Special Specification IBRD - Strategic Roads Infrastructure Project

SECTION VI - 2A
SPECIAL SPECIFICATIONS

TABLE OF CONTENTS

PREAMBLE........................................................................................................... SS - i

DIVISION 1 GENERAL

SECTION 1.8 MAINTENANCE OF TRAFFIC FLOW


1.8.1 GENERAL.......................................................................................... SS - 1 - 1
1.8.2 TRAFFIC MANAGEMENT AND SAFETY PLAN.......................... SS - 1 - 1
1.8.3 MATERIAL AND EQUIPMENT DESCRIPTION............................ SS - 1 - 5
1.8.4 TEMPORARY ROAD AND BRIDGE WORKS............................... SS - 1 - 10
1.8.5 MAINTENANCE FOR TRAFFIC SAFETY...................................... SS - 1 - 11
1.8.6 MEASUREMENT AND PAYMENT................................................. SS - 1 - 11

SECTION 1.9 FIELD ENGINEERING


1.9.1 GENERAL.......................................................................................... SS - 1 - 14
1.9.2 FIELD SURVEY FOR MINOR REVISION ……………………….. SS - 1 -
14
1.9.3 ROUTINE CONSTRUCTION SURVEY WORKS............................ SS - 1 - 16
1.9.4 SETTING OUT OF WORK................................................................ SS - 1 - 16
1.9.5 SPECIALIST FIELD ENGINEERING PERSONNEL....................... SS - 1 - 17
1.9.6 QUALITY CONTROL OF MATERIALS.......................................... SS - 1 - 17
1.9.7 BASIS OF PAYMENT....................................................................... SS - 1 - 17

SS.1.19 RELOCATION OF EXISTING UTILITIES AND SERVICES


1.19.1 DESCRIPTION................................................................................... SS - 1 - 19
1.19.2 ARRANGEMENTS WITH LOCAL AUTHORITIES........................ SS - 1 - 19
1.19.3 INSPECTION OF WORK AND RELOCATION OF FACILITIES... SS - 1 - 19
1.19.4 SCHEDULING OF WORK................................................................ SS - 1 - 20
1.19.5 EXECUTION...................................................................................... SS - 1 - 20
1.19.6 MEASUREMENT AND PAYMENT................................................. SS - 1 - 21

SS. 1.20 AS-BUILT DRAWINGS


1.20.1 GENERAL.......................................................................................... SS - 1 - 23
1.20.2 BASIS OF PAYMENT....................................................................... SS - 1 - 23

DIVISION 3 EARTHWORKS

SS. 3.4 GEOTEXTILE


3.4.1. DESCRIPTION................................................................................... SS - 3 - 1
3.4.2 REFERENCE DOCUMENT.............................................................. SS - 3 - 1

SS - i
Special Specification IBRD - Strategic Roads Infrastructure Project

3.4.3 MATERIALS...................................................................................... SS - 3 - 2
3.4.4 PHYSICAL AND CHEMICAL REQUIREMENTS........................... SS - 3 - 2
3.4.5 CERTIFICATION............................................................................... SS - 3 - 3
3.4.6 SAMPLING, TESTING, AND ACCEPTANCE................................ SS - 3 - 3
3.4.7 SHIPMENT AND STORAGE............................................................ SS - 3 - 5
3.4.8 CONSTRUCTION.............................................................................. SS - 3 - 6
3.4.9 MEASUREMENT AND PAYMENT................................................. SS - 3 - 7

SS. 3.5 VERTICAL DRAIN


3.5.1. DESCRIPTION................................................................................... SS - 3 - 8
3.5.2 MATERIALS...................................................................................... SS - 3 - 8
3.5.3 QUALITY CONTROL AND TESTING............................................ SS - 3 - 9
3.5.4 CONSTRUCTION.............................................................................. SS - 3 - 10
3.5.5 MEASUREMENT AND PAYMENT................................................. SS - 3 - 13

SS. 3.6 HORIZONTAL SAND DRAIN


3.6.1. DESCRIPTION................................................................................... SS - 3 - 14
3.6.2 MATERIALS...................................................................................... SS - 3 - 14
3.6.3 PLACING SAND DRAIN MATERIAL............................................. SS - 3 - 15
3.6.4 MEASUREMENT AND PAYMENT................................................. SS - 3 - 15

SS. 3.8 GEOGRID


3.8.1. DESCRIPTION................................................................................... SS - 3 - 16
3.8.2 MATERIALS...................................................................................... SS - 3 - 16
3.8.3 QUALITY CONTROL AND TESTING............................................ SS - 3 - 17
3.8.4 MEASUREMENT AND PAYMENT................................................. SS - 3 - 17

DIVISION 5 GRANULAR PAVEMENT

SS. 5.5 FOUNDATION LAYER OF CEMENT TREATED BASE (CTB)


5.5.1. GENERAL.......................................................................................... SS - 5 - 1
5.5.2 REQUIREMENT................................................................................ SS - 5 - 1
5.5.3 IMPLEMENTATION......................................................................... SS - 5 - 5
5.5.4 QUALITY CONTROL....................................................................... SS - 5 - 7
5.5.5 MEASUREMENT AND PAYMENT................................................. SS - 5 - 8

DIVISION 8 REINSTATEMENT AND MINOR WORKS

SS. 8.6 LANDSCAPING


8.6.1 DESCRIPTION................................................................................... SS - 8 - 1
8.6.2 REFERENCES.................................................................................... SS - 8 - 1
8.6.3 MATERIALS..................................................................................... SS - 8 - 1
8.6.4 PREPARATION................................................................................. SS - 8 - 1
8.6.5 PROVISION OF PLANTS................................................................. SS - 8 - 2
8.6.6 PLANTING......................................................................................... SS - 8 - 2
8.6.7 TREES AND SHRUBS...................................................................... SS - 8 - 3
8.6.8 PLANTING BOXES........................................................................... SS - 8 - 4
8.6.9 CLEANING UP.................................................................................. SS - 8 - 4
8.6.10 NURSING........................................................................................... SS - 8 - 4
8.6.11 MEASUREMENT AND PAYMENT................................................. SS - 8 - 4

SS - ii
Special Specification IBRD - Strategic Roads Infrastructure Project

SS.8.7 ROAD LIGHTING


8.7.1 GENERAL.......................................................................................... SS - 8 - 6
8.7.2 MATERIALS...................................................................................... SS - 8 - 8
8.7.3 EXECUTION..................................................................................... SS - 8 - 8
8.7.4 MEASUREMENT AND PAYMENT................................................. SS - 8 - 9

SS.8.8 TRAFFIC LIGHT


8.8.1 GENERAL.......................................................................................... SS - 8 - 10
8.8.2 MATERIALS...................................................................................... SS - 8 - 12
8.8.3 EXECUTION..................................................................................... SS - 8 - 13
8.8.4 MEASUREMENT AND PAYMENT................................................. SS - 8 - 13

SS.8.9 GUIDE SIGN


8.9.1 GENERAL.......................................................................................... SS - 8 - 15
8.9.2 MATERIALS...................................................................................... SS - 8 - 15
8.9.3 EXECUTION..................................................................................... SS - 8 - 17
8.9.4 MEASUREMENT AND PAYMENT................................................. SS - 8 - 17

SS.8.10 DRAIN PIPE


8.10.1 DESCRIPTION................................................................................... SS - 8 - 18
8.10.2 MATERIALS...................................................................................... SS - 8 - 18
8.10.3 CONSTRUCTION............................................................................. SS - 8 - 18
8.10.4 MEASUREMENT AND PAYMENT................................................. SS - 8 - 18

SS.8.11 CONCRETE BARRIER


8.11.1 DESCRIPTION................................................................................... SS - 8 - 20
8.11.2 MATERIALS...................................................................................... SS - 8 - 20
8.11.3 EQUIPMENT AND TOOLS.............................................................. SS - 8 - 20
8.11.4 IMPLEMENTATION OF WORK...................................................... SS - 8 - 21
8.11.5 INSTALLING.................................................................................... SS - 8 - 22
8.11.6 MEASUREMENT AND PAYMENT................................................. SS - 8 - 23

SS.8.12 STEEL PIPE RAILING


8.12.1 DESCRIPTION................................................................................... SS - 8 - 24
8.12.2 MATERIALS...................................................................................... SS - 8 - 24
8.12.3 FABRICATION AND INSTALLATION.......................................... SS - 8 - 24
8.12.4 MEASUREMENT AND PAYMENT................................................. SS - 8 - 25

SS.8.13 ROOFING BY POLYCARBONATE


8.13.1 GENERAL.......................................................................................... SS - 8 - 26
8.13.2 MATERIALS...................................................................................... SS - 8 - 26
8.13.3 EXECUTION..................................................................................... SS - 8 - 26
8.13.4 MEASUREMENT AND PAYMENT................................................. SS - 8 - 27

SS.8.14 SOUND BARRIER


8.14.1 DESCRIPTION................................................................................... SS - 8 - 28
8.14.2 MATERIALS...................................................................................... SS - 8 - 28
8.14.3 EQUIPMENT AND TOOLS.............................................................. SS - 8 – 26
8.14.4 IMPLEMENTATION OF WORKS................................................... SS - 8 – 26

SS - iii
Special Specification IBRD - Strategic Roads Infrastructure Project

8.14.5 MEASUREMENT AND PAYMENT................................................. SS - 8 - 31

SS - iv
Special Specification IBRD - Strategic Roads Infrastructure Project

PREAMBLE TO SPECIAL SPECIFICATIONS

The Specifications as the Standard Specifications form are the basis of the construction specifications
for this project; they are binding and are identified as Part 2 Section VI-2 of the Bidding Documents.

Those Specifications are hereby supplemented and / or amended by these Special Specifications
which is to be incorporated in and become part of the Contract Documents for construction.

For the user’s convenience and quick reference, the individual articles of these Special Specifications
are referenced to the items in the Bid Price Schedule (Bill of Quantities, Part 1 - Section IV) and to
the Specifications.

Section IV gives reference pay item wise to the relevant article of the Special Specifications with SS
marking at the front of pay item numbers.

SS - v