Project Location Owner Subject
Project Location Owner Subject
Project Location Owner Subject
Item Labor
No
WORK DESCRIPTION QTY UNIT Unit Cost Total Cost
Cost
Page 1 of 18
SUBJECT : RENOVATION OF EXISTING STRUCTURE TO NEW OFFICE SPACE
Item Labor
No
WORK DESCRIPTION QTY UNIT Unit Cost Total Cost
Cost
Page 2 of 18
SUBJECT : RENOVATION OF EXISTING STRUCTURE TO NEW OFFICE SPACE
Item Labor
No
WORK DESCRIPTION QTY UNIT Unit Cost Total Cost
Cost
Page 3 of 18
PROJECT : PROPOSED RENOVATION OF PFF, INC. TO NEW OFFICE SPACE
LOCATION : RUSSET COR RAINBOW ST., MARIKINA CITY
OWNER : PFF, INC.
SUBJECT : NEW OFFICE SPACE (NEGOSYO CENTER)
Item Material
No
WORK DESCRIPTION QTY UNIT Unit Cost Labor Cost Total Cost
Cost
Item
No
WORK DESCRIPTION QTY UNIT Unit Cost Total Cost Labor Cost
629,225.00 166,267.50
Item
No
WORK DESCRIPTION QTY UNIT Unit Cost Total Cost Remarks
4.0 MACHINES
Removal of Machines(w/ Equipment)
4.01 1.00 lot 50,000.00 3,000,000.00 Labor included
4.02 LABOR pax - 60 days work
Machine Works Subtotal 3,000,000.00
E-mail
: 645-2164 / 994-4206
Telefax No. : 646-1837
: crystaldev1998@yahoo.com
DEVELOPMENT CORPORATION
Item No WORK DESCRIPTION QTY UNIT Unit Cost Material Cost Labor Cost
A GENERAL
A1 New plumbing lines
* P.E Hose 1/2 5 rolls 8,000.00 40,000.00 16,000.00
* P.E Connector 1/2 100 pcs 125.00 12,500.00 5,000.00
* Elbow 1/2 450 pcs 75.00 33,750.00 13,500.00
* Gate Valve 1/2 85 pcs 750.00 63,750.00 25,500.00
A2 Drainage Works
* CHB #6 5,625 pcs 15.00 84,375.00 33,750.00
* 10mm x 6.0m Gr. 40 665 pcs 125.00 83,125.00 33,250.00
* 12mm x 6.0m Gr. 40 125 pcs 185.00 23,125.00 9,250.00
* GI Tie Wire #16 5 kgs 1,450.00 7,250.00 2,900.00
* 3/8 Formply 112 pcs 720.00 80,640.00 32,256.00
* 2x3x10 Coco Lumber 350 pcs 110.00 38,500.00 15,400.00
* Assorted Nails 45 kgs 90.00 4,050.00 1,620.00
* Scrap Roof 3,215 kgs 35.00 112,525.00 45,010.00
* RMC 3000 PSI 23 cu.m 3,300.00 74,250.00 29,700.00
* S-1 Sand 5 t/l 10,900.00 54,500.00 21,800.00
* Cement 474 bags 240.00 113,760.00 45,504.00
A3 Renovation Plans 1 lot 250,000.00 250,000.00
A4 Supply&Install of electrical lines
* 2.0mm² THHN Wire - 0.00
* 3.50mm² THHN Wire 3 boxes 2,850.00 8,550.00 3,420.00
* 5.50mm² THHN Wire 3 boxes 4,600.00 13,800.00 5,520.00
* PVC Conduit Pipe ½ 250 pcs 75.00 18,750.00 7,500.00
* Flexible Hose ½ 3 rolls 780.00 2,340.00 936.00
* U-Box 40 pcs 35.00 1,400.00 560.00
* J-Box 70 pcs 60.00 4,200.00 1,680.00
* E.Tape 5 pcs 30.00 150.00 60.00
* Circuit Breaker 20 Amps 4 pcs 540.00 2,160.00 864.00
GENERAL WORKS SubTotal 1,127,450.00 350,980.00
B ADMINISTRATION BUILDING
B1 Renovation/Expansion of Mtg. Room
* Studs 40 pcs 140.00 5,600.00 2,240.00
* Metal Furring 150 pcs 90.00 13,500.00 5,400.00
* Wall Angle 30 pcs 75.00 2,250.00 900.00
* Concrete Nail 5 kgs 90.00 450.00 180.00
* Primaflex 20 pcs 350.00 7,000.00 2,800.00
* Blind Rivets 2 boxes 1,000.00 2,000.00 800.00
* Doors and Door Jambs 1 set 6,500.00 6,500.00 2,600.00
-
Meeting Room SubTotal 37,300.00 14,920.00
B2 Renovation of Admin CR
* HCG Water Closets 3 sets 7,500.00 22,500.00 9,000.00
* 30x30 Ceramic Tiles 4,100 pcs 45.00 184,500.00 73,800.00
* P.Cement 30 bags 240.00 7,200.00 2,880.00
* Tile Adhesive 20 bags 260.00 5,200.00 2,080.00
* WaterProofing 1 lot 10,000.00 10,000.00 4,000.00
* Others 1 lot 5,000.00 5,000.00 2,000.00
Renovation of Admin CR Subtotal 234,400.00 93,760.00
C DORMITORY
* Repair/Cleaning of Roof and Gutters 1 lot 150,000.00 150,000.00 60,000.00
* Metal Furring 950 pcs 90.00 85,500.00 34,200.00
* Blind Rivet 1/8 x 1/2 10 boxes 1,000.00 10,000.00 4,000.00
* Drill Bit 1/8 x 1/2 5 pcs 80.00 400.00 160.00
* W-Clip 2,850 pcs 3.50 9,975.00 3,990.00
* 30x30 Ceramic Tiles 15,000 pcs 45.00 675,000.00 270,000.00
* P.Cement 60 bags 240.00 14,400.00 5,760.00
* Tile Adhesive 60 bags 260.00 15,600.00 6,240.00
* WaterProofing 1 lot 35,000.00 35,000.00 14,000.00
* HCG Water Closets 13 sets 7,500.00 97,500.00 39,000.00
* Shower Enclosure 13 sets 15,000.00 195,000.00 78,000.00
* Electrical 1 l.s 150,000.00 150,000.00 60,000.00
* Repainting Works 1 l.s 450,000.00 450,000.00 180,000.00
* Others 1 lot 120,000.00 120,000.00 48,000.00
Dormitory SubTotal 2,008,375.00 803,350.00
D DIAMOND ROOM
* Repair/Cleaning of Roof and Gutters 1 lot 65,000.00 65,000.00 26,000.00
* 30x30 Ceramic Tiles 1,200 pcs 45.00 54,000.00 21,600.00
* P.Cement 20 bags 240.00 4,800.00 1,920.00
* Tile Adhesive 20 bags 260.00 5,200.00 2,080.00
* WaterProofing 1 ls 12,000.00 12,000.00 4,800.00
* HCG Water Closets 3 sets 7,500.00 22,500.00 9,000.00
* Electrical 1 l.s. 70,000.00 70,000.00 28,000.00
* Repainting 1 lot 250,000.00 250,000.00 100,000.00
* Others 1 l.s. 10,000.00 10,000.00 4,000.00
Diamond SubTotal 493,500.00 197,400.00
E FUNCTION ROOM
* Repair/Cleaning of Roof and Gutters 1 lot 75,000.00 75,000.00 30,000.00
* Repainting 1 lot 415,000.00 415,000.00 166,000.00
* Electrical 1 lot 96,000.00 96,000.00 38,400.00
* Polish of Marble Tiles 1 lot 18,000.00 18,000.00 7,200.00
* Rehab of ramp 1 lot 41,000.00 41,000.00 16,400.00
* Expansion of pathway 1 lot 12,500.00 12,500.00 5,000.00
* Repair of Lobby 1 lot 18,000.00 18,000.00 7,200.00
* Rehab of doors 1 lot 65,000.00 65,000.00 26,000.00
* 30x30 Ceramic Tiles 1,150 pcs 45.00 51,750.00 20,700.00
* HCG Water Closets 3 sets 7,500.00 22,500.00 9,000.00
* Rehab of jalousie 1 l.s. 15,000.00 15,000.00 6,000.00
* Sliding Windows/analok frame 1 lot 63,500.00 63,500.00 25,400.00
* Others 1 lot 25,000.00 25,000.00 10,000.00
Function Room Subtotal 918,250.00 367,300.00
F CANTEEN
* Repair/Cleaning of Roof and Gutters 1 lot 60,000.00 60,000.00 24,000.00
* Repainting 1 lot 225,000.00 225,000.00 90,000.00
* Electrical 1 lot 93,000.00 93,000.00 37,200.00
* Polish of Marble Tiles 1 lot 16,500.00 16,500.00 6,600.00
* Rehab of Handrail 1 lot 15,000.00 15,000.00 6,000.00
* Replacement of doors 1 lot 25,000.00 25,000.00 10,000.00
* Rehab of jalousie 1 l.s. 15,000.00 15,000.00 6,000.00
* Others 1 lot 15,000.00 15,000.00 6,000.00
Canteen Subtotal 464,500.00 185,800.00
TOTAL 9,793,940.00
Total Cost
56,000.00
17,500.00
47,250.00
89,250.00
118,125.00
116,375.00
32,375.00
10,150.00
112,896.00
53,900.00
5,670.00
157,535.00
103,950.00
76,300.00
159,264.00
250,000.00
-
11,970.00
19,320.00
26,250.00
3,276.00
1,960.00
5,880.00
210.00
3,024.00
1,478,430.00
7,840.00
18,900.00
3,150.00
630.00
9,800.00
2,800.00
9,100.00
52,220.00
31,500.00
258,300.00
10,080.00
7,280.00
14,000.00
7,000.00
328,160.00
56,000.00
94,500.00
774,900.00
23,520.00
65,520.00
119,000.00
12,740.00
86,310.00
16,275.00
1,890.00
9,800.00
7,000.00
100,100.00
6,440.00
5,460.00
42,000.00
161,000.00
105,000.00
64,400.00
-
70,000.00
1,821,855.00
210,000.00
119,700.00
14,000.00
560.00
13,965.00
945,000.00
20,160.00
21,840.00
49,000.00
136,500.00
273,000.00
210,000.00
630,000.00
168,000.00
2,811,725.00
91,000.00
75,600.00
6,720.00
7,280.00
16,800.00
31,500.00
98,000.00
350,000.00
14,000.00
690,900.00
105,000.00
581,000.00
134,400.00
25,200.00
57,400.00
17,500.00
25,200.00
91,000.00
72,450.00
31,500.00
21,000.00
88,900.00
35,000.00
1,285,550.00
84,000.00
315,000.00
130,200.00
23,100.00
21,000.00
35,000.00
21,000.00
21,000.00
650,300.00
630,000.00
630,000.00
14,000.00
16,800.00
7,000.00
7,000.00
-
44,800.00
9,793,940.00