Internal Remotely Electric Tilt

(iRET)

Operation instruction

Thank you for purchasing iRET modules. Please read this operation instruction
carefully before use, and keep it properly for future inspection.
Contents
1. Product introduction ........................................................................... 1
2. Installation Steps.................................................................................. 1
3. Engineering applications.....................................................................3
4. Portable electric antenna control operation instruction................. 3
4.1 Set up the test environment of PCU.........................................3
4.2 PCU operation instruction.......................................................... 4
5. Fault product replacement.................................................................. 6
Notes........................................................................................................... 7
6. Troubleshoot..........................................................................................8
1. Product introduction
Internal Remotely Electric Tilt (hereinafter referred to as iRET)
is designed based on AISG2.0 standard. It can adjust the signal
coverage of the antenna effectively and improve the quality of
communication services by controlling the antenna electric tilt
remotely. iRET module is designed as pluggable independent unit,
and easy to install and replace.
Components are shown as follow:

① ② ③ ④ ⑤

①Screw: Tighten the iRET module


②Male connector: The daisy chain in
③Hand shank: Plug the iRET module
④LED indicator light: Indicate the working state
(Green light indicates it is working normally, red light indicates it is
working abnormally.)
⑤Female connector: The daisy chain out

2. Installation Steps
Step 1: insert the iRET module into the antenna along the rail.

1
antenna

Step 2: tighten the screws and fasten the iRET module.

① ①screw
④ ②male connector
antenna


③ ③female connector
② ④female connector

⑤handing nut

Step 3: When connecting the control cable, match the guide slot of
the cable connector with the feather key of the male connector,
then tighten manually.

①the feather key of the male connector Tighten the joint and hold
②the guide slot of the female connector thread by hand, then rotate
① ② clockwise until tight.

2
3. Engineering applications
A flow diagram is shown below:

Turn on ALD Scan Add

Turn on the switch Test whether the link Add all scanned devices
to energize the iRET, is normal, discern all to the base station
configure proper online equipments controller
threshold of power
consumption alarm

Set tilt Calibrate Load config data

Set the tilt according Match the iRET track The iRET module has been
to the requirement with the antenna configured, if the config data
angle range is not matched, reload the
config file

4. Portable electric antenna control unit (PCU) operation


instruction

4.1 Set up the test environment of PCU


As shown below, connect Portable electric antenna control
unit(hereinafter referred to as PCU)with AISG control cable.

3
4.2 PCU operation instruction

PCU AISG port Switch Power port AISG cable male connector

Connect the male connector of AISG cable with AISG port of PCU.

4
Scan devices

Turn on PCU, press"1" or "2", select


language, press "OK" to scan iRET
Add & decline key

Working light Select operating UID

After scan, Press "CLR" , return to


Digit key select interface, press Add/decline
key to select operating UID, press
Return key "OK" to enter operating interface

Calibrate

After entering the operation


interface, press "3" to enter the
calibration form. The max angle, min
Return to angle and sector number is default,
original form key so press "OK" until the calibration
executes
Confirm key
Set tilt

After entering the operation


interface, press"2"to enter angle
setting form, press or to
Add & decline key:select device or set tilt
select angle
Working light:when PCU energized,Light W
will twinkle, when issue order, Light R、T、W
: The rise of 0.1 degree per pressing,
will twinkle alternately
hold on the button for continuous rise.
Digit key: select language and order
Up to 20 degree, and then back to the
Return key(CLR):back to previous level
0 degree
Return to original form key(FUN):
: The decline of 1.0 degree per
return to language selection interface
pressing, hold on the button for
Confirm key(OK):confirm the order
continuous decline. Down to 0 degree,
and then back to 20 degree

Get tilt

After entering the operation


interface, press "1" to get current
tilt

5
5. Fault product replacement
! The iRET module has completed the antenna-related
information configuration before leaving the factory (such as angle
range etc). Before replacing, please check whether the label
information of the new iRET module matches the antenna
information of the module to be replaced.
The steps of replacement are shown below:
Step 1: rotate the screw anti-clockwise to remove the screw. As
shown below:

Loosen Get out

Step 2: insert the new iRET module along the guide rails into the
antenna, tighten the screws clockwise, and re-connect the AISG
control cable. As shown below: Connect AISG cable

Insert Tighten

Note: If the UID of the new iRET module and the UID of the faulted
iRET module are not consistent, you can contact with customer
service (Tel: +86-0755-86186110) and provide the UID array
number (red dotted line as below) on the back of the original
antenna. Our company will arrange technical staff to change the
UID array number though the remote assistance or you can change
the UID array numbers by the tools that we provide. Antenna array

6
numbers are shown as the below picture:

! Notes

1. When the connector of the control cable has been tightened,


pinch the holding nut by hand and rotate clockwise. Do not use
tools, and avoid the control cable needle broken, etc.
2. When the connector of the control cable has been tightened, it is
strictly prohibited to rotate the part of the non-holding nut. It can
avoid the male needle faulty and so on.
3. After assembling the iRET module, the control cable connector
should be wrapped with a waterproof tape and an anti-aging
tape.
4. When the iRET assembly is completed, on-site testing is needed
to ensure the iRET module work properly.
5. The AISG cable should be fixed with tie tape every two meters.
And the control cable should be protected and not to be
damaged.
6. If adjust the antenna through the PCU, when adjustment is
completed, the control cable between the controller and the
iRET module should be dismounted and placed well.

7
6. Troubleshooting

Connect iRET to Node B,


make sure connection is ok
连接 iRET 与基站,确保连接
合格
N
Y
Is the connection between iRET
N and Node B properly done?
Can Node B detect iRET? Is the control cable intact?
Is the power supply appropriate?
基站是否检测到 iRET?
iRET 与基站是否正确连接?
Y
控制电缆是否完好无损?
基站供电是否正常?
Y
Is iRET calibration N Does the power supply
successful? keep normally during
calibration?
iRET 是否成功校准?
校准期间供电是否正常?

Y Y
Is the interface of
Is iRET motor rotating
control cable or iRET Y
intact? normally?
Set tilt successful? N 控制电缆或 iRET 接口是 电机是否运转正常?
是否成功设置下倾角?
否完好无损?
Y
N N
Y Does the power
Replace the control Replace iRET module
supply keep
normally during cable iRET module 更换模块
tilt setting? 更换控制电缆或模块
设置角度期间供
电是否正常?

Does configuration file


Is the tilt accurate? N No calibration,
of iRET match the antenna?
下倾角设置是否准确? Replace antenna
iRET 配置文件与天线是否匹
无法校准,更换天线
配?
Y
N
Re-download antenna
Operation complete
file to iRET
操作完成 重新下载天线配置文
件到 iRET