Schedul Instalasi Mesin Produksi
Schedul Instalasi Mesin Produksi
B PENGERINGAN
1 PRESS DRYER 15 OPENING (SOLID PLATTEN) 4 UNIT READY TO INSTAL/NOT REPAIRING V V V V
2 THERMAL OIL CAPACITY 2,500.000 KCAL 1 UNIT READY TO INSTAL/NOT REPAIRING V V V V
3 COMPOSER / COR VEENER BUILDER 1 UNIT
4 PAVING COR
C PLAYWOOD MAKING / BARANG JADI PLAY WOOD
1 GLUE SPREADER 2 UNIT V V
2 GLUE MIXER TANK CAPACITY 125 LTR 2 UNIT V V
STEEL STRUCTURE ABOVE GLUE MIXING 1 V V
3 TABLE LIFTER 6 UNIT V V
4 COLD PRESS 500 TON 4 UNIT V V V V
5 HOT PRESS PLAYWOOD 15 OPENING/DAYLIGHT SOLID PLATEN Q345-500T 2 UNIT READY TO INSTAL/NOT REPAIRING V V
TABLE LIFTER 2 UNIT V V
6 THERMAL OIL CAPACITY 1,200,000 KCAL 1 UNIT
7 SANDING CLIBRATION 1 BOTTOM AND ONE TOP HEAD IN/OUT CONVEYOR 1 UNIT V
8 AUTOMATIC DOUBLE SIZER 4 X 8 KIKUKAWA 1 UNIT PEMBELIAN/REKONDISI LIA TEKNIK V
9 SANDING FINISH 3 HEAD HEAVY DUTY IN/OUT CONVEYOR 1 UNIT READY TO INSTAL/NOT REPAIRING V
TABLE LIFTER 3 UNIT V
HEAVY DUTY DEAD ROLLER 3 M (ESTIMASI) 60 UNIT
10 COMPRESOR 50 HP 1 UNIT V
11 DUST COLECTOR PORTABLE / PEMBUATAN 4 UNIT V V V V V V
12 JARINGAN DAN INSTALASI LISTRIK V V V V V V V V V V V V V
13 FINAL CROSS CHEK ALL MACHINE V
14 TRIAL PROCCES V V
15 FORKLIT 3 TON 3 UNIT PEMBELIAN
16 REKRUT PERSONIL MANTENANCE ( SUPERVISOR & TEKNISI) 7 ORANG V V V V V
17 REKRUT KARYAWAN (OPERATOR) V V V V V
18 REKRUT KARYAWAN ( HELPER) V V V V V