CHECK LIST FOR INSTALLATION OF

HOT & COLD WATER SUPPLY PIPE


WORK

S.No. Description Yes No Remarks


Check that the materials are in accordance
1. with the approved material submittal and
shop drawing
Check the location and routing of pipes are as
2. per approved shop drawing
Check proper supports are provided as per
3.
approved drawing
Check levels or height of bottom of pipe are as
4. per approved shop drawing
Check the pipe joints are properly made, tight
5. and secured
Check whether size of pipes and fittings are
6.
correct as per approved drawing
Check the installation is coordinated with
7.
other services
Check the valves, gauges, PRVs and water
8. hammer arresters are provided as per
approved drawing
9. Check result of hydrostatic pressure testing
Check thickness and workmanship of
10.
insulation
Check whether pipe service
11 identification/label and directional arrow are
provided
12 Check installation is free from damage

Comments:

ARABIAN MEP
AMC AEB
ENGINEER QA/QC

Name

Signature

Date