher must be place to avoid combustion due to steam or fire.
5.3 Collector box and brush must be present separately to avoid cutaneous injury due to
broken glass and glass particles.
5.4 Separate wiper must be present to avoid water stagnation.
5.5 Personals should wear safety goggles during filling and molding operations.
5.6 Designated person for fumigation should wear the chemical cartridge or respirator.
5.7 Humidity must be controlled.
5.8 Area must be cleaned as per SOP.
5.9 Tool box must present with all necessary tools.
5.10 First aid box must be present.

Change History:-

Sr. # Revision no. Effective date Reason

01

02

03

Distribution:-

Page 1 of 2
WINTHROX LABORATORIES PVT. LTD
QUALITY ASSURANCE DEPARTMENT

Title:- STANDARD OPERATING PROCEDURE Document #


Subject:- SOP FOR LIQUID INJECTABLE EHS OBJECTIVES
Issue Date: 23-01- Review Date: Reversion #: 00 Supersedes:
2021
Prepared by: Checked by: Reviewed by: Approved by:

MUNEEBA
MALICK

Documents Distributed to Signature with date

Master Quality Assurance Manager

Copy Production Manager

Page 2 of 2

You might also like