RAIL VIKAS NIGAM LIMITED

Construction of third line track between JIMIDIPETA (INCL) (KM 356.518) – GOTALM (INCL) (KM 462.255) - Construction Of Roadbed, Bridges, Supply of Ballast, Installation of Track (Excluding Supply
of Rails, BG Main Line Sleepers) Service and Residential Buildings including amenities, Passenger amenities at stations, SWS, TSS and related works along with General Electrical Works in Waltair Division
of East Coast Railway in Odisha & Andhra Pradesh States, India.- Package-06
RFI Summary 26-02-2021

BOQ ITEM Chainage Chainage Date of Date of PRASAD-TTIPL(JV)


S.NO RFI NO Description Side Time Remarks
NO From To Submission Inspection Representative
Retaining wall 2nd footing Shuttering
1 - 64+240 64+265 BHS 26-02-2021 27-02-2021 09:30
checking
2 2005 Retaining wall 2nd footing (MCC 25) 64+240 64+265 BHS 26-02-2021 27-02-2021 10:00 Shiva
Retaining wall 3rd footing Reinforcement (9989903088)
3 2076 64+060 64+080 BHS 26-02-2021 27-02-2021 14:00
& shuttering checking
4 2005 Retaining wall 3rd footing (MCC 25) 64+060 64+080 BHS 26-02-2021 27-02-2021 14:30
5 7005 Earth work Excavation for Retaining wall 72+180 72+220 BHS 26-02-2021 27-02-2021 09:00
6 2004 Retaining wall PCC M20 concrete 72+180 72+220 BHS 26-02-2021 27-02-2021 14:00
Retaining wall 1st footing Shuttering 72+400 72+420
7 - BHS 26-02-2021 27-02-2021 11:30
VBL-GTLM/STR/226 checking 72+440 72+460
72+400 72+420
8 2005 Retaining wall 1st footing (MCC 25) BHS 26-02-2021 27-02-2021 12:00
72+440 72+460
Saikumar
Br No 866 Earth work Excavation Barrel
9 2001 a BHS 26-02-2021 27-02-2021 11:00 (7981735180)
portion 71+450
10 - Br No 866 Dust filling Barrel portion BHS 26-02-2021 27-02-2021 12:30
11 2037 Br No 867 Rail pilling BHS 26-02-2021 27-02-2021 12:30
Br No 867 Earth work Excavation Barrel 71+685
12 2001 a BHS 26-02-2021 27-02-2021 14:00
portion
13 - Br No 867 Dust filling Barrel portion 71+685 BHS 26-02-2021 27-02-2021 16:00
14 1001 Embankment 15th layer FDD checking 99+200 99+360 BHS 26-02-2021 27-02-2021 15:30 Satya
VBL-GTLM/EW/226
15 1001 Embankment 4th layer FDD checking 98+860 98+920 BHS 26-02-2021 27-02-2021 11:00 (8309657409)
7 days compressive strength checking of
16 - Br No 866 2nd footing VBL & VZM end BHS 26-02-2021 27-02-2021 14:30
(M25)
7 days compressive strength checking of
17 - Retaining wall 3rd footing from Ch BHS 26-02-2021 27-02-2021 15:00
64+140 to 64+160 (M25)
28 days compressive strength checking of
18 - Retaining wall 1st footing from Ch BHS 26-02-2021 27-02-2021 15:30
64+020 to 64+040 (M25)
28 days compressive strength checking of AS Mahapatra
VBL-GTLM/LAB/292 Badangi Lab
19 - Retaining wall 2nd footing from Ch BHS 26-02-2021 27-02-2021 16:00 (7978769448)
64+120 to 64+140 (M25)
28 days compressive strength checking of
20 - Retaining wall 2nd footing from Ch BHS 26-02-2021 27-02-2021 16:30
64+080 to 64+100 (M25)
28 days compressive strength checking of
21 - Retaining wall PCC from Ch 63+940 to BHS 26-02-2021 27-02-2021 17:00
63+960 (M25)
Cement Testing of Sagar OPC 53 Grade
22 - BHS 26-02-2021 27-02-2021 17:30
Week No 08/2021 (Sample-1)
Ganesh
23 VBL-GTLM/BLD/115 - LC-329 Gate Goomty, Brick Masonry LC-329 BHS 26-02-2021 27-02-2021 10:00
(9505969549)
Ballast Stack Seive Analysis Stack No-2B, Bala Krishna
24 VBL-GTLM/PW/037 - 57+535 (414/35) BHS 26-02-2021 27-02-2021 11:00
3B, 4B (8756038391)