Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

WINTHROX LABORATORIES PVT.

LTD
EHS DEPARTMENT

Title:- STANDARD OPERATING PROCEDURE Document # :


Subject:- SOP FOR CONSERVATION OF ENERGY EHS/SOP/017
Issue Date: 01-01-2021 Review Date: 01-01-2023 Revision #: 00 Supersedes: NIL
Prepared by: Checked by: Reviewed by: Approved by:
Officer Production Executive RA AM Compliance Plant Manager

1.0 SCOPE
This SOP is for Conservation of energy in plant.

2.0 PURPOSE
The purpose of this SOP is to reduce the consumption of energy by using less of an energy
service.

3.0 RESPONSIBILITY
* Production Officer
* EHS Manager
* Plant Manager

4.0 PROCEDURE

4.1. Switching off the light when person is not present in the area.
4.2. Ensure shut off machinery when not in use.
4.3. Ensure air condition are set to the optimum points according to the season.
4.4. Lighting load shifts to the solar panel.

5.0 CHANGE HISTORY:

Sr. # Revision no. Effective date Reason


01 00 New
02

6.0 DISTRIBUTION:

Documents Distributed to Signature with date


Master EHS Department
Copy Compliance Department

7.0 REFERENCE:
 Nebosh
 ISO 45001
WINTHROX LABORATORIES PVT. LTD
EHS DEPARTMENT

Title:- STANDARD OPERATING PROCEDURE Document # :


Subject:- SOP FOR CONSERVATION OF ENERGY EHS/SOP/017
Issue Date: 01-01-2021 Review Date: 01-01-2023 Revision #: 00 Supersedes: NIL
Prepared by: Checked by: Reviewed by: Approved by:
Officer Production Executive RA AM Compliance Plant Manager

You might also like