Sludge Treatment

To sea
or
Drain
or
Cl2 Irrigation
Decceleration Grit
Tank Screen Chamber P.S.T Final S.T

Rising Aeration Contact


Main Retuned Tank Tank
Sludge

Excess Sludge
Sludge Pump

Thickening
Drying
Beds Digestion

Flow Line in activated sludge sewage treatment plant

Objectives of sludge treatment:


1- Reduction of sludge volume
2- Dewatering of concentrated sludge
3- Reducing the area of sludge treatment units
4- Destruction of harmful bacteria
5- Making the sludge inert and easy to be handled
6- Converting as much of sludge as possible to end products (gases,
liquids and little residual biomass)
7- Modifying the structure and characteristics of sludge to reuse it in
different functions (fertilizers – bricks – roads pavement - ….)
8- Saving the expenses of chemicals and equipments required for
sludge disposal

1
Sludge

Thickening
‫التكثيف‬

Digestion
‫التخمير‬

Vaccum Filtration Centrifugation


or ‫التجفيف بالطرد المركزى‬
Pressure Filtration
‫الترشيح بتفريغ الهواء‬

Sludge pond Land application


)Lagoons( (Soil conditioner)

Composting Drying Beds


‫الكمر‬ ‫التجفيف فى أحواض‬

Burying in sanitary Incineration


landfill ‫الحرق‬
‫الدفن‬

2
Thickener
Purpose:
Reduce sludge volume by 20 to 40 % and increase its solid content.

‫ المواد الصلبة‬d‫ وزيادة تركيز‬% 30 ‫ الى‬20 ‫تقليل حجم الحمأة بنسبة من‬

Design Data:
1- Retention Time = 16 – 36 hours
2- Surface Loading Rate = 10 – 25 m3/m2/d
3- Solids Load = 1000 – 1500 gm/ m2/d
4- D = 3 – 7 m
5- n ≥ 1
6- ф≯ 35 m Fixed
Circular
arms
baffle
Motor

Brush

Rotary
arms

Influent

Supernatant Scraper
to P.S.T. Concentrated To drying
Sludge sludge outlet beds
hopper Or
Digestion

Gravity thickener

3
Digestion
Purpose:
1) Decrease sludge volume to 30%
2) Removal of most of organic matters
3) Removal of harmful bacteria.
4) Improve sludge quality for reuse
½ ‫تقليل حجم الحمأة من ⅓ الى‬ -1
‫تقليل المساحات الالزمة لتجفيف الحمأة الى النصف‬ -2
% 10 ‫ الى‬5 ‫زيادة تركيز المواد الصلبة فى الحمأة من‬ -3
‫زيادة فابلية الحمأة للتجفيف بسرعة فى فترة زمنية أقل‬ -4
‫زيادة جودة الحمأة الناتجة كسماد‬ -5
‫ الضارة بالحمأة‬d‫القضاء على البكتريا‬ -6
‫انتاج غازات كنواتج ثانوية تستخدم كوقود فى الصناعة‬ -7

Mechanism:
I- Aerobic digestion
II- Anaerobic digestion

Design criteria:
Anaerobic
Item Aerobic
Mesophelic Thermophelic
1) Temperature oC 15 - 30 oC 30 –37 oC 45 – 50 oC

2) Retention time (t)


2 – 7 days 1 – 2 months 10 – 20 days
{t ∝ 1 / T}
3) Depth (d) m 2–5m ½ → ⅔ ф [diameter]

b = ¼ →⅓ L
4) Dimensions ф≯ 35 m
L ≯50 m
5) Volume reduction
≤ 50 % 30 %
ratio
6) Air requirements 10 – 40 m3/kg/d non

7) volume =½ {influent volume + effluent volume}χtime

4
‫‪Gas‬‬
‫‪Safety‬‬ ‫‪Inspection‬‬
‫‪Dome‬‬
‫‪Gas‬‬ ‫‪Motor‬‬ ‫‪valve‬‬ ‫‪room‬‬
‫‪outlet‬‬

‫‪Overflow‬‬
‫‪Impeller‬‬
‫‪Supernatant‬‬
‫‪to P.S.T.‬‬

‫‪d‬‬

‫‪Influent‬‬
‫‪sludge‬‬
‫‪Digested sludge‬‬
‫‪to drying beds‬‬
‫‪Drain‬‬

‫‪Anaerobic Digester with fixed roof‬‬ ‫)‪(Mesophilic system‬‬


‫فتحة الصيانة ‪inspection room:‬‬ ‫‪)1‬‬
‫تستخدم‪ d‬ألغراض الصيانة مثل البيارة فى غرفة التفتيش‬
‫صمام األمان ‪safety valve :‬‬ ‫‪)2‬‬
‫هذا الصمام يفتح تلقائيا ً عند زيادة الضغط‪ d‬عن حد معين حتى اليحدث إنفحار نتيجة زيادة‬
‫تركيز‪ d‬الغازات‬
‫الموتور ‪motor‬‬ ‫‪)3‬‬
‫يستخدم‪ d‬إلدارة مراوح التقليب ‪impeller‬‬
‫فتحة خروج الغازات ‪gas dome‬‬ ‫‪)4‬‬
‫تستخدم‪ d‬لتجميع الغازات الناتجة عن التفاعل ومعظمها‪ d‬من الميثان إلعادة إستخدامها‪ d‬فى‬
‫التسخين أو إدارة التوربينات‬
‫مخرج الفائض ‪:overflow‬‬ ‫‪)5‬‬
‫يقوم بتجميع المياه الزائدة والتى تعاد مرة أخرى قبل ‪.P.S.T‬‬
‫مدخل الحمأة ‪sludge influent‬‬ ‫‪)6‬‬
‫يقوم بتوزيع الحمأة القادمة من خزان التكثيف على خزان التخمير و ذلك على دفعات عن‬
‫طريق‪ d‬فنحات فى ماسورة المدخل‬
‫مخرج الحمأة المتخمرة ‪digested sludge outlet‬‬ ‫‪)7‬‬
‫يتم خروج الحمأة تحت تأثير الضغط الهيدروليكى حيث تذهب إلى أحواض التجفيف‬
‫فتحة تصريف ‪drain‬‬ ‫‪)8‬‬

‫‪5‬‬
‫ سواء‬d‫ ألغراض الصيانة حيث نفتح محبس يسحب كل الحمأة من فتحة التصريف‬d‫تستخدم‬
by gravity ‫بالطلمبات أو بالراحة‬
roof or cover ‫) الغطاء‬9
]‫سقف الخزان (الغطاء) قد يكون ثابت أو متحرك [يكون على نطاق صغير‬
‫) موضع الخزان‬10
‫يفضل أن يكون معظمه تحت األرض ما عدا الجزء العلوى منه للحفاظ غلى درجة الحرارة‬
‫ثابتة عند قيمة معينة و لعدم فقد الحرارة منه بالتالمس مع الهواء‬
:‫) الخبث‬11
‫ُيجمع الخبث على السطح لذلك توجد قيمة لتكسير تلك الطبقة حتى تخرج الغازات ألنها لو‬
safety valve ‫ظلت محبوسة بداخل الخزان فقد ينفجر لذلك يوجد‬

Purification Action that take place in digestion tanks:

Sludge is collected from P.S.T. & final S.T. in digestion tank that is
closed and isolated from air (in case of anaerobic reaction). The sludge is
mixed with impellers to distribute the temperature and fix it in the tank.
The reaction depends on the availability of air as follows:

I – Aerobic reaction:
The sludge retention period is not more than 7 days. In the presence of
air, the aerobic bacteria activate and start breakdown the organic matters

Organic matter+ O2 Aerobic Stable organic matter + new cells + H2O


Bacteria + CO2

But this type of reaction is expensive due to air requirements.

II – Anaerobic reaction:
In the absence of oxygen, the anaerobic bacteria activate and decompose
organic matters into stable matters in addition to many gases.

Organic matter Anaerobic Stable organic matter + new cells + H2O


Bacteria + CO2+ NH3+ CH4+H2S

Methane {CH4} represents the major part of these gases [65-70%]. It is


used in heating & operating electric generators. Most sewage treatment
plants flare the rest of it.

‫ عن الهواء ويتم تقليبها بواسطة‬d‫يتم تجميع الحمأة داخل خزان التخمير المغلق والمعزول‬
}‫ داخل الخزان ليبدأ التفاعل الالهوائى{حيث أنه أرخص‬d‫مراوح لتوزيع درجة الحرارة وتثبيتها‬
ً ‫بين البكيريا التى تتغذى على المواد العضوية تحت درجة حرارة عالية نسبيا‬

6
‫ونتيجة التفاعل تنتج غازات تتصاعد ألعلى وتخرج من ماسورة خروج الغازات وتترسب المواد‬
‫المثبتة فى القاع حيث تسحب وتجفف فى أحواض التجفيف كذلك يتصاعد الماء الملوث إلى أعلى‬
‫حيث يسحب ويعاد إلى ما قبل خزان الترسيب اإلبتدائى‬

‫‪Factors affecting digestion:‬‬


‫‪1- Temperature : T∝ efficiency  heating is applied‬‬
‫بزيادة درجة الحرارة ‪ - :‬يكون التفاعل أسرع‬
‫‪ -‬يقل حجم األحواض‬
‫نظم التسخين ‪:‬‬
‫‪ -1‬سحب الحمأة وتسخينها خلالل سرابنتينا‪ d‬وإعادتها مرة أخرى للخزان‬
‫‪ -2‬عمل خزان به أنابيب مياه ساخنة‬
‫‪ -3‬تنفيذ اإلسلوبين معا ً‬
‫‪4- Retention period:‬‬
‫‪t∝1/T‬‬
‫بزيادة الزمن نحصل على نتائج أفضل‬
‫‪5- Rate of dosing sludge :‬‬
‫‪dosing of sludge ∝ efficiency‬‬
‫إدخال الحمأة إلى الخزان على جرعات أو دفعات يزيد الكفاءة‬
‫‪6- ph value:‬‬
‫‪7-8 best results‬‬
‫‪ 4 worst action‬‬
‫‪7- Mixing :‬‬
‫‪∝ efficiency‬‬

‫‪8- Type of sludge source :‬‬


‫‪source‬‬ ‫‪S.S.‬‬ ‫‪B.O.D.‬‬ ‫‪Bacteria‬‬
‫‪P.S.T.‬‬ ‫‪big conc. 3-5%‬‬ ‫‪big conc.‬‬ ‫‪Small no.‬‬
‫‪F.S.T. (T.F.) Big‬‬ ‫‪2-4 %‬‬ ‫‪Small‬‬ ‫‪Big no.‬‬
‫‪F.S.T. (A.T.) Small‬‬ ‫‪Small‬‬ ‫‪Big no.‬‬
‫كلما مرت الحمأة بمراحل معالجة أكثر كلما كانت أكسدتها‪ d‬أصعب ومقاومتها‪ d‬للتفاعل أعلى‬
‫أى تحتاج لزمن أكبر عكس لو كانت ‪ fresh‬مثل الحمأة الناتجة من ‪ .P.S.T‬التى تسهل‬
‫أكسدتها ويقل زمن بقائها فى الخزان‬
‫‪7-Amount o organics‬‬
‫‪8-Homogeneity inside tank‬‬
‫‪9-Stability of gases and supernatant removal from tank.‬‬
‫‪10-Inlet and outlet arrangement‬‬
‫‪11-Toxicity in sludge‬‬

‫‪7‬‬
Drying Beds

Purpose:
Removal of all water content in the sludge to facilitate its reuse.

‫ فيها‬d‫تجفيف الحمأة بغرض التخلص من المياه الموجودة بها لسهولة التصرف‬

Approximate method for design:


I- In Trickling filter plant:
Area required = population/ 10 m2
II- In Activated sludge plant:
Area required = population/ 15 m2

Accurate method:
1- calculate sludge volume
2- thickness of sludge layer = 10 – 30 cm
3- drying period = 5- 9 days 5 days for upper Egypt
7 days for Cairo
9 days for sea sides
4- We lay a sludge layer about 10 cm thickness and it is left to dry.
5- After 5 –7 days we lay a new sludge layer about 10 and it is left to
dry.
6- The process continues until the sludge layer reaches  30 cm
7- The last layer is covered by sand (to avoid flies growing)
8- Area of bed = 55 or 1010 20 m  20 m
[10 20 is normally used]

Process:
These beds are shallow beds with area ranging between 100 and 200 m2.
It is constructed by using sulphate resisting cement. There is under
drainage system to collect the penetrated wastewater. It is returned back
before P.S.T. to be treated because it is much polluted.

8
Sludge layer (≯30 cm) Digested Sludge

Sand layer (25 cm)

Gravel layer (30 cm)

Under drainge
system Bed body

Solids Water content

ٍSewage 0.5 % 99.5%


Primary sludge 5% 95%
Digested sludge 10 % 90%