Assignment of MT
Assignment of MT
5alUtion
Contact Length, L-R-)
300 (20-/2)
= 48.9qmm
12
= 051
Avernge flow Stress. Yp = ke"
1+n
049
895x051
+0 49
43228MPa
Rolling tore, F-Y4xwxL
432 28x 250x 48 99
52943493N
Tarque req to drive eAch roll,
T:05xFx
3
05x52943493x4899x |o
129685I Nm
Pawer (in kw) =
2x FLN
60000
F
3
2x314x 52943493x4849x |ox/o0
60000
2716-12 WRN6 kN
Power (in HP) = I34|x 2716 12
= 364232 HP
3 64 HP
Derive an analytical expressian for the magnu tude of
Back ten5ion in arder ta make the pOwered rall5 beg1n
to 5up
15 Too
H- Ro lls will begin to 5lip if the batk tension
neutral point
hi9n. 5ipping of the ro lls means thot the
whole con tact
ha5 moved to exit of the roll gop. Thes
area betomes the entty 2one.
Now
Let
= Flow5tress
M Cocfficient of tmchion
6 Beck tension
ho Initial thickness
he Final thickness
P Pre55ure
We khow that pressore in ety z0nt
P f-)hen[H-H
ho
NoW, When = 0, H- 0, Hence the pre5ure at et5,
e HH%
ho
Hlso. at the exit, the pressure is egual to Ye
4-4-)|be
eH
ho
MHo HHo
he \e
ho ho
MHo MHo
heee
ho
ho
MHo
Divide both 5itès by hee
h
- MHo
hee
ho
AHo
-|h»\
he
where, H,- 2 R ton Ro\ with -
h he
Mex.pressure
Fressure
Y-
D1stance
Fg Effectof Beck&
frant tension
K3 AsStTIp with a
Cross RLton ot l5omn x 6mm 15 beng
alled wth 20o/ reduthm Ot ored uU5ing L4oom hameter
5teel rolls Before 8 after roling, the 5hearyield 5 tress
Of the matenol 15 035 KN/nm g 04KN/mn respertrvely
Calulate n the tial stnp thIcknes5 ,in the averoge
5hear yeld stress doring the proes5. Assume the Coeff
0f ficton to be 0.1
K- Kt Kf
2
=0 35+04
2
0375 KN/mm2
ot48mm
6
K-0375 KN/mm
Derive en for theaverage pe55ure
expres5Ion
in
mK
+dx
y
From equilibrum in the X-directian,
Rtd)h +2mKdx-gh 0
5olving tor d
d 2 m k dx
h
Integraing
6R=2mhx+C
h
Where C i5 a Constant. The bouncery rondition is that
8T X=0, 5 =0,50 that,
O:-2mk_a)t C
h
Theretore,
C 2mKa
h
&62mK(a-X)
h
Oie pressure,
Plain Strain,Y-2Y
.Bk
2
K
NoW
5mh (a-x)-Y
oy = y'1+mlb-x)
h
ND, 0X 43,
I ma+
h
SyY/Itma
2h
For Sticking, m=12
2h
5 Explan Tandem rolung, 5teckle rolling,Ring rolling&
With ncat sketche5
Thrcad rolling operathon5
A-I Tandem rolling
2 3 4 5 6
Stand1
30 I77 L 66 T 2
Jo 76 4 416 n
26s
ts
45 L Pay off
Take-upo18
Tke-up
rel 026 034 056 09
rel
45/225mm
Stond5 5tand 6
+ +
1
Fig.Taniem rullinq
Looper Roll5tand
Orwe
Input Roller [onveyor5 Output
-
Fio.5teckel Rollng
ued to feed the matenal
Coilers are
I n 5teckel mill two
thraugh mill.
+Une CDler is on the entrance side the other an the ew T
5Ide
the mill, 9 ten mateial
The coilers pull the matenal thmugh
desired
15 fed bech & forth thmu9h the mill unhl the
thickne s55 i5 reached
U5ed to proces5 5teel5labs into hot rolled ail.
I t is
3. Ring Ralling
i ver
weerperr
Fouding fD{i
-dleral
Workpiere-
doing rl
4ThreedRalling Noving de
Blank
5tahamrydie-
a Flatdies
Norkpece Moung
5tahonar Cylindrial
die
irdnca
die
-Force
WorKrest
-X-