REF - No. YA-CAVIFOOD-DRA-W05-D300: Curb Installation For Road Sand Backfill Near Fence
REF - No. YA-CAVIFOOD-DRA-W05-D300: Curb Installation For Road Sand Backfill Near Fence
Curb installation for road work Rebar work for ramp at factory
Mix M30 testing around warehouse 27 Test sand backfill around factory 80x90
Formwork and rebar for ramp at factory Casting concrete for ramp at factory
Casting concrete for ramp Casting concrete for footing of ramp at factory
Casting concrete ramp 50mm for ramp at w27 Elevation of sand near fence
Page: 28
Rebar arragement for ramp at warehouse 24 Put elevation for stone 40x60
Mix M30 elevation for ramp at warehouse 27 Compact natural sub-base sand in front of office
Spread mix M30 around warehouse 27 Casting concrete for ramp warehouse 25
Tilling work for footing of national symbole Painting work at guard house
Page: 26
Spread mix m30 near warehouse 27 Rebar arragement for ramp at warehouse 25
Soil elevation for road work Spread stone 40x60 for road work
Painting work at transformer room Tilling work for wall at guard house
Page: 23
Rebar arragement for ram at war27 Laying brick for formwork of mainhole
Put RC storm drainage pipe Clean joint before puring bitument at dryingground
Sand elevation for road work Laying brick for formwork of mainhole
Casting concrete for slab at drying ground Sample for compressive test
Sand testing for natural subbase around war27 Soil excavation for storm drainage pipe
Remove formwork for slab at drying ground Compact sand for road work
Casting lean concrete for support drainage pipe Put cover for septic tank near guard house
Page: 12
Painting matis layer at transformer room Casting concrete for support of fence
Page: 11
Soil excavation for storm drainage Sand elevation for slab at drying ground
Casting lean concrete for support drainage pipe Throw water on slab
Page: 9
Meeting for handover of BMB Steel frame Casting concrete at drying ground
Lean concrete for support of RC drainage pipe Compact sand at drying ground
Put PVC layer before casting concrete Casting concrete for rail of door in front of factory
Page: 6
Cutting concrete footing of ram at factory 80x90 Dig soil for RC drainage pipe
PVC layer and rebar arragement for rail of door Painting door
Page: 5
Plustering gate's name near guardhouse Soil elevation for door in front of factory 80x90
Put RC drainage pipe at drying ground Cutting concrete footing of ram at factory 80x90
Lean concrete for support RC drainage pipe Dig soil for RC drainage pipe
Casting concrete at drying ground Lean concrete for support of RC drainage pipe
Slump test and cubic sample for testing Dig soil for RC drainage pipe
Painting matis layer at transformer room Dig soil for rail of door in front of factory 80x90
Page: 2
PVC layer and elevation work at drying ground Remove formwork for manhole
Cutting concrete footing of ram at w24 Pure bitument for joint at factory 80x90