CorrigendumIItoRFP SD WAN
CorrigendumIItoRFP SD WAN
Solution
Reference No :IDBI /VMG/ RFP/2019 -20/044, Dated 06-09-2019 and Corrigendum-I Dated 30-09-2019
2 18 11.1 Delivery of network equipment’s will be at IDBI DC- 11.1. Delivery of network equipment’s will be at IDBI DC-
Mumbai, DR-Chennai & IDBI Bank branch locations Pan Mumbai, DR-Chennai & IDBI Bank branch locations Pan – India
– India within 6 (Six) weeks for all locations except within 8 (Eight) weeks for all locations except Road Permit
Road Permit locations from the date of placement of locations from the date of placement of order / order list
order / order list provided by the dealing group. Two provided by the dealing group. Two (2) additional weeks will be
(2) additional weeks will be given for the branches given for the branches which are falling under Road Permit.
which are falling under Road Permit.
3 18 11.2 Installation (power-on, basic installation, 11.2. Installation (power-on, basic installation, configuration,
configuration, licenses activation (if any) & material licenses activation (if any) & material verification against
verification against purchase order/delivery purchase order/delivery challan/BOM) to be completed within 4
challan/BOM) to be completed within 3 months from months from the date of placement of order / order list
the date of placement of order / order list provided by provided by the Bank
the Bank
4 PAYMENT 10.1. Delivery and Installation of Network Equipment: 10.1. Delivery and Installation of Network Equipment:
TERMS 10.1.1 No advance payment will be made on award of 10.1.1 No advance payment will be made on award of the
the contract contract
10.1.2 Payments will not be released for any part- 10.1.2 Payments will not be released for any part-shipment or
shipment or short-shipments short-shipments
10.1.3 40% on delivery of all Equipment/s of respective 10.1.3 40% on delivery of all Equipment/s of respective
Purchase Order (P.O). Purchase Order (P.O).
10.1.4 40% after installation and commissioning of 10.1.4 40% after installation and commissioning of equipments
equipments at all locations mentioned in the at all locations mentioned in the respective Purchase Order
respective Purchase Order (P.O), subject to successful (P.O), subject to successful running of the devices for at least 15
Corrigendum –II to RFP for Supply, Installation, Commissioning & Maintenance of Software Defined Wide Area Network (SD-WAN) Solution
Reference No :IDBI /VMG/ RFP/2019 -20/044, Dated 06-09-2019 and Corrigendum-I Dated 30-09-2019
14 117 & 19 Appliance must be able to integrate with central Appliance must be able to integrate with central authentication
118 authentication solutions such As Active solutions such as Active Directory/TACACS (or similar) and SIEM
Directory/TACACS and SIEM.
Corrigendum –II to RFP for Supply, Installation, Commissioning & Maintenance of Software Defined Wide Area Network (SD-WAN) Solution
Reference No :IDBI /VMG/ RFP/2019 -20/044, Dated 06-09-2019 and Corrigendum-I Dated 30-09-2019
37 124 Annexure-III Bidder/OEM should have supplied and should have Bidder/OEM should have supplied and should have deployed
Eligibility deployed and maintaining SD-WAN (Software Defined and maintaining SD-WAN (Software Defined –Wide Area
Criteria point –Wide Area Network) solution in any Scheduled Network) solution in any Scheduled Commercial Bank/PSU/
4 Commercial Bank/PSU/ Govt.Organization /Govt. Unit/ Govt.Organization /Govt. Unit/ BFSI/ Company Globally for
BFSI/ Company (Publicly listed) Globally for i) Minimum 100 discrete locations in Single order or Multiple
Minimum 100 discrete locations in Single order or order to build a single solution as on RFP issue date.
Multiple order to build a single solution as on RFP issue
date.
Corrigendum –II to RFP for Supply, Installation, Commissioning & Maintenance of Software Defined Wide Area Network (SD-WAN) Solution
Reference No :IDBI /VMG/ RFP/2019 -20/044, Dated 06-09-2019 and Corrigendum-I Dated 30-09-2019
40 32 18.2.12 The Bank will shortlist the bidders on technical The Bank will shortlist the bidders on technical evaluation
evaluation criteria subject to a minimum 65% passing criteria subject to a minimum 65% passing score for the next
score for the next process i.e. Opening of Indicative process i.e. Opening of Indicative Commercial bid and ORA.
Commercial bid and ORA. Relaxation of 10% in the
minimum passing score may be extended if the
number of bidders qualifying the passing score is less
than three.
41 30 18.2.10 point Number of implementations and maintenance by Stands Deleted
no 3 the bidder of same SD-WAN solution as proposed
in this RFP with same OEM in scheduled
commercial Banks/PSU/Govt. Organizations/BFSI
Globally having minimum 100 locations /
branches per organization as on the date of the
RFP. Bidder has to submit Certificate of
Satisfactory working from respective organization
clearly specifying the solution & since when
Corrigendum –II to RFP for Supply, Installation, Commissioning & Maintenance of Software Defined Wide Area Network (SD-WAN) Solution
Reference No :IDBI /VMG/ RFP/2019 -20/044, Dated 06-09-2019 and Corrigendum-I Dated 30-09-2019
The bidder should provide details of previous experience in implementing SD-WAN solution. The bidder’s past experience shall be evaluated as
below: